Provident Park Square 5
1, 2 & 3 BHK apartments by Puravankara Limited · Mallasandra, Kanakapura Road, Bengaluru
Mallasandra, Kanakapura Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- RERA not updated: completion promised Jun 2026; no extension or completion filed
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Provident Park Square 5 at a glance
- Possession (RERA)Jun 2026 Date passedWas Dec 2024 · Karnataka RERA
- Construction91% built · on pace for Aug 2026 1 mo after RERA dateRERA filing to 31 Dec 2025; estimate from average pace
- Homes booked594 bookedRERA lists 185 homes; figures as filed · RERA update · as on 31 Dec 2025
- RERA complaints (project)2 complaintsKarnataka RERA · as on 13 Oct 2026
- Approvals filed1 of 9 on RERAKarnataka RERA uploads · 13 Oct 2026
- Nearest metroThalaghattapura · 1.08 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 168 min at peak41.57 km straight line · estimate
- Nearest lakeJogi Kere · 308 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Provident Park Square 5 is a residential project by Puravankara Limited in Mallasandra, Bengaluru with 185 homes, registered with Karnataka RERA. The completion date on RERA is 30 Jun 2026.
Facts collected on 13 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Provident Park Square 5 buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Puravankara Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Provident Park Square 5 buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 1 BHK, 2 BHK, 3 BHK
- Carpet area
- 344 – 903 sq ft
- Towers
- 6
- Floors
- 14
- Total homes
- 185
- Land
- 7.54 acres
- Possession (extended)
- Jun 2026
- Built (RERA update)
- 91%
Provident Park Square 5 RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/310/PR/200226/003305
- Registered on
- 26 Feb 2020
- Promised completion
- 31 Dec 2024
- Extended to
- 30 Jun 2026
- RERA status
- New launch
- Homes booked
- 594 of 185 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| 1A | 14 | 1 | 119 |
| 2B | 13 | 1 | 104 |
| 2A | 13 | 1 | 104 |
| 3A | 13 | 1 | 104 |
| 3B | 13 | 1 | 104 |
| Tower 6 | 6 | 0 | 66 |
A dash (—) means the filing did not state that value.
Summary in plain English
Provident Park Square 5 is a residential project by Puravankara Limited in Mallasandra, Bengaluru South, comprising 185 homes across 6 towers. The project was registered with RERA on 26 February 2020 with an original completion date of 31 December 2024, extended to 30 June 2026.
Written by AI from the RERA record above on 13 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 13.9% of land
- Water and power
- Not found in public records yet: water and power
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- STATE BANK OF INDIA, Commercial Branch
- Project cost declared to RERA
- ₹240 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
Provident Park Square 5 location and address
- Address
- Sy No 3/3, 7, 8/1, 9/2A, 9/2B1, 26/1 Mallasandra Village, Uttarahalli Hobli
- Village (RERA)
- Mallasandra
- Locality
- Kanakapura RoadAlso known as Kanakapura Main Road
- PIN code
- 560042
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.86222, 77.54157
Distances to landmarks
Not found in public records yet: landmarksAbout Kanakapura Road
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 13.25 km | approx. 54 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 13.45 km | approx. 54 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 16.61 km | approx. 67 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 22.35 km | approx. 91 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 25.43 km | approx. 103 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 41.57 km | approx. 168 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 10Schools and colleges9 schools, 1 colleges, 0 kindergartens
- 6Hospitals and clinics1 hospitals, 5 clinics
Nearest schools and colleges
- Cohesion Montessori · 0.21 km
- Deeksha · 0.54 km
- Chethana Public School · 0.96 km
Nearest hospitals and clinics
- Shishu Care Clinic · 0.23 km
- Apollo Clinic · 0.61 km
- Dixit Skin & Ortho Care · 0.61 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Thalaghattapura (ತಲಘಟ್ಟಪುರ)Open now — nearest operating metro station1.08 km
- Jnanabharati (ಜ್ಞಾನಭಾರತಿ)Nearest railway station8.75 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Jogi Kere, 308 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Jogi Kere on OpenStreetMap (opens in a new tab) (ಜೋಗಿ ಕೆರೆ)308 m
- Baiyannakunte Lake on OpenStreetMap (opens in a new tab) 674 m
- Thalaghattapura Lake on OpenStreetMap (opens in a new tab) (ತಲಘಟ್ಟಪುರ ಕೆರೆ)1,032 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Provident Park Square 5 home types and carpet areas
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 1 BHK | 344 – 463 sq ft | 119 |
| 2 BHK | 591 – 616 sq ft | 22 |
| 3 BHK | 780 – 903 sq ft | 44 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Provident Park Square 5 possession date and construction status
Promoter’s quarterly update to RERA for Q3 2025-26, submitted 2026-03-30.
By tower (Q3 2025-26)
Units sold and unsold, from RERA (Q3 2025-26)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 1 BHK | 119 | 118 | 1 |
| 2 BHK | 230 | 225 | 5 |
| 3 BHK | 252 | 251 | 1 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 17 Jan 2020Project start date given to RERA
- 26 Feb 2020Registered with Karnataka RERA
- 31 Dec 2024Completion date given at registration
- 30 Jun 2026Section 6 Extension: completion date moved to this date
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Aug 2026 — about 1 month after the completion date on RERA (30 Jun 2026).
- Filed on RERA
- Average pace since start
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q3 2025-26to 31 Dec 2025 | 30 Mar 2026 | 91% | 594 of 601 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 91% ÷ 71.5 months (17 Jan 2020 to 31 Dec 2025) = 1.3% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 31 Dec 2025 + 9 ÷ 1.3 = 7.1 months → Aug 2026. This is an estimate, not a date from the builder or RERA.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q3 2025-26, submitted 2026-03-30.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | BDA - Bangalore Development Authority | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Commencement certificate · Permission to start buildingNot on RERA yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBNot on RERA yet
- Electricity · BESCOMNot on RERA yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 13 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Provident Park Square 5 RERA complaints and orders
2 complaints as on Source (rera.karnataka.gov.in) (opens in a new tab)
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| CMP/220826/0009943 | 26 Aug 2022 | Approved documents not given by the builder for more than 3 years. | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/210408/0007877 | 8 Apr 2021 | Asking the advance payment for the excavation without providing the valid documents like building licence, Building plan for Phase V, allotment letter, Form V architect reports, for Phase 5-2B Tower | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Puravankara Limited
- Promoter type
- Company
- Projects on this site
- 25
- RERA complaints against promoter
- 111
- Company number (CIN)
- L45200KA1986PLC051571
From Karnataka RERA, as collected so far (13 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Puravankara Limited’s RERA recordPuravankara Limited delivery record
- 25Projects in Bengaluru on RERA36 approved registrations under Puravankara Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 14,135Homes and plots registeredAs stated in each registrations.
- 111RERA complaints19 open, 92 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 7.9Complaints per 1,000 homes and plots111 complaints ÷ 14,135 homes and plots in its 36 registrations on Karnataka RERA in Bengaluru.
- 1Completion filed on RERARegistrations where the promoter applied to RERA for completion; 0 with an occupancy certificate on RERA.
- 0 of 1Filed by the date given at registrationMedian gap 7.4 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
What the complaints are about
111 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| Sound of Water Phase 1 by Puravankara | 31 Dec 2019 | 11 Aug 2020 | 7 months after |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Jan 2020
- 30 Jun 2026Completion date extended to 30 Jun 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 Mar 2026Quarterly update filed for Q3 2025-26: 91% built, 594 of 601 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 26 Aug 2022Complaint CMP/220826/0009943 filed with RERA: “Approved documents not given by the builder for more than 3 years.” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 8 Apr 2021Complaint CMP/210408/0007877 filed with RERA: “Asking the advance payment for the excavation without providing the valid documents like building licence, Building plan for Phase V, allotment letter, Form V architect reports, for Phase 5-2B Tower” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 26 Feb 2020Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/200226/003305); completion date 31 Dec 2024 Source (rera.karnataka.gov.in) (opens in a new tab)
- 17 Jan 2020Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Provident Park Square 5 FAQs
What is the completion date for Provident Park Square 5?
The current completion date on RERA is 30 June 2026. The project was originally scheduled for 31 December 2024 but has been extended twice: once for Covid Extension and once under Section 6 Extension.
How many homes are in Provident Park Square 5?
The project has 185 homes across 6 towers, with a maximum of 14 floors.
What home types are available in Provident Park Square 5?
The project offers 3 BHK (44 homes, 780–903 sq ft carpet area), 2 BHK (22 homes, 591–616 sq ft carpet area), and 1 BHK (119 homes, 344–463 sq ft carpet area).
What is the RERA registration number for Provident Park Square 5?
The RERA registration number is PRM/KA/RERA/1251/310/PR/200226/003305, registered on 26 February 2020.
Where is Provident Park Square 5 located?
The project is located in Mallasandra, Bengaluru South taluk, Bengaluru Urban district, PIN 560042.
What is the construction progress of Provident Park Square 5?
As of Q3 2025-26 (quarter ended 31 December 2025), the project is 91% complete.
How many homes have been booked in Provident Park Square 5?
As of Q3 2025-26, 594 homes have been booked, with 601 homes in the booking table.
Are there RERA complaints against Provident Park Square 5?
There are 2 RERA complaints on this project registration.
Who is the builder of Provident Park Square 5?
The builder is Puravankara Limited, a company. The builder has 111 complaints across all projects in RERA records and 23 other projects in the Bengaluru RERA records.
Which bank holds the escrow for Provident Park Square 5?
State Bank of India is the escrow bank for this project.
Written by AI from the RERA record above on 13 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Provident Park Square 5
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Puravankara Limited? Review the builder.
Reviews of Puravankara Limited by verified buyers
No verified reviews of Puravankara Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Salarpuria Sattva Misty CharmSattva Resi Private Limited | 0.4 km | 1,339 | Oct 2024extended | — | 1 | Not collected |
| TG HeritageT G Developers | 0.5 km | 84 | Dec 2027 | 100% | 0 | Not collected |
| Zest at Godrej EternityGodrej Home Constructions Private Limited | 0.5 km | 180 | Jul 2024extended | — | 4 | Not collected |
| Casagrand CasablancaCasa Grande Garden City Builders Pvt Ltd | 0.8 km | 805 | May 2029 | 40% | 4 | from ₹1.44 Cr |
| Purva Park HillPuravankara Limited | 0.9 km | 492 | Dec 2027 | — | 20 | from ₹2.02 Crabout ₹18,200/sq ft carpet |
| Aparna WonderwoodsAparna Constructions And Estates Private Limited | 1.1 km | 1,261 | Feb 2031 | 2% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 13 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/310/PR/200226/003305.
- RERA record last checked: 13 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 30 Mar 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Kanakapura Road
Guntas Mallasandra, Kanakapura RoadUnder constructionRERA registeredBuyers’ group openSalarpuria Sattva Misty Charm
by Sattva Resi
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 3 BHK
- 374 – 1,031 sq ft
- Oct 2024 (extended)
RERA not updated since promised Oct 2024 · 1,339 homes · 1 RERA complaint
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Salarpuria Sattva Misty Charm
Mallasandra, Kanakapura RoadUnder constructionRERA registeredBuyers’ group openTG Heritage
by T G Developers
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 3 BHK
- 489 – 971 sq ft
- Dec 2027
84 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for TG Heritage
Mallasandra, Kanakapura RoadReady to moveRERA registeredBuyers’ group openZest at Godrej Eternity
by Godrej Home Constructions
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 3 BHK
- 483 – 1,187 sq ft
- Jul 2024 (extended)
180 homes · 4 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Zest at Godrej Eternity