Purva Park Hill
2 & 3 BHK apartments by Puravankara Limited · Mallasandra, Kanakapura Road, Bengaluru
Mallasandra, Kanakapura Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
Purva Park Hill project banner with pricing Artist’s impression · © Puravankara Limited · Source ↗ (opens in a new tab)
Purva Park Hill at a glance
- Price from₹2.02 Cr · 3 BHKBuilder’s website · as on 8 Oct 2026
- All-in from₹2.27 Cr · 3 BHKBuilder price + GST, stamp duty, registration · 8 Oct 2026
- Possession (RERA)Dec 2027Karnataka RERA
- Construction85% built · on pace for Dec 2026RERA filing to 31 Dec 2025 (Wing A); estimate from average pace
- RERA complaints (project)20 complaintsKarnataka RERA · as on 12 Oct 2026
- Approvals filed1 of 9 on RERAKarnataka RERA uploads · 12 Oct 2026
- Nearest metroSilk Institute · 1.61 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 171 min at peak42.31 km straight line · estimate
- Nearest lakeJogi Kere · 1,008 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Purva Park Hill is a residential project by Puravankara Limited in Mallasandra, Bengaluru with 492 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2027. It is registered in 4 phases.
Facts collected on 12 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Purva Park Hill buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Puravankara Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Purva Park Hill buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK
- Carpet area
- 807 – 1,184 sq ft
- Towers
- 3
- Floors
- 20
- Total homes
- 492
- Land
- 1.79 acres
- Possession (RERA)
- Dec 2027
- Built (RERA update)
- Not found in public records yet: construction progress
Purva Park Hill RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/310/PR/220601/004946
- Registered on
- 1 Jun 2022
- Promised completion
- 31 Dec 2027
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- Not found in public records yet: homes booked
- Price
- ₹2.02 Cr as on
- Project type
- Residential
4 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.
From the builder’s own website; see the price list below for size basis.
Phases and RERA numbers
| Phase | RERA number | Promised completion | Homes | Status | Source |
|---|---|---|---|---|---|
| Wing A | PRM/KA/RERA/1251/310/PR/220601/004946 | 31 Dec 2027 | 123 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Wing B | PRM/KA/RERA/1251/310/PR/220601/004947 | 31 Dec 2027 | 123 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Wing C | PRM/KA/RERA/1251/310/PR/220601/004948 | 31 Dec 2027 | 123 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Wing D | PRM/KA/RERA/1251/310/PR/220601/004949 | 31 Dec 2027 | 123 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
Towers and blocks (RERA filing)
| Tower | Phase | Floors | Basements | Homes |
|---|---|---|---|---|
| Wing B | Wing B | 20 | 2 | 123 |
| Wing C | Wing C | 20 | 2 | 123 |
| Wing D | Wing D | 20 | 2 | 123 |
A dash (—) means the filing did not state that value.
Purva Park Hill price list
| Home type | Size | Price | ₹ per sq ft | Source |
|---|---|---|---|---|
| 3 BHK | —unknown | From ₹2.02 Cronwards | — | Source (puravankara.com) (opens in a new tab) |
As published by the builder on the date shown — not an offer, and not checked with the builder. Check whether the size is carpet or super built-up area before comparing.
Price per sq ft vs projects within 5 km
The builder’s published prices work out to about ₹17,100 – ₹19,200 per sq ft of carpet area.
| Home type | Builder price | Carpet area (RERA) | ₹ per sq ft carpet |
|---|---|---|---|
| 3 BHK | from ₹2.02 Crseen 8 Oct 2026 | 1,050 – 1,184 sq ft | ₹17,100 – ₹19,200 |
Worked out as the builder’s “from” price ÷ the largest and smallest carpet area RERA lists for that home type — we don’t know which unit the starting price is for. Builders usually say taxes and other charges are extra. Builder price list (puravankara.com) (opens in a new tab) RERA carpet areas (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (puravankara.com) (opens in a new tab)Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Price history
One snapshot so far: the builder’s “onwards” prices seen on 8 Oct 2026. Each new check of the builder’s website adds a dated point here, so rises and offers show up with their dates.
| Seen on | Where | Prices |
|---|---|---|
| 8 Oct 2026 | Builder’s website Source (puravankara.com) (opens in a new tab) | 3 BHK from ₹2.02 Cr |
Summary in plain English
Purva Park Hill is a residential project by Puravankara Limited in Mallasandra, Bengaluru South, with 492 homes across 4 wings. The project is registered with the Karnataka RERA with a completion date of 31 December 2027.
Written by AI from the RERA record above on 12 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Not found in public records yet: water and power
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA) · Wing A
- Standard Chartered Bank, M G Road
- Escrow bank (RERA) · Wing B
- Standard Chartered Bank, Koramangala Branch
- Escrow bank (RERA) · Wing C
- HDFC, Richmond Road
- Escrow bank (RERA) · Wing D
- Standard Chartered Bank, Koramangala
Amenities
Purva Park Hill location and address
- Address
- Survey No. 19 Mallasandra Village Uttarahalli Hobli, Off Kankanpura Road
- Village (RERA)
- Mallasandra
- Locality
- Kanakapura RoadAlso known as Kanakapura Main Road
- PIN code
- 560027
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.85441, 77.54273
Distances to landmarks
Not found in public records yet: landmarksAbout Kanakapura Road
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 13.26 km | approx. 54 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 14.07 km | approx. 57 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 16.87 km | approx. 68 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 23.11 km | approx. 94 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 25.81 km | approx. 105 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 42.31 km | approx. 171 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 9Schools and colleges9 schools, 0 colleges, 0 kindergartens
- 4Hospitals and clinics0 hospitals, 4 clinics
Nearest schools and colleges
- Cohesion Montessori · 0.7 km
- Sri Kumaran Children's Home CBSE · 0.73 km
- Sri Kumaran Children's Home ICSE · 1.04 km
Nearest hospitals and clinics
- Apollo Clinic · 0.29 km
- Shishu Care Clinic · 0.66 km
- Dixit Skin & Ortho Care · 1.35 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Silk Institute (ರೇಷ್ಮೆ ಸಂಸ್ಥೆ)Open now — nearest operating metro station1.61 km
- Kengeri (ಕೆಂಗೇರಿ)Nearest railway station9.5 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Jogi Kere, 1,008 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Jogi Kere on OpenStreetMap (opens in a new tab) (ಜೋಗಿ ಕೆರೆ)1,008 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,185 m
- Chudahalli Lake on OpenStreetMap (opens in a new tab) (ಚೂಡಹಳ್ಳಿ ಕೆರೆ)1,431 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Purva Park Hill home types and carpet areas
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved layout plan

Wing C: Demarcation Plan (PPH Wing C)Filed 9 Dec 2021 · Full PDF on RERA
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 807 – 818 sq ft | 81 |
| 3 BHK | 1,050 – 1,184 sq ft | 411 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Purva Park Hill possession date and construction status
Timeline
- 1 Oct 2020Wing A: Project start date given to RERA
- 1 Oct 2020Wing B: Project start date given to RERA
- 1 Oct 2020Wing C: Project start date given to RERA
- 1 Oct 2020Wing D: Project start date given to RERA
- 1 Jun 2022Wing A: Registered with Karnataka RERA
- 1 Jun 2022Wing B: Registered with Karnataka RERA
- 1 Jun 2022Wing C: Registered with Karnataka RERA
- 1 Jun 2022Wing D: Registered with Karnataka RERA
- 31 Dec 2027Wing A: Completion date given at registration
- 31 Dec 2027Wing B: Completion date given at registration
- 31 Dec 2027Wing C: Completion date given at registration
- 31 Dec 2027Wing D: Completion date given at registration
Construction pace from RERA quarterly filings (Wing A)
At the average pace so far, construction would reach 100% around Dec 2026 — about 13 months before the completion date on RERA (31 Dec 2027).
This project has 4 RERA registrations; the chart uses Wing A, the one with the most quarterly filings.
- Filed on RERA
- Average pace since start
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q3 2025-26to 31 Dec 2025 | 30 Mar 2026 | 85% | 118 of 123 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 85% ÷ 63 months (1 Oct 2020 to 31 Dec 2025) = 1.3% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 31 Dec 2025 + 15 ÷ 1.3 = 11.1 months → Dec 2026. This is an estimate, not a date from the builder or RERA.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan (Wing A) | Local Planing Authority | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Building plan (Wing B) | Local Planing Authority | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Building plan (Wing C) | Local Planing Authority | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Building plan (Wing D) | Local Planing Authority | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA (Wing A)
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Commencement certificate · Permission to start buildingNot on RERA yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBNot on RERA yet
- Electricity · BESCOMNot on RERA yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 12 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.
Purva Park Hill RERA complaints and orders
20 complaints as on Source (rera.karnataka.gov.in) (opens in a new tab)
20 rows: rera complaints. Scroll inside the table to see them all.
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| 01025/2026 | 19 Aug 2026 | Delayed Possession of flat | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00968/2026 | 6 Aug 2026 | Delayed possession of flat | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00620/2026 | 29 May 2026 | Delay Compensation | Disposed ao | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00619/2026 | 29 May 2026 | Delay Period Interest | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00621/2026 | 29 May 2026 | Delay Period intrest | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00605/2026 | 27 May 2026 | Immediate possession of flat Purva Park Hill D 604 and compensation for the delayed possession | Disposed ao | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00580/2026 | 25 May 2026 | Ongoing Delay in possession since grace period got over on 1stSep2025 causing immense financial hardship and agony | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00510/2026 | 11 May 2026 | Immediate possession of flat Purva Park Hill D 604 and compensation for the delayed possession | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00458/2026 | 4 May 2026 | Non-Compliance of Scheduled Delivery Date | Posted for orders | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00396/2026 | 16 Apr 2026 | Delay in Handover of Apartment, Non-Receipt of Occupation Certificate (OC) and Non-Payment of Delay Compensation | Posted for orders | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00204/2026 | 5 Mar 2026 | delay in delivery of apartment as per agreed date , so need compensation and actual handover date | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00129/2026 | 18 Feb 2026 | Delay in Possession – Claim for Interest – Purva Park Hill | Posted for orders | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00131/2026 | 18 Feb 2026 | Deserve rental amount compensation - Ongoing Delay in possession (grace period till 1stSep2025) causing finance problem because of EMI and monthly rent BOTH | Disposed ao | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00135/2026 | 18 Feb 2026 | Apartment not delivered yet | Disposed ao | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00130/2026 | 18 Feb 2026 | Ongoing Delay in possession since grace period got over on 1stSep2025 causing immense financial hardship and agony | Posted for orders | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00106/2026 | 10 Feb 2026 | Delay In Possession beyound contractual date and non issuance of OC - Claim for interest/compensation. | Posted for orders | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00099/2026 | 10 Feb 2026 | Delivery date was 30thSep 2025 latest, financial compensation (Interest on amount paid to Purvankara till now) needed for delay | Posted for orders | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00098/2026 | 10 Feb 2026 | Delay in Handover - 4 months already over | Posted for orders | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00095/2026 | 7 Feb 2026 | Compensation for delay in hand over/Possession | Posted for orders | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01282/2025 | 15 Oct 2025 | delay in delivery of apartment as per agreed date , so need compensation and actual handover date | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Puravankara Limited
- Promoter type
- Company
- Projects on this site
- 25
- RERA complaints against promoter
- 111
- Company number (CIN)
- L45200KA1986PLC051571
From Karnataka RERA, as collected so far (12 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Puravankara Limited’s RERA recordPuravankara Limited delivery record
- 25Projects in Bengaluru on RERA36 approved registrations under Puravankara Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 14,135Homes and plots registeredAs stated in each registrations.
- 111RERA complaints19 open, 92 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 7.9Complaints per 1,000 homes and plots111 complaints ÷ 14,135 homes and plots in its 36 registrations on Karnataka RERA in Bengaluru.
- 1Completion filed on RERARegistrations where the promoter applied to RERA for completion; 0 with an occupancy certificate on RERA.
- 0 of 1Filed by the date given at registrationMedian gap 7.4 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
What the complaints are about
111 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| Sound of Water Phase 1 by Puravankara | 31 Dec 2019 | 11 Aug 2020 | 7 months after |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Oct 2020
- 8 Oct 2026Builder’s price list seen: 3 BHK from ₹2.02 Cr Source (puravankara.com) (opens in a new tab)
- 19 Aug 2026Complaint 01025/2026 filed with RERA: “Delayed Possession of flat” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 6 Aug 2026Complaint 00968/2026 filed with RERA: “Delayed possession of flat” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 29 May 2026Complaint 00620/2026 filed with RERA: “Delay Compensation” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 29 May 2026Complaint 00619/2026 filed with RERA: “Delay Period Interest” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 29 May 2026Complaint 00621/2026 filed with RERA: “Delay Period intrest” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 27 May 2026Complaint 00605/2026 filed with RERA: “Immediate possession of flat Purva Park Hill D 604 and compensation for the delayed possession” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 25 May 2026Complaint 00580/2026 filed with RERA: “Ongoing Delay in possession since grace period got over on 1stSep2025 causing immense financial hardship and agony” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 May 2026Complaint 00510/2026 filed with RERA: “Immediate possession of flat Purva Park Hill D 604 and compensation for the delayed possession” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 4 May 2026Complaint 00458/2026 filed with RERA: “Non-Compliance of Scheduled Delivery Date” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
- 16 Apr 2026Complaint 00396/2026 filed with RERA: “Delay in Handover of Apartment, Non-Receipt of Occupation Certificate (OC) and Non-Payment of Delay Compensation” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
- 31 Mar 2026Wing B: Quarterly update filed for Q3 2025-26: 80% built, 122 of 123 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 31 Mar 2026Wing C: Quarterly update filed for Q3 2025-26: 96% built, 121 of 123 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 31 Mar 2026Wing D: Quarterly update filed for Q3 2025-26: 96% built, 121 of 123 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 Mar 2026Wing A: Quarterly update filed for Q3 2025-26: 85% built, 118 of 123 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 5 Mar 2026Complaint 00204/2026 filed with RERA: “delay in delivery of apartment as per agreed date , so need compensation and actual handover date” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 18 Feb 2026Complaint 00129/2026 filed with RERA: “Delay in Possession – Claim for Interest – Purva Park Hill” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
- 18 Feb 2026Complaint 00131/2026 filed with RERA: “Deserve rental amount compensation - Ongoing Delay in possession (grace period till 1stSep2025) causing finance problem because of EMI and monthly rent BOTH” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 18 Feb 2026Complaint 00135/2026 filed with RERA: “Apartment not delivered yet” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 18 Feb 2026Complaint 00130/2026 filed with RERA: “Ongoing Delay in possession since grace period got over on 1stSep2025 causing immense financial hardship and agony” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Feb 2026Complaint 00106/2026 filed with RERA: “Delay In Possession beyound contractual date and non issuance of OC - Claim for interest/compensation.” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Feb 2026Complaint 00099/2026 filed with RERA: “Delivery date was 30thSep 2025 latest, financial compensation (Interest on amount paid to Purvankara till now) needed for delay” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Feb 2026Complaint 00098/2026 filed with RERA: “Delay in Handover - 4 months already over” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
- 7 Feb 2026Complaint 00095/2026 filed with RERA: “Compensation for delay in hand over/Possession” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Oct 2025Complaint 01282/2025 filed with RERA: “delay in delivery of apartment as per agreed date , so need compensation and actual handover date” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Jun 2022Wing A: Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/220601/004946); completion date 31 Dec 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Jun 2022Wing B: Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/220601/004947); completion date 31 Dec 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Jun 2022Wing C: Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/220601/004948); completion date 31 Dec 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Jun 2022Wing D: Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/220601/004949); completion date 31 Dec 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Oct 2020Wing A: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. Showing the latest 30 of 33 dated events. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- ₹1,40,240
- Down payment
- ₹40,40,000
- Loan amount
- ₹1,61,60,000
- Total interest
- ₹1,74,97,656
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s published “onwards” price for the home type, where it publishes one (it usually says government charges, other charges and taxes are extra). You can change it.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Sources:Source (puravankara.com) (opens in a new tab)How we calculate this
Purva Park Hill FAQs
What types of homes are available in Purva Park Hill?
The project offers 2 BHK homes with carpet area from 807 to 818 sq ft, and 3 BHK homes with carpet area from 1,050 to 1,184 sq ft.
How many homes are in Purva Park Hill?
The project has 492 homes across 4 wings: Wing A (123 homes), Wing B (123 homes), Wing C (123 homes), and Wing D (123 homes).
When is Purva Park Hill expected to be completed?
The completion date on RERA is 31 December 2027.
What is the construction progress of Purva Park Hill?
As of Q3 2025-26, Wing B is 80% complete, Wing C is 96% complete, and Wing D is 96% complete.
How many homes are booked in Purva Park Hill?
As of Q3 2025-26, Wing B has 122 homes booked out of 123, Wing C has 121 homes booked out of 123, and Wing D has 121 homes booked out of 123.
What are the RERA registration numbers for Purva Park Hill?
Wing A: PRM/KA/RERA/1251/310/PR/220601/004946, Wing B: PRM/KA/RERA/1251/310/PR/220601/004947, Wing C: PRM/KA/RERA/1251/310/PR/220601/004948, Wing D: PRM/KA/RERA/1251/310/PR/220601/004949.
Are there any RERA complaints against Purva Park Hill?
There are 20 RERA complaints on the project: Wing C has 7 complaints and Wing D has 13 complaints.
Where is Purva Park Hill located?
The project is in Mallasandra, Bengaluru South taluk, PIN code 560027.
What is Puravankara Limited's track record?
Puravankara Limited has 110 RERA complaints across all projects and 23 projects registered with the Karnataka RERA records.
Which banks hold escrow for Purva Park Hill?
Standard Chartered Bank holds escrow for Wings A, B, and D, and HDFC holds escrow for Wing C.
Written by AI from the RERA record above on 12 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Purva Park Hill
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Puravankara Limited? Review the builder.
Reviews of Puravankara Limited by verified buyers
No verified reviews of Puravankara Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Casagrand CasablancaCasa Grande Garden City Builders Pvt Ltd | 0.1 km | 805 | May 2029 | 40% | 4 | from ₹1.44 Cr |
| Aparna WonderwoodsAparna Constructions And Estates Private Limited | 0.2 km | 1,261 | Feb 2031 | 2% | 0 | Not collected |
| Zest at Godrej EternityGodrej Home Constructions Private Limited | 0.5 km | 180 | Jul 2024extended | — | 4 | Not collected |
| Provident Park Square 5Puravankara Limited | 0.9 km | 185 | Jun 2026extended | 91% | 2 | Not collected |
| Amberstone ElanzaSrivari Ventures | 1 km | 116 | Dec 2028 | 63% | 0 | Not collected |
| Salarpuria Sattva Misty CharmSattva Resi Private Limited | 1.1 km | 1,339 | Oct 2024extended | — | 1 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 12 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/310/PR/220601/004946, PRM/KA/RERA/1251/310/PR/220601/004947, PRM/KA/RERA/1251/310/PR/220601/004948, PRM/KA/RERA/1251/310/PR/220601/004949.
- RERA record last checked: 12 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 8 Oct 2026
- Builder price list seen: 8 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Kanakapura Road
Mallasandra, Kanakapura RoadArtist’s impressionUnder constructionRERA registeredBuyers’ group openCasagrand Casablanca
by Casa Grande Garden City Builders
Price: Price on requestGet brochure & price →
- Studio, 2 BHK, 3 BHK, 4 BHK, +1 more
- 287 – 2,483 sq ft
- May 2029
805 homes · 4 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Casagrand Casablanca
Mallasandra, Kanakapura RoadUnder constructionRERA registeredBuyers’ group openAparna Wonderwoods
by Aparna Constructions And Estates
Price: Price on requestGet brochure & price →
- Studio, 1 BHK, 1.5 BHK, 2 BHK, +3 more
- 299 – 1,521 sq ft
- Feb 2031
1,261 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Aparna Wonderwoods
Mallasandra, Kanakapura RoadReady to moveRERA registeredBuyers’ group openZest at Godrej Eternity
by Godrej Home Constructions
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 3 BHK
- 483 – 1,187 sq ft
- Jul 2024 (extended)
180 homes · 4 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Zest at Godrej Eternity