Purva Park Hill

2 & 3 BHK apartments by Puravankara Limited · Mallasandra, Kanakapura Road, Bengaluru

Mallasandra, Kanakapura Road, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • residential

by Puravankara Limited

Listed price: ₹2.02 Cr

as on · Source (puravankara.com) (opens in a new tab)

Get today’s price list

Latest price for Purva Park Hill

Builders change prices often and rarely publish them. Tell us how to reach you and we’ll send you the current price list.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

Purva Park Hill is a residential project by Puravankara Limited in Mallasandra, Bengaluru with 492 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2027. It is registered in 4 phases.

Facts collected on 12 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

Purva Park Hill buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks Puravankara Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the Purva Park Hill buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 12 Oct 2026
Home types
2 BHK, 3 BHK
Carpet area
807 – 1,184 sq ft
Towers
3
Floors
20
Total homes
492
Land
1.79 acres
Possession (RERA)
Dec 2027
Built (RERA update)
Not found in public records yet: construction progress

Purva Park Hill RERA number and registration details

RERA number
PRM/KA/RERA/1251/310/PR/220601/004946
Registered on
1 Jun 2022
Promised completion
31 Dec 2027
Extended to
No extension recorded
RERA status
New launch
Homes booked
Not found in public records yet: homes booked
Price
₹2.02 Cr as on
Project type
Residential

4 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.

From the builder’s own website; see the price list below for size basis.

Phases and RERA numbers

PhaseRERA numberPromised completionHomesStatusSource
Wing APRM/KA/RERA/1251/310/PR/220601/00494631 Dec 2027123New launchSource (rera.karnataka.gov.in) (opens in a new tab)
Wing BPRM/KA/RERA/1251/310/PR/220601/00494731 Dec 2027123New launchSource (rera.karnataka.gov.in) (opens in a new tab)
Wing CPRM/KA/RERA/1251/310/PR/220601/00494831 Dec 2027123New launchSource (rera.karnataka.gov.in) (opens in a new tab)
Wing DPRM/KA/RERA/1251/310/PR/220601/00494931 Dec 2027123New launchSource (rera.karnataka.gov.in) (opens in a new tab)

Towers and blocks (RERA filing)

TowerPhaseFloorsBasementsHomes
Wing BWing B202123
Wing CWing C202123
Wing DWing D202123

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Purva Park Hill price list

From the builder’s website, as on 8 Oct 2026
Home typeSizePrice₹ per sq ftSource
3 BHK—unknownFrom ₹2.02 Cronwards—Source (puravankara.com) (opens in a new tab)

As published by the builder on the date shown — not an offer, and not checked with the builder. Check whether the size is carpet or super built-up area before comparing.

Sources:Source (puravankara.com) (opens in a new tab)

Price per sq ft vs projects within 5 km

As on 8 Oct 2026

The builder’s published prices work out to about ₹17,100 – ₹19,200 per sq ft of carpet area.

Home typeBuilder priceCarpet area (RERA)₹ per sq ft carpet
3 BHKfrom ₹2.02 Crseen 8 Oct 20261,050 – 1,184 sq ft₹17,100 – ₹19,200

Worked out as the builder’s “from” price ÷ the largest and smallest carpet area RERA lists for that home type — we don’t know which unit the starting price is for. Builders usually say taxes and other charges are extra. Builder price list (puravankara.com) (opens in a new tab) RERA carpet areas (rera.karnataka.gov.in) (opens in a new tab)

Sources:Source (puravankara.com) (opens in a new tab)Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

Price history

As on 8 Oct 2026

One snapshot so far: the builder’s “onwards” prices seen on 8 Oct 2026. Each new check of the builder’s website adds a dated point here, so rises and offers show up with their dates.

0₹50 L₹1 Cr₹1.5 Cr₹2 Cr₹2.5 CrOct 26NovDecJan 27FebMarAprMayJunJulAugSepLater checks will appear here3 BHK ₹2.02 Cr
Seen onWherePrices
8 Oct 2026Builder’s website Source (puravankara.com) (opens in a new tab)3 BHK from ₹2.02 Cr

Sources:Source (puravankara.com) (opens in a new tab)

Summary in plain English

Purva Park Hill is a residential project by Puravankara Limited in Mallasandra, Bengaluru South, with 492 homes across 4 wings. The project is registered with the Karnataka RERA with a completion date of 31 December 2027.

Written by AI from the RERA record above on 12 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
Not found in public records yet: open space
Water and power
Not found in public records yet: water and power
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA) · Wing A
Standard Chartered Bank, M G Road
Escrow bank (RERA) · Wing B
Standard Chartered Bank, Koramangala Branch
Escrow bank (RERA) · Wing C
HDFC, Richmond Road
Escrow bank (RERA) · Wing D
Standard Chartered Bank, Koramangala

Amenities

Not found in public records yet: amenities

Purva Park Hill location and address

Address
Survey No. 19 Mallasandra Village Uttarahalli Hobli, Off Kankanpura Road
Village (RERA)
Mallasandra
Locality
Kanakapura RoadAlso known as Kanakapura Main Road
PIN code
560027
City
Bengaluru
State
Karnataka
Coordinates
12.85441, 77.54273

Distances to landmarks

Not found in public records yet: landmarks

About Kanakapura Road

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)13.26 kmapprox. 54 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)14.07 kmapprox. 57 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)16.87 kmapprox. 68 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)23.11 kmapprox. 94 min
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)25.81 kmapprox. 105 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)42.31 kmapprox. 171 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 9Schools and colleges9 schools, 0 colleges, 0 kindergartens
  • 4Hospitals and clinics0 hospitals, 4 clinics

Nearest schools and colleges

  • Cohesion Montessori · 0.7 km
  • Sri Kumaran Children's Home CBSE · 0.73 km
  • Sri Kumaran Children's Home ICSE · 1.04 km

Nearest hospitals and clinics

  • Apollo Clinic · 0.29 km
  • Shishu Care Clinic · 0.66 km
  • Dixit Skin & Ortho Care · 1.35 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Silk Institute (ರೇಷ್ಮೆ ಸಂಸ್ಥೆ)Open now — nearest operating metro station1.61 km
  • Kengeri (ಕೆಂಗೇರಿ)Nearest railway station9.5 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Jogi Kere, 1,008 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Purva Park Hill home types and carpet areas

Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.

Approved layout plan

Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.

Get brochure, floor plans & price

Brochure, floor plans and price list for Purva Park Hill

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Home typeCarpet areaHomes
2 BHK807 – 818 sq ft81
3 BHK1,050 – 1,184 sq ft411

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Purva Park Hill possession date and construction status

  • Wing A85%

    as on · 118 of 123 homes booked

  • Wing B80%

    as on · 122 of 123 homes booked

  • Wing C96%

    as on · 121 of 123 homes booked

  • Wing D96%

    as on · 121 of 123 homes booked

Timeline

  1. 1 Oct 2020Wing A: Project start date given to RERA
  2. 1 Oct 2020Wing B: Project start date given to RERA
  3. 1 Oct 2020Wing C: Project start date given to RERA
  4. 1 Oct 2020Wing D: Project start date given to RERA
  5. 1 Jun 2022Wing A: Registered with Karnataka RERA
  6. 1 Jun 2022Wing B: Registered with Karnataka RERA
  7. 1 Jun 2022Wing C: Registered with Karnataka RERA
  8. 1 Jun 2022Wing D: Registered with Karnataka RERA
  9. 31 Dec 2027Wing A: Completion date given at registration
  10. 31 Dec 2027Wing B: Completion date given at registration
  11. 31 Dec 2027Wing C: Completion date given at registration
  12. 31 Dec 2027Wing D: Completion date given at registration

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Construction pace from RERA quarterly filings (Wing A)

As on 30 Mar 2026

At the average pace so far, construction would reach 100% around Dec 2026 — about 13 months before the completion date on RERA (31 Dec 2027).

This project has 4 RERA registrations; the chart uses Wing A, the one with the most quarterly filings.

0%25%50%75%100%20212022202320242025202620272028RERA date85%
  • Filed on RERA
  • Average pace since start
  • RERA completion date

Quarterly filings

QuarterFiled onBuiltHomes booked
Q3 2025-26to 31 Dec 202530 Mar 202685%118 of 123
How we calculate

Average pace = % built ÷ months since the start date in the RERA record. Here: 85% ÷ 63 months (1 Oct 2020 to 31 Dec 2025) = 1.3% a month.

Estimated finish = latest filing date + (100 − % built) ÷ pace = 31 Dec 2025 + 15 ÷ 1.3 = 11.1 months → Dec 2026. This is an estimate, not a date from the builder or RERA.

A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

Approvals and documents checklist

ApprovalAuthoritySource
Building plan (Wing A)Local Planing AuthoritySource (rera.karnataka.gov.in) (opens in a new tab)
Building plan (Wing B)Local Planing AuthoritySource (rera.karnataka.gov.in) (opens in a new tab)
Building plan (Wing C)Local Planing AuthoritySource (rera.karnataka.gov.in) (opens in a new tab)
Building plan (Wing D)Local Planing AuthoritySource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA (Wing A)

As on 12 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Commencement certificate · Permission to start buildingNot on RERA yet
  • Environment clearance · SEIAA KarnatakaNot on RERA yet
  • Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
  • Pollution board consent · KSPCBNot on RERA yet
  • Water and sewerage · BWSSBNot on RERA yet
  • Electricity · BESCOMNot on RERA yet
  • Height clearance · Airports Authority of IndiaNot on RERA yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 12 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Purva Park Hill RERA complaints and orders

20 complaints as on Source (rera.karnataka.gov.in) (opens in a new tab)

20 rows: rera complaints. Scroll inside the table to see them all.

Complaint refFiledSubjectStatusSource
01025/202619 Aug 2026Delayed Possession of flatUnder enquirySource (rera.karnataka.gov.in) (opens in a new tab)
00968/20266 Aug 2026Delayed possession of flatUnder enquirySource (rera.karnataka.gov.in) (opens in a new tab)
00620/202629 May 2026Delay CompensationDisposed aoSource (rera.karnataka.gov.in) (opens in a new tab)
00619/202629 May 2026Delay Period InterestUnder enquirySource (rera.karnataka.gov.in) (opens in a new tab)
00621/202629 May 2026Delay Period intrestUnder enquirySource (rera.karnataka.gov.in) (opens in a new tab)
00605/202627 May 2026Immediate possession of flat Purva Park Hill D 604 and compensation for the delayed possessionDisposed aoSource (rera.karnataka.gov.in) (opens in a new tab)
00580/202625 May 2026Ongoing Delay in possession since grace period got over on 1stSep2025 causing immense financial hardship and agonyUnder enquirySource (rera.karnataka.gov.in) (opens in a new tab)
00510/202611 May 2026Immediate possession of flat Purva Park Hill D 604 and compensation for the delayed possessionUnder enquirySource (rera.karnataka.gov.in) (opens in a new tab)
00458/20264 May 2026Non-Compliance of Scheduled Delivery DatePosted for ordersSource (rera.karnataka.gov.in) (opens in a new tab)
00396/202616 Apr 2026Delay in Handover of Apartment, Non-Receipt of Occupation Certificate (OC) and Non-Payment of Delay CompensationPosted for ordersSource (rera.karnataka.gov.in) (opens in a new tab)
00204/20265 Mar 2026delay in delivery of apartment as per agreed date , so need compensation and actual handover dateDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00129/202618 Feb 2026Delay in Possession – Claim for Interest – Purva Park HillPosted for ordersSource (rera.karnataka.gov.in) (opens in a new tab)
00131/202618 Feb 2026Deserve rental amount compensation - Ongoing Delay in possession (grace period till 1stSep2025) causing finance problem because of EMI and monthly rent BOTHDisposed aoSource (rera.karnataka.gov.in) (opens in a new tab)
00135/202618 Feb 2026Apartment not delivered yetDisposed aoSource (rera.karnataka.gov.in) (opens in a new tab)
00130/202618 Feb 2026Ongoing Delay in possession since grace period got over on 1stSep2025 causing immense financial hardship and agonyPosted for ordersSource (rera.karnataka.gov.in) (opens in a new tab)
00106/202610 Feb 2026Delay In Possession beyound contractual date and non issuance of OC - Claim for interest/compensation.Posted for ordersSource (rera.karnataka.gov.in) (opens in a new tab)
00099/202610 Feb 2026Delivery date was 30thSep 2025 latest, financial compensation (Interest on amount paid to Purvankara till now) needed for delayPosted for ordersSource (rera.karnataka.gov.in) (opens in a new tab)
00098/202610 Feb 2026Delay in Handover - 4 months already overPosted for ordersSource (rera.karnataka.gov.in) (opens in a new tab)
00095/20267 Feb 2026Compensation for delay in hand over/PossessionPosted for ordersSource (rera.karnataka.gov.in) (opens in a new tab)
01282/202515 Oct 2025delay in delivery of apartment as per agreed date , so need compensation and actual handover dateDisposedSource (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About Puravankara Limited

Promoter type
Company
Projects on this site
25
RERA complaints against promoter
111
Company number (CIN)
L45200KA1986PLC051571

From Karnataka RERA, as collected so far (12 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

Puravankara Limited’s RERA record

Puravankara Limited delivery record

As on 22 Oct 2026
  • 25Projects in Bengaluru on RERA36 approved registrations under Puravankara Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
  • 14,135Homes and plots registeredAs stated in each registrations.
  • 111RERA complaints19 open, 92 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
  • 7.9Complaints per 1,000 homes and plots111 complaints ÷ 14,135 homes and plots in its 36 registrations on Karnataka RERA in Bengaluru.
  • 1Completion filed on RERARegistrations where the promoter applied to RERA for completion; 0 with an occupancy certificate on RERA.
  • 0 of 1Filed by the date given at registrationMedian gap 7.4 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.

What the complaints are about

  • Delay in possession or delay interest55
  • Refund of booking or other money29
  • Registration, sale deed or agreement6
  • Owners' association, amenities or documents3
  • Construction quality, size or inspection1
  • Other17

111 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)

Completion filed on RERA

ProjectDate at registrationCompletion filedGap
Sound of Water Phase 1 by Puravankara31 Dec 201911 Aug 20207 months after

Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Oct 2020

As on 12 Oct 2026
  1. 8 Oct 2026Builder’s price list seen: 3 BHK from ₹2.02 Cr Source (puravankara.com) (opens in a new tab)
  2. 19 Aug 2026Complaint 01025/2026 filed with RERA: “Delayed Possession of flat” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 6 Aug 2026Complaint 00968/2026 filed with RERA: “Delayed possession of flat” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 29 May 2026Complaint 00620/2026 filed with RERA: “Delay Compensation” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 29 May 2026Complaint 00619/2026 filed with RERA: “Delay Period Interest” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
  6. 29 May 2026Complaint 00621/2026 filed with RERA: “Delay Period intrest” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
  7. 27 May 2026Complaint 00605/2026 filed with RERA: “Immediate possession of flat Purva Park Hill D 604 and compensation for the delayed possession” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  8. 25 May 2026Complaint 00580/2026 filed with RERA: “Ongoing Delay in possession since grace period got over on 1stSep2025 causing immense financial hardship and agony” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
  9. 11 May 2026Complaint 00510/2026 filed with RERA: “Immediate possession of flat Purva Park Hill D 604 and compensation for the delayed possession” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
  10. 4 May 2026Complaint 00458/2026 filed with RERA: “Non-Compliance of Scheduled Delivery Date” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
  11. 16 Apr 2026Complaint 00396/2026 filed with RERA: “Delay in Handover of Apartment, Non-Receipt of Occupation Certificate (OC) and Non-Payment of Delay Compensation” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
  12. 31 Mar 2026Wing B: Quarterly update filed for Q3 2025-26: 80% built, 122 of 123 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  13. 31 Mar 2026Wing C: Quarterly update filed for Q3 2025-26: 96% built, 121 of 123 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  14. 31 Mar 2026Wing D: Quarterly update filed for Q3 2025-26: 96% built, 121 of 123 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  15. 30 Mar 2026Wing A: Quarterly update filed for Q3 2025-26: 85% built, 118 of 123 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  16. 5 Mar 2026Complaint 00204/2026 filed with RERA: “delay in delivery of apartment as per agreed date , so need compensation and actual handover date” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  17. 18 Feb 2026Complaint 00129/2026 filed with RERA: “Delay in Possession – Claim for Interest – Purva Park Hill” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
  18. 18 Feb 2026Complaint 00131/2026 filed with RERA: “Deserve rental amount compensation - Ongoing Delay in possession (grace period till 1stSep2025) causing finance problem because of EMI and monthly rent BOTH” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  19. 18 Feb 2026Complaint 00135/2026 filed with RERA: “Apartment not delivered yet” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  20. 18 Feb 2026Complaint 00130/2026 filed with RERA: “Ongoing Delay in possession since grace period got over on 1stSep2025 causing immense financial hardship and agony” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
  21. 10 Feb 2026Complaint 00106/2026 filed with RERA: “Delay In Possession beyound contractual date and non issuance of OC - Claim for interest/compensation.” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
  22. 10 Feb 2026Complaint 00099/2026 filed with RERA: “Delivery date was 30thSep 2025 latest, financial compensation (Interest on amount paid to Purvankara till now) needed for delay” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
  23. 10 Feb 2026Complaint 00098/2026 filed with RERA: “Delay in Handover - 4 months already over” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
  24. 7 Feb 2026Complaint 00095/2026 filed with RERA: “Compensation for delay in hand over/Possession” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
  25. 15 Oct 2025Complaint 01282/2025 filed with RERA: “delay in delivery of apartment as per agreed date , so need compensation and actual handover date” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  26. 1 Jun 2022Wing A: Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/220601/004946); completion date 31 Dec 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
  27. 1 Jun 2022Wing B: Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/220601/004947); completion date 31 Dec 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
  28. 1 Jun 2022Wing C: Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/220601/004948); completion date 31 Dec 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
  29. 1 Jun 2022Wing D: Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/220601/004949); completion date 31 Dec 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
  30. 1 Oct 2020Wing A: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. Showing the latest 30 of 33 dated events. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

Starts at the lowest listed price; change it to the home you want.

Example only — use your bank’s quote.

Monthly EMI
₹1,40,240
Down payment
₹40,40,000
Loan amount
₹1,61,60,000
Total interest
₹1,74,97,656

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

As on 8 Oct 2026

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s published “onwards” price for the home type, where it publishes one (it usually says government charges, other charges and taxes are extra). You can change it.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

Sources:Source (puravankara.com) (opens in a new tab)How we calculate this

Purva Park Hill FAQs

What types of homes are available in Purva Park Hill?

The project offers 2 BHK homes with carpet area from 807 to 818 sq ft, and 3 BHK homes with carpet area from 1,050 to 1,184 sq ft.

How many homes are in Purva Park Hill?

The project has 492 homes across 4 wings: Wing A (123 homes), Wing B (123 homes), Wing C (123 homes), and Wing D (123 homes).

When is Purva Park Hill expected to be completed?

The completion date on RERA is 31 December 2027.

What is the construction progress of Purva Park Hill?

As of Q3 2025-26, Wing B is 80% complete, Wing C is 96% complete, and Wing D is 96% complete.

How many homes are booked in Purva Park Hill?

As of Q3 2025-26, Wing B has 122 homes booked out of 123, Wing C has 121 homes booked out of 123, and Wing D has 121 homes booked out of 123.

What are the RERA registration numbers for Purva Park Hill?

Wing A: PRM/KA/RERA/1251/310/PR/220601/004946, Wing B: PRM/KA/RERA/1251/310/PR/220601/004947, Wing C: PRM/KA/RERA/1251/310/PR/220601/004948, Wing D: PRM/KA/RERA/1251/310/PR/220601/004949.

Are there any RERA complaints against Purva Park Hill?

There are 20 RERA complaints on the project: Wing C has 7 complaints and Wing D has 13 complaints.

Where is Purva Park Hill located?

The project is in Mallasandra, Bengaluru South taluk, PIN code 560027.

What is Puravankara Limited's track record?

Puravankara Limited has 110 RERA complaints across all projects and 23 projects registered with the Karnataka RERA records.

Which banks hold escrow for Purva Park Hill?

Standard Chartered Bank holds escrow for Wings A, B, and D, and HDFC holds escrow for Wing C.

Written by AI from the RERA record above on 12 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Purva Park Hill

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from Puravankara Limited? Review the builder.

Reviews of Puravankara Limited by verified buyers

No verified reviews of Puravankara Limited yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
Casagrand CasablancaCasa Grande Garden City Builders Pvt Ltd0.1 km805May 202940%4from ₹1.44 Cr
Aparna WonderwoodsAparna Constructions And Estates Private Limited0.2 km1,261Feb 20312%0Not collected
Zest at Godrej EternityGodrej Home Constructions Private Limited0.5 km180Jul 2024extended—4Not collected
Provident Park Square 5Puravankara Limited0.9 km185Jun 2026extended91%2Not collected
Amberstone ElanzaSrivari Ventures1 km116Dec 202863%0Not collected
Salarpuria Sattva Misty CharmSattva Resi Private Limited1.1 km1,339Oct 2024extended—1Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 12 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/310/PR/220601/004946, PRM/KA/RERA/1251/310/PR/220601/004947, PRM/KA/RERA/1251/310/PR/220601/004948, PRM/KA/RERA/1251/310/PR/220601/004949.

  • RERA record last checked: 12 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 8 Oct 2026
  • Builder price list seen: 8 Oct 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error