Isha Hilife
1, 2 & 3 BHK apartments by Isha Corp · Thirumalashettihalli, near Kadugodi–Hope Farm, Bengaluru
Thirumalashettihalli, near Kadugodi–Hope Farm, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
by Isha Corp
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Isha Hilife at a glance
- Possession (RERA)Dec 2026Karnataka RERA
- Construction95% built · on pace for Nov 2026RERA filing to 30 Sep 2026; estimate from average pace
- Homes booked195 of 195 (100%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 21 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 21 Oct 2026
- Nearest metroWhitefield (Kadugodi) · 3.15 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 104 min at peak25.77 km straight line · estimate
- Nearest lakeUnnamed lake · 1,642 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Isha Hilife is a residential project by Isha Corp in Thirumalashettihalli, Bengaluru with 195 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2026.
Facts collected on 21 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Isha Hilife buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Isha Corp for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Isha Hilife buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- Studio, 1 BHK, 2 BHK, 3 BHK
- Carpet area
- 528 – 3,459 sq ft
- Towers
- 2
- Floors
- 13
- Total homes
- 195
- Land
- 2.4 acres
- Possession (RERA)
- Dec 2026
- Built (RERA update)
- 95%
Isha Hilife RERA number and registration details
- RERA number
- PRM/KA/RERA/1250/304/PR/030524/006836
- Registered on
- 3 May 2024
- Promised completion
- 31 Dec 2026
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 195 of 195 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| Residential Apartment Building | 13 | 1 | 195 |
| Recreational Club Building | 4 | 0 | 4 |
A dash (—) means the filing did not state that value.
Summary in plain English
Isha Hilife is a residential project by Isha Corp in Thirumalashettihalli, Hosakote, with 195 homes across 2 towers of up to 13 floors. The project includes 2 BHK, 2 BHK + STUDIO, 1 BHK + STUDIO and 3 BHK homes, with completion scheduled for 31 December 2026.
Written by AI from the RERA record above on 21 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 75.5% of land
- Water and power
- Water source filed with RERA: Local Authority
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- Axis Bank, Channasandra Main Road
- Building plan (RERA)
- BMRDA - Bangalore Metropolitan Region Development Authority · No. STRRPA/TP/CC/383/2022-23 · dated 18 Dec 2023
- Project cost declared to RERA
- ₹42.31 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Isha Hilife location and address
- Address
- ISHA CORP, No. 21 Thirumalashettihalli Village, , Anugondanahalli Hobli, Hoskote Taluk, , Hosakote , Bengaluru Rural, Karnataka - 560067
- Village (RERA)
- Thirumalashettihalli
- Locality
- Near Kadugodi–Hope FarmAlso known as Kadugodi, Hope Farm
- PIN code
- 560067
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.98211, 77.78347
Distances to landmarks
Not found in public records yet: landmarksAbout Thirumalashettihalli
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 4.99 km | approx. 20 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 12.84 km | approx. 52 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 19.18 km | approx. 78 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 19.54 km | approx. 79 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 23.18 km | approx. 94 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 25.77 km | approx. 104 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 3Schools and colleges3 schools, 0 colleges, 0 kindergartens
- 0Hospitals and clinics0 hospitals, 0 clinics
Nearest schools and colleges
- Government Model Middle School · 1.64 km
- Bangalore International Academy · 1.88 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Whitefield (Kadugodi) (ವೈಟ್ಫೀಲ್ಡ್ (ಕಾಡುಗೋಡಿ))Open now — nearest operating metro station3.15 km
- Whitefield (ವೈಟ್ಫೀಲ್ಡ್)Nearest railway station2.87 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 1,642 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,642 m
- Koralur Lake on OpenStreetMap (opens in a new tab) (ಕೊರಳೂರು ಕೆರೆ)1,907 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Isha Hilife floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure7 pages

BrochureFull PDF on RERA 





Approved building plan2 files

Area Development Plan Of Project AreaFull PDF on RERA 
Building Plan Fees Endorsement.pdfFull PDF on RERA
Approved layout plan3 files

Approved Layout PlanFull PDF on RERA 
Existing Layout PlanFull PDF on RERA 
Approved Single Site Layout PlanFiled 27 Apr 2024 · Full PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 1 BHK + studio | 528 – 562 sq ft | 26 |
| 2 BHK | 720 – 731 sq ft | 13 |
| 2 BHK + studio | 790 – 958 sq ft | 104 |
| 3 BHK | 949 – 1,016 sq ft | 52 |
| Admin office | 3,447 sq ft | 1 |
| Gym | 3,447 sq ft | 1 |
| Reception area | 3,459 sq ft | 1 |
| Recreational club building | 3,447 sq ft | 4 |
| Yoga hall | 3,447 sq ft | 1 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Isha Hilife possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
By tower (Q2 2026-27)
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 1 BHK + STUDIO | 26 | 26 | 0 |
| 2 BHK | 13 | 13 | 0 |
| 2 BHK + STUDIO | 104 | 104 | 0 |
| 3 BHK | 52 | 52 | 0 |
| ADMIN OFFICE | 1 | 0 | 1 |
| GYM | 1 | 0 | 1 |
| RECEPTION AREA | 1 | 0 | 1 |
| YOGA HALL | 1 | 0 | 1 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 12 Mar 2024Project start date given to RERA
- 3 May 2024Registered with Karnataka RERA
- 31 Dec 2026Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Nov 2026 — about 1 month before the completion date on RERA (31 Dec 2026).
At the pace between the 4 quarterly filings we have (84% → 95% in 9 months), it would be around Feb 2027 — about 1 month after the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 95% | 195 of 199 |
| Q1 2026-27to 30 Jun 2026 | 7 Aug 2026 | 95% | 131 of 199 |
| Q4 2025-26to 31 Mar 2026 | 30 Jul 2026 | 90% | 142 of 199 |
| Q3 2025-26to 31 Dec 2025 | 29 Jul 2026 | 84% | 115 of 199 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 95% ÷ 30.6 months (12 Mar 2024 to 30 Sep 2026) = 3.1% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 5 ÷ 3.1 = 1.6 months → Nov 2026. This is an estimate, not a date from the builder or RERA.
Pace between filings = (95% − 84%) ÷ 9 months = 1.2% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
18 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan | BMRDA - Bangalore Metropolitan Region Development Authority · No. STRRPA/TP/CC/383/2022-23 · dated 2023-12-18 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion | Disctrict Commissioner, Bangalore Rural · No. 195978 · dated 2021-01-08 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approval/NOC under section 109 of KLR Act 1961 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approval/NOC under section 14 of the KTCP Act | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BMRDA - Bangalore Metropolitan Region Development Authority · No. STRRPA/TP/CC/383/2022-23 · dated 18 Dec 2023
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 21 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Isha Hilife RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Isha Corp
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (21 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Isha Corp’s RERA recordIsha Corp delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Isha Corp in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 195Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 195 homes in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Dec 2023
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 95% built, 195 of 199 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 7 Aug 2026Quarterly update filed for Q1 2026-27: 95% built, 131 of 199 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 Jul 2026Quarterly update filed for Q4 2025-26: 90% built, 142 of 199 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 29 Jul 2026Quarterly update filed for Q3 2025-26: 84% built, 115 of 199 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 3 May 2024Registered with Karnataka RERA (PRM/KA/RERA/1250/304/PR/030524/006836); completion date 31 Dec 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Mar 2024Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 18 Dec 2023Building plan approved by BMRDA - Bangalore Metropolitan Region Development Authority (No. STRRPA/TP/CC/383/2022-23) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Isha Hilife FAQs
What is Isha Hilife and who is building it?
Isha Hilife is a residential project by Isha Corp, a partnership firm, located in Thirumalashettihalli, Hosakote, Bengaluru Rural district.
How many homes are in Isha Hilife?
The project has 195 homes across 2 towers.
What home types are available in Isha Hilife?
The project offers 2 BHK (13 homes), 2 BHK + STUDIO (104 homes), 1 BHK + STUDIO (26 homes), and 3 BHK (52 homes).
What is the carpet area range in Isha Hilife?
Carpet areas range from 528 sq ft to 1,016 sq ft depending on home type.
When will Isha Hilife be completed?
The completion date on RERA is 31 December 2026.
What is the RERA registration number for Isha Hilife?
The RERA registration number is PRM/KA/RERA/1250/304/PR/030524/006836, registered on 3 May 2024.
What is the construction progress of Isha Hilife?
As of the latest quarterly update for Q2 2026-27 (ended 30 September 2026), the project is 95 per cent complete with all 195 homes booked.
Are there any RERA complaints against Isha Hilife or Isha Corp?
There are no RERA complaints against this project or the builder.
What is the location and PIN code of Isha Hilife?
The project is in Thirumalashettihalli, Hosakote taluk, Bengaluru Rural district, PIN code 560067.
Which bank holds the escrow account for Isha Hilife?
Axis Bank holds the escrow account for the project.
Written by AI from the RERA record above on 21 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Isha Hilife
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Isha Corp? Review the builder.
Reviews of Isha Corp by verified buyers
No verified reviews of Isha Corp yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Surya Humming BirdSurya Projects | 1.1 km | 281 | Dec 2025 | 99% | 0 | Not collected |
| AnahataIshtika Vibranium Developers LLP | 1.1 km | 440 | Jul 2029 | — | 0 | Not collected |
| Trivik SignatureTrivik Signature | 1.1 km | 408 | Dec 2031 | 21% | 0 | Not collected |
| Sowparnika Rhythm of RainSowparnika Homes Private Limited | 1.2 km | 725 | Jan 2032 | 36% | 0 | Not collected |
| Sowparnika AshiyanaSowparnika Projects And Infrastructure Private Limited | 1.3 km | 1,518 | Dec 2025 | — | 0 | Not collected |
| United Green WoodsUnited Green Woods | 1.3 km | 282 | Mar 2028 | 65% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 21 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1250/304/PR/030524/006836.
- RERA record last checked: 21 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 21 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
- Channasandra, near Kadugodi–Hope Farm© Esri, Maxar, Earthstar GeographicsUnder constructionRERA registeredBuyers’ group open
Surya Humming Bird
by Surya
Price: Price on requestGet brochure & price →
- 2 BHK, 2.5 BHK, 3 BHK
- 789 – 1,080 sq ft
- Dec 2025
RERA not updated since promised Dec 2025 · 281 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Surya Humming Bird
Samethanahalli, near Kadugodi–Hope FarmUnder constructionRERA registeredBuyers’ group openAnahata
by Ishtika Vibranium
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 2.5 BHK, 3 BHK
- 369 – 1,073 sq ft
- Jul 2029
2 phases on RERA · 440 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Anahata
Koralur, near Kadugodi–Hope FarmUnder constructionRERA registeredBuyers’ group openTrivik Signature
by Trivik Signature
Price: Price on requestGet brochure & price →
- 3 BHK
- 986 – 1,990 sq ft
- Dec 2031
408 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Trivik Signature