Assetz Sora & Saki
2 & 3 BHK apartments by Netra Software Technologies Private Limited · Bagalur, Bengaluru
Bagalur, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
by Netra Software Technologies Private Limited
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Assetz Sora & Saki at a glance
- Possession (RERA)Jul 2029Karnataka RERA
- Construction80% built · on pace for May 2027RERA filing to 30 Sep 2026 (Phase 1); estimate from average pace
- RERA complaints (project)None listedKarnataka RERA · as on 21 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 21 Oct 2026
- Nearest metroAirport City · 5.66 km (under construction)Open now: Krishnarajapura, 16.45 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 26 min at peak6.42 km straight line · estimate
- Nearest lakeGummanahalli Lake · 1,064 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Assetz Sora & Saki is a residential project by Netra Software Technologies Private Limited in Bagalur, Bengaluru with 992 homes, registered with Karnataka RERA. The completion date on RERA is 31 Jul 2029. It is registered in 2 phases.
Facts collected on 21 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Assetz Sora & Saki buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Netra Software Technologies Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Assetz Sora & Saki buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- Studio, 2 BHK, 3 BHK
- Carpet area
- 174 – 1,182 sq ft
- Towers
- 5
- Floors
- 18
- Total homes
- 992
- Land
- 8.28 acres
- Possession (RERA)
- Jul 2029
- Built (RERA update)
- Not found in public records yet: construction progress
Assetz Sora & Saki RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/309/PR/060324/006692
- Registered on
- 6 Mar 2024
- Promised completion
- 31 Jul 2029
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- Not found in public records yet: homes booked
- Price
- Not found in public records yet: price
- Project type
- Residential
2 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.
Phases and RERA numbers
| Phase | RERA number | Promised completion | Homes | Status | Source |
|---|---|---|---|---|---|
| Phase 1 | PRM/KA/RERA/1251/309/PR/060324/006692 | 30 Sep 2028 | 358 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase 2 | PRM/KA/RERA/1251/309/PR/210524/006929 | 31 Jul 2029 | 634 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
Towers and blocks (RERA filing)
| Tower | Phase | Floors | Basements | Homes |
|---|---|---|---|---|
| WING A-1 | Phase 1 | 18 | 1 | 179 |
| WING A-2 | Phase 1 | 18 | 1 | 179 |
| WING A3 | Phase 2 | 18 | 1 | 205 |
| WING A4 | Phase 2 | 18 | 1 | 215 |
| WING A5 | Phase 2 | 18 | 1 | 214 |
A dash (—) means the filing did not state that value.
Summary in plain English
Assetz Sora & Saki is a residential project by Netra Software Technologies Private Limited in Bagalur, Bengaluru North. The project has 992 homes across 2 phases with 5 towers. Phase 1 (358 homes) is scheduled for completion on 30 September 2028, and Phase 2 (634 homes) on 31 July 2029.
Written by AI from the RERA record above on 21 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: Local Authority
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA) · Phase 1
- FEDERAL BANK OF INDIA, Indiranagar
- Escrow bank (RERA) · Phase 2
- FEDERAL BANK OF INDIA, Koramangala
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Community Hall
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water & Sanitation
- Air Conditioning - Provision only for units and selected amenities
- Water and Sanitation
- Air Conditioning
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Assetz Sora & Saki location and address
- Address
- PLOT Nos. R-9-D1, R-9-D2, R-9-D1-P & R-9-D2-P OF HITECH, DEFENCE & AEROSPACE PARK, (HARDWARE SECTOR) COMPRISED IN SURVEY Nos. 176, 177, 470, 471 OF , BAGALUR VILLAGE AND SURVEY NO. 176 & 82 OF HOOVINAYAKANAHALLI VILLAGE, JALA HOBLI , Bengaluru North , Bengaluru Urban, Karnataka - 562149
- Village (RERA)
- Bagalur
- Locality
- BagalurAlso known as Bagaluru, Aerospace Park
- PIN code
- 562149
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.14778, 77.68080
Distances to landmarks
Not found in public records yet: landmarksAbout Bagalur
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 6.42 km | approx. 26 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 12.9 km | approx. 52 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 18.85 km | approx. 76 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 22.38 km | approx. 91 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 24.92 km | approx. 101 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 33.19 km | approx. 134 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 5Schools and colleges5 schools, 0 colleges, 0 kindergartens
- 2Hospitals and clinics1 hospitals, 1 clinics
Nearest schools and colleges
- Jawahar Navodaya Vidyalaya · 0.82 km
- Government High School · 0.99 km
- Vidyan Earth School · 1.97 km
Nearest hospitals and clinics
- Vikrant Hospital · 1.03 km
- SLV Poly Clinic · 1.23 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Airport City (ವಿಮಾನ ನಿಲ್ದಾಣ ನಗರ)Blue Line metro, under construction5.66 km
- Doddajala (ದೊಡ್ಡಜಾಲ)Blue Line metro, under construction5.98 km
- KIAL Terminals (ಕೆಐಎಬಿ ವಿಮಾನ ನಿಲ್ದಾಣ ಟರ್ಮಿನಲ್ಸ್)Blue Line metro, under construction6.59 km
- Krishnarajapura (ಕೃಷ್ಣರಾಜಪುರ (ಕೆ.ಆರ್.ಪುರ))Open now — nearest operating metro station16.45 km
- Doddajala Nearest railway station5.66 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Gummanahalli Lake, 1,064 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Gummanahalli Lake on OpenStreetMap (opens in a new tab) 1,064 m
- Huvinayakanahalli Lake on OpenStreetMap (opens in a new tab) 1,210 m
- Bagaluru Kere on OpenStreetMap (opens in a new tab) (ಬಾಗಲೂರು ಕೆರೆ)1,726 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Assetz Sora & Saki floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure16 pages

Phase 2: BrochureFull PDF on RERA 






Floor plans4 files

Phase 1: 3 Ground Floor Plan.pdfFull PDF on RERA 
Phase 2: Annexure 12-Floor PlanFiled 20 May 2024 · Full PDF on RERA 
Phase 1: 2 Basement Floor Plan.pdfFull PDF on RERA 
Phase 1: 7 First Second and Terrace Floor Plan.pdfFull PDF on RERA
Approved building plan2 files

Phase 2: Approved Building/Plotting PlanFull PDF on RERA 
Phase 1: Approved Building/Plotting PlanFull PDF on RERA
Approved layout plan5 files

Phase 2: Annexure 112-Demarcation Drawing.pdfFull PDF on RERA 
Phase 2: Annexure 5-Single layout PlanFiled 20 May 2024 · Full PDF on RERA 
Phase 1: CDP Map Demarcation.pdfFull PDF on RERA 
Phase 1: Location Demarcation.pdfFull PDF on RERA 
Phase 1: STP Demarcation and Design.pdfFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 996 sq ft | 350 |
| 3 BHK | 1,139 – 1,182 sq ft | 650 |
| Ews/studio | 174 sq ft | 278 |
| Studio | 174 sq ft | 278 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Assetz Sora & Saki possession date and construction status
Timeline
- 6 Mar 2024Phase 1: Registered with Karnataka RERA
- 1 Apr 2024Phase 1: Project start date given to RERA
- 1 May 2024Phase 2: Project start date given to RERA
- 21 May 2024Phase 2: Registered with Karnataka RERA
- 30 Sep 2028Phase 1: Completion date given at registration
- 31 Jul 2029Phase 2: Completion date given at registration
Construction pace from RERA quarterly filings (Phase 1)
At the average pace so far, construction would reach 100% around May 2027 — about 17 months before the completion date on RERA (30 Sep 2028).
At the pace between the 4 quarterly filings we have (50% → 80% in 9 months), it would be around Mar 2027 — about 18 months before the RERA date.
This project has 2 RERA registrations; the chart uses Phase 1, the one with the most quarterly filings.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 80% | 314 of 358 |
| Q1 2026-27to 30 Jun 2026 | 14 Jul 2026 | 72% | 313 of 358 |
| Q4 2025-26to 31 Mar 2026 | 27 May 2026 | 69% | 315 of 358 |
| Q3 2025-26to 31 Dec 2025 | 16 Jan 2026 | 50% | 313 of 358 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 80% ÷ 30 months (1 Apr 2024 to 30 Sep 2026) = 2.7% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 20 ÷ 2.7 = 7.5 months → May 2027. This is an estimate, not a date from the builder or RERA.
Pace between filings = (80% − 50%) ÷ 9 months = 3.3% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
27 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan (Phase 1) | KIADB - Karnataka Industrial Areas Development Board · No. DO3-KIADB-00018/23-24/BP · dated 2024-02-15 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Building plan (Phase 2) | KIADB - Karnataka Industrial Areas Development Board · No. DO3-KIADB-00018/23-24/BP · dated 2024-02-15 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (Phase 2) | KIADB · No. Notification Number CI 649 SPQ 2007 · dated 2008-04-09 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA (Phase 2)
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — KIADB - Karnataka Industrial Areas Development Board · No. DO3-KIADB-00018/23-24/BP · dated 15 Feb 2024
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 21 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.
Assetz Sora & Saki RERA complaints
No complaints listed on Karnataka RERA for these registrations as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Netra Software Technologies Private Limited
- Promoter type
- Company
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- U72200KA2004PTC033597
From Karnataka RERA, as collected so far (21 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Netra Software Technologies Private Limited’s RERA recordNetra Software Technologies Private Limited delivery record
- 1Projects in Bengaluru on RERA2 approved registrations under Netra Software Technologies Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 992Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 992 homes in its 2 registrations on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Feb 2024
- 15 Oct 2026Phase 1: Quarterly update filed for Q2 2026-27: 80% built, 314 of 358 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Oct 2026Phase 2: Quarterly update filed for Q2 2026-27: 29% built, 242 of 634 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jul 2026Phase 1: Quarterly update filed for Q1 2026-27: 72% built, 313 of 358 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jul 2026Phase 2: Quarterly update filed for Q1 2026-27: 26% built, 224 of 634 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 27 May 2026Phase 1: Quarterly update filed for Q4 2025-26: 69% built, 315 of 358 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 27 May 2026Phase 2: Quarterly update filed for Q4 2025-26: 24% built, 208 of 634 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 16 Jan 2026Phase 1: Quarterly update filed for Q3 2025-26: 50% built, 313 of 358 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 16 Jan 2026Phase 2: Quarterly update filed for Q3 2025-26: 20% built, 184 of 634 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 21 May 2024Phase 2: Registered with Karnataka RERA (PRM/KA/RERA/1251/309/PR/210524/006929); completion date 31 Jul 2029 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 May 2024Phase 2: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Apr 2024Phase 1: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 6 Mar 2024Phase 1: Registered with Karnataka RERA (PRM/KA/RERA/1251/309/PR/060324/006692); completion date 30 Sep 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Feb 2024Phase 1: Building plan approved by KIADB - Karnataka Industrial Areas Development Board (No. DO3-KIADB-00018/23-24/BP) Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Feb 2024Phase 2: Building plan approved by KIADB - Karnataka Industrial Areas Development Board (No. DO3-KIADB-00018/23-24/BP) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Assetz Sora & Saki FAQs
What is the RERA registration number for Assetz Sora & Saki?
Phase 1 is registered as PRM/KA/RERA/1251/309/PR/060324/006692 (registered 6 March 2024) and Phase 2 as PRM/KA/RERA/1251/309/PR/210524/006929 (registered 21 May 2024).
How many homes are in each phase of Assetz Sora & Saki?
Phase 1 has 358 homes in 2 towers, and Phase 2 has 634 homes in 3 towers.
What home types are available in Assetz Sora & Saki?
Phase 1 offers Studios (174 sq ft), 2 BHK (996 sq ft), and 3 BHK (1,139–1,182 sq ft). Phase 2 offers EWS/Studios (174 sq ft), 2 BHK (996 sq ft), 3 BHK (1,139–1,182 sq ft), and Studios (174 sq ft).
When will Assetz Sora & Saki be completed?
Phase 1 completion is scheduled for 30 September 2028, and Phase 2 for 31 July 2029.
What is the construction progress of Assetz Sora & Saki as of Q2 2026-27?
Phase 1 is 80% complete, and Phase 2 is 29% complete.
How many homes have been booked in Assetz Sora & Saki?
As of Q2 2026-27, 314 homes have been booked in Phase 1 (out of 358) and 242 homes in Phase 2 (out of 634).
Where is Assetz Sora & Saki located?
The project is in Bagalur, Bengaluru North taluk, Bengaluru Urban district, PIN code 562149.
Are there any RERA complaints on Assetz Sora & Saki?
There are no RERA complaints on this project.
What is the builder's track record with RERA?
Netra Software Technologies Private Limited has no RERA complaints against it across all projects and has 1 project in the Bengaluru RERA records.
Which bank handles the escrow account for Assetz Sora & Saki?
Federal Bank of India is the escrow bank for both phases.
Written by AI from the RERA record above on 21 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Assetz Sora & Saki
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Netra Software Technologies Private Limited? Review the builder.
Reviews of Netra Software Technologies Private Limited by verified buyers
No verified reviews of Netra Software Technologies Private Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Assetz Sora & Saki Phase 3Vedant Homes | 0.1 km | 304 | Apr 2029 | 37% | 0 | Not collected |
| Dhruvija GopuraDhruvija Gopura | 0.2 km | 250 | Mar 2032 | 5% | 0 | Not collected |
| Soul@Godrej AnandaGodrej Properties Limited | 0.3 km | 2,210 | Aug 2028 | 63% | 1 | Not collected |
| Aurum at Brigade El DoradoBrigade Enterprises Ltd | 0.6 km | 635 | Dec 2027 | 86% | 0 | Not collected |
| Cobalt at Brigade El DoradoBrigade Enterprises Ltd | 0.6 km | 948 | Jun 2029 | 70% | 0 | Not collected |
| Emerald & Luminaire Block at Brigade El DoradoBrigade Enterprises Ltd | 0.6 km | 1,236 | Dec 2026 | 100% | 2 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 21 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/309/PR/060324/006692, PRM/KA/RERA/1251/309/PR/210524/006929.
- RERA record last checked: 21 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 21 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Bagalur
BagalurUnder constructionRERA registeredBuyers’ group openAssetz Sora & Saki Phase 3
by Vedant Homes
Price: Price on requestGet brochure & price →
- Studio, 3 BHK, 4 BHK
- 202 – 1,476 sq ft
- Apr 2029
304 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Assetz Sora & Saki Phase 3
BagalurUnder constructionRERA registeredBuyers’ group openDhruvija Gopura
by Dhruvija Gopura
Price: Price on requestGet brochure & price →
- Studio, 1 BHK, 2 BHK, 3 BHK
- 181 – 1,262 sq ft
- Mar 2032
250 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Dhruvija Gopura
BagalurUnder constructionRERA registeredBuyers’ group openSoul@Godrej Ananda
by Godrej Properties
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 2.5 BHK, 3 BHK
- 191 – 896 sq ft
- Aug 2028
2,210 homes · 1 RERA complaint
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Soul@Godrej Ananda