Bellezea
4 & 5 BHK apartments by M/S Nambiar Builders Pvt Ltd · Narayanaghatta, Bengaluru
Narayanaghatta, Bengaluru
- Under construction
- RERA registered
- residential
by M/S Nambiar Builders Pvt Ltd
Price: Price on request
Villa exterior and community view © M/S Nambiar Builders PVT LTD · Source ↗ (opens in a new tab)
Bellezea at a glance
- Possession (RERA)Jan 2027 ExtendedWas Sep 2024 · Karnataka RERA
- Construction97% built · on pace for Jan 2027RERA filing to 30 Sep 2026 (Phase IV); estimate from average pace
- RERA complaints (project)None listedKarnataka RERA · as on 14 Oct 2026
- Approvals filed1 of 9 on RERAKarnataka RERA uploads · 14 Oct 2026
Project summary
Bellezea is a residential project by M/S Nambiar Builders Pvt Ltd in Narayanaghatta, Bengaluru with 85 homes, registered with Karnataka RERA. The completion date on RERA is 11 Jan 2027. It is registered in 2 phases.
Not in the RERA record we collected yet: map location. This page fills in as the record is collected.
Facts collected on 14 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Bellezea buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks M/S Nambiar Builders Pvt Ltd for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Bellezea buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 4 BHK, 5 BHK, Plot
- Carpet area
- 2,590 – 5,084 sq ft
- Towers
- 5
- Floors
- 2
- Total homes
- 85
- Land
- 12.5 acres
- Possession (extended)
- Jan 2027
- Built (RERA update)
- Not found in public records yet: construction progress
Bellezea RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/308/PR/180521/001786
- Registered on
- 21 May 2018
- Promised completion
- 22 Sep 2024
- Extended to
- 11 Jan 2027
- RERA status
- New launch
- Homes booked
- Not found in public records yet: homes booked
- Price
- Not found in public records yet: price
- Project type
- Residential
2 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.
Phases and RERA numbers
| Phase | RERA number | Promised completion | Homes | Status | Source |
|---|---|---|---|---|---|
| Phase IV | PRM/KA/RERA/1251/308/PR/180521/001786 | 11 Apr 2023Extended to 11 Jan 2027 | 48 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase V | PRM/KA/RERA/1251/308/PR/191025/002972 | 22 Sep 2024Extended to 22 Jun 2025 | 37 | Completed | Source (rera.karnataka.gov.in) (opens in a new tab) |
Towers and blocks (RERA filing)
| Tower | Phase | Floors | Basements | Homes |
|---|---|---|---|---|
| BLOCK A | Phase IV | 2 | 0 | 11 |
| BLOCK B | Phase IV | 2 | 0 | 1 |
| BLOCK C | Phase IV | 2 | 0 | 10 |
| BLOCK D | Phase IV | 2 | 0 | 3 |
| BLOCK E | Phase IV | 2 | 0 | 23 |
A dash (—) means the filing did not state that value.
Summary in plain English
Bellezea is a residential project by M/S Nambiar Builders Pvt Ltd in Narayanaghatta, Anekal, with 85 homes across two phases. Phase IV has 48 homes in 5 towers and Phase V has 37 plots, with completion dates of 11 January 2027 and 22 June 2025 respectively on RERA.
Written by AI from the RERA record above on 14 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Not found in public records yet: water and power
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA) · Phase IV
- RATNAKAR BANK, Bangalore-Prestige Towers
- Escrow bank (RERA) · Phase V
- HDFC, MARATHAHALLI
Amenities
Bellezea location and address
- Address
- NARAYANAGHATTA VILLAGE, SARJAPURA HOBLI
- Village (RERA)
- Narayanaghatta
- PIN code
- 560099
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- Not found in public records yet: coordinates
Distances to landmarks
Not found in public records yet: landmarksAbout Narayanaghatta
Not found in public records yet: locality factsBellezea home types and carpet areas
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 4 BHK | 2,590 – 5,074 sq ft | 47 |
| 5 BHK | 5,084 sq ft | 1 |
| Plot | 4,009 sq ft | 37 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Bellezea possession date and construction status
Timeline
- 11 Apr 2018Phase IV: Project start date given to RERA
- 21 May 2018Phase IV: Registered with Karnataka RERA
- 23 Sep 2019Phase V: Project start date given to RERA
- 25 Oct 2019Phase V: Registered with Karnataka RERA
- 11 Apr 2023Phase IV: Completion date given at registration
- 11 Jan 2024Phase IV: Covid Extension: completion date moved to this date
- 22 Sep 2024Phase V: Completion date given at registration
- 11 Jan 2025Phase IV: Section 6 Extension: completion date moved to this date
- 17 Apr 2025Phase V: Promoter applied to RERA for completion
- 22 Jun 2025Phase V: Covid Extension: completion date moved to this date
- 11 Jan 2027Phase IV: Further Extension: completion date moved to this date
Construction pace from RERA quarterly filings (Phase IV)
At the average pace so far, construction would reach 100% around Jan 2027 — the same month as the completion date on RERA (11 Jan 2027).
At the pace between the 4 quarterly filings we have (84% → 97% in 9 months), it would be around Dec 2026 — about 1 month before the RERA date.
This project has 2 RERA registrations; the chart uses Phase IV, the one with the most quarterly filings.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 14 Oct 2026 | 97% | 28 of 48 |
| Q1 2026-27to 30 Jun 2026 | 14 Jul 2026 | 91% | 28 of 48 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 87% | 28 of 48 |
| Q3 2025-26to 31 Dec 2025 | 15 Jan 2026 | 84% | 27 of 48 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 97% ÷ 101.6 months (11 Apr 2018 to 30 Sep 2026) = 1% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 3 ÷ 1 = 3.1 months → Jan 2027. This is an estimate, not a date from the builder or RERA.
Pace between filings = (97% − 84%) ÷ 9 months = 1.4% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan (Phase IV) | Local Planing Authority | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Layout plan (Phase V) | BMRDA - Bangalore Metropolitan Region Development Authority | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA (Phase IV)
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Commencement certificate · Permission to start buildingNot on RERA yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBNot on RERA yet
- Electricity · BESCOMNot on RERA yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 14 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.
Bellezea RERA complaints
No complaints listed on Karnataka RERA for these registrations as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About M/S Nambiar Builders Pvt Ltd
- Promoter type
- Company
- Projects on this site
- 2
- RERA complaints against promoter
- 1
- Company number (CIN)
- U45201KA2009PTC050747
From Karnataka RERA, as collected so far (14 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
M/S Nambiar Builders Pvt Ltd’s RERA recordM/S Nambiar Builders Pvt Ltd delivery record
- 2Projects in Bengaluru on RERA5 approved registrations under M/S Nambiar Builders Pvt Ltd in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 355Homes and plots registeredAs stated in each registrations.
- 1RERA complaints0 open, 1 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 2.8Complaints per 1,000 homes and plots1 complaints ÷ 355 homes and plots in its 5 registrations on Karnataka RERA in Bengaluru.
- 3Completion filed on RERARegistrations where the promoter applied to RERA for completion; 0 with an occupancy certificate on RERA.
- 2 of 3Filed by the date given at registrationMedian gap 0 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
What the complaints are about
1 complaint subject as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| Ellegenza Phase I Extension-2 | 1 May 2027 | 27 Apr 2026 | By the date |
| Ellegenza Phase I Extension | 31 Mar 2027 | 24 Jul 2025 | By the date |
| Bellezea Phase V | 22 Sep 2024extended to 22 Jun 2025 | 17 Apr 2025 | 7 months after |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Apr 2018
- 11 Jan 2027Phase IV: Completion date extended to 11 Jan 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Oct 2026Phase IV: Quarterly update filed for Q2 2026-27: 97% built, 28 of 48 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jul 2026Phase IV: Quarterly update filed for Q1 2026-27: 91% built, 28 of 48 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Phase IV: Quarterly update filed for Q4 2025-26: 87% built, 28 of 48 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jan 2026Phase IV: Quarterly update filed for Q3 2025-26: 84% built, 27 of 48 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 22 Jun 2025Phase V: Completion date extended to 22 Jun 2025 Source (rera.karnataka.gov.in) (opens in a new tab)
- 17 Apr 2025Phase V: Promoter applied to RERA for completion Source (rera.karnataka.gov.in) (opens in a new tab)
- 25 Oct 2019Phase V: Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/191025/002972); completion date 22 Sep 2024 Source (rera.karnataka.gov.in) (opens in a new tab)
- 23 Sep 2019Phase V: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 21 May 2018Phase IV: Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/180521/001786); completion date 11 Apr 2023 Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 Apr 2018Phase IV: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Bellezea FAQs
What is the completion date for Bellezea Phase IV?
The current completion date on RERA is 11 January 2027. This has been extended three times: from 11 April 2023 to 11 January 2024 (Covid Extension), then to 11 January 2025 (Section 6 Extension), and finally to 11 January 2027 (Further Extension).
What is the completion date for Bellezea Phase V?
The current completion date on RERA is 22 June 2025, extended from 22 September 2024 due to Covid Extension.
How many homes are in Bellezea and what types are available?
Phase IV has 48 homes: 47 units of 4 BHK with carpet area from 2,590 to 5,074 sq ft, and 1 unit of 5 BHK with 5,084 sq ft. Phase V has 37 plots.
What is the current construction progress of Bellezea Phase IV?
As of 30 September 2026, Phase IV is 97% complete with 28 homes booked out of 48.
What are the RERA registration numbers for Bellezea?
Phase IV is registered as PRM/KA/RERA/1251/308/PR/180521/001786 and Phase V is registered as PRM/KA/RERA/1251/308/PR/191025/002972.
Are there any RERA complaints against Bellezea?
There are no RERA complaints on either phase of Bellezea.
Where is Bellezea located?
Bellezea is in Narayanaghatta, Anekal taluk, Bengaluru Urban district, with PIN code 560099.
Who is the builder of Bellezea and what is their track record?
The builder is M/S Nambiar Builders Pvt Ltd, a company with 4 projects in the Bengaluru RERA records and 1 RERA complaint across all their projects.
Which banks are holding escrow funds for Bellezea?
Phase IV escrow is held by Ratnakar Bank and Phase V escrow is held by HDFC.
How many quarterly updates has Bellezea Phase IV filed with RERA?
Phase IV has filed 4 quarterly updates with RERA.
Written by AI from the RERA record above on 14 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Bellezea
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from M/S Nambiar Builders Pvt Ltd? Review the builder.
Reviews of M/S Nambiar Builders Pvt Ltd by verified buyers
No verified reviews of M/S Nambiar Builders Pvt Ltd yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Sources and last checked dates
Collected on 14 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/308/PR/180521/001786, PRM/KA/RERA/1251/308/PR/191025/002972.
- RERA record last checked: 14 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 14 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
Hosakerehalli, Rajarajeshwari NagarArtist’s impressionUnder constructionRERA registeredBuyers’ group openSobha Valley View - Heritage
by Sobha
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 917 – 1,267 sq ft
- Feb 2019
RERA not updated since promised Feb 2019 · 624 homes · 19 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Sobha Valley View - Heritage
Agara, HSR LayoutArtist’s impressionUnder constructionRERA registeredBuyers’ group openSterling Infinia
by Sterling
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 3 BHK, 4 BHK
- 904 – 2,336 sq ft
- Sep 2026 (extended)
RERA not updated since promised Sep 2026 · 344 homes · 4 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Sterling Infinia
Kammanahalli, near Begur RoadUnder constructionRERA registeredBuyers’ group openSound of Water Phase 3
by Puravankara
Price: Price on requestGet brochure & price →
- 3 BHK, 4 BHK
- 1,787 – 2,749 sq ft
- Jun 2027
60 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Sound of Water Phase 3