DS Max Sky Sukhino
2 & 3 BHK apartments by DS Max Properties Private Limited · Kurubarahalli, Bengaluru
Kurubarahalli, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
DS Max Sky Sukhino at a glance
- Possession (RERA)Mar 2031Karnataka RERA
- Construction9% built · on pace for Dec 2030RERA filing to 30 Sep 2026; estimate from average pace
- Homes booked33 of 180 (18%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 19 Oct 2026
- Builder on-time record17 of 21 on time Some lateCompleted projects: OC date vs promised date
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 19 Oct 2026
- Nearest metroChallaghatta · 10.02 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 167 min at peak41.18 km straight line · estimate
- Nearest lakeUnnamed lake · 1,178 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
DS Max Sky Sukhino is a residential project by DS Max Properties Private Limited in Kurubarahalli, Bengaluru with 180 homes, registered with Karnataka RERA. The completion date on RERA is 31 Mar 2031.
Facts collected on 19 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
DS Max Sky Sukhino buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks DS-Max Properties for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the DS Max Sky Sukhino buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK
- Carpet area
- 660 – 1,140 sq ft
- Towers
- 1
- Floors
- 14
- Total homes
- 180
- Land
- 1.6 acres
- Possession (RERA)
- Mar 2031
- Built (RERA update)
- 9%
DS Max Sky Sukhino RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/310/PR/050526/008622
- Registered on
- 5 May 2026
- Promised completion
- 31 Mar 2031
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 33 of 180 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| SUKHINO | 14 | 2 | 180 |
A dash (—) means the filing did not state that value.
Summary in plain English
DS Max Sky Sukhino is a 1-tower, 180-home residential project by DS Max Properties Private Limited in Kurubarahalli, Bengaluru South. The homes include 2 BHK and 3 BHK units with carpet areas ranging from 660 to 1,140 sq ft. The project has a registered completion date of 31 March 2031.
Written by AI from the RERA record above on 19 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 84.8% of land
- Water and power
- Water source filed with RERA: Local Authority
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- Indian Bank, KALYAN NAGAR
- Building plan (RERA)
- Magadi Planning Authority · No. 40/2025-26/962 · dated 13 Jan 2026
- Project cost declared to RERA
- ₹56.5 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- C.C.T.V Surveillance
- Community Hall
- Outdoor Sports Facility
- Indoor Sports Facility
- Swimming Pool
- Park
- Power Backup
- Water & Sanitation
- Gym
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
DS Max Sky Sukhino location and address
- Address
- KATHA NO. 150200301700223463, AT SY.NO. 204/3, 204/8 & 204/9 OF , KURUBARAHALLI VILLAGE, TAWAREKERE HOBLI , Bengaluru South , Bengaluru Urban, Karnataka - 562130
- Village (RERA)
- Kurubarahalli
- PIN code
- 562130
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.97016, 77.40688
Distances to landmarks
Not found in public records yet: landmarksAbout Kurubarahalli
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 17.65 km | approx. 71 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 24.65 km | approx. 100 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 30.18 km | approx. 122 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 31.02 km | approx. 126 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 35.91 km | approx. 145 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 41.18 km | approx. 167 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Nearest metro station and railway
- Challaghatta (ಚಲ್ಲಘಟ್ಟ)Open now — nearest operating metro station10.02 km
- Kengeri (ಕೆಂಗೇರಿ)Nearest railway station10.17 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 1,178 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,178 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,303 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,391 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
DS Max Sky Sukhino floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Floor plans2 files

Page 4 GROUND & TYPICAL FLOOR PLAN.pdfFull PDF on RERA 
Page 3 1ST BASEMENT FLOOR PLAN.pdfFull PDF on RERA
Elevations

Page 2 2ND BASEMENT - ELEVATION PLAN.pdfFull PDF on RERA
Approved building plan

Approved Building PlanFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 660 – 754 sq ft | 47 |
| 2 BHK - c | 797 sq ft | 2 |
| 2 BHK-c | 795 sq ft | 2 |
| 3 BHK | 807 – 995 sq ft | 73 |
| 3 BHK - c | 1,022 sq ft | 58 |
| 3 BHK-c | 884 – 1,140 sq ft | 58 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
DS Max Sky Sukhino possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2 BHK | 47 | 15 | 32 |
| 2 BHK-C | 2 | 0 | 2 |
| 3 BHK | 73 | 18 | 55 |
| 3 BHK-C | 58 | 0 | 58 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 1 May 2026Project start date given to RERA
- 5 May 2026Registered with Karnataka RERA
- 31 Mar 2031Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Dec 2030 — about 3 months before the completion date on RERA (31 Mar 2031).
At the pace between the 2 quarterly filings we have (1% → 9% in 3 months), it would be around Aug 2029 — about 20 months before the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 14 Oct 2026 | 9% | 33 of 180 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 1% | 20 of 180 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 9% ÷ 5 months (1 May 2026 to 30 Sep 2026) = 1.8% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 91 ÷ 1.8 = 50.5 months → Dec 2030. This is an estimate, not a date from the builder or RERA.
Pace between filings = (9% − 1%) ÷ 3 months = 2.6% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | Magadi Planning Authority · No. 40/2025-26/962 · dated 2026-01-13 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (3 orders) | DC Office, Bangalore · No. 619836 and 2 more · dated 2024-02-21 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — Magadi Planning Authority · No. 40/2025-26/962 · dated 13 Jan 2026
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 19 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
DS Max Sky Sukhino RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About DS-Max Properties
- Founded
- 2007
- Headquarters
- Bengaluru
- Bengaluru projects
- 44
- Delivered on time
- 17 of 21
- RERA complaints
- 19
- Court cases listed
- 6
DS Max Properties Private Limited (CIN U70102KA2007PTC041508) has 44 projects registered with Karnataka RERA in the Bengaluru area. Of the 21 whose records show an occupancy certificate, 17 got it on or before the completion date promised at registration, 3 got it after that date but within a COVID-19 extension, and Sky Grand got it two days after its extended date; Sunworth, Sovereign and Sahara show no OC although their dates have passed. Karnataka RERA lists 19 complaints against the promoter (14 disposed), mostly about late handover, refunds and unregistered sale agreements, and the court cases found include a 2024 High Court order directing the builder to help form a flat owners' association at DS-Max Starnest.
DS-Max Properties’s full recordDS-Max Properties delivery record
- 24Projects in Bengaluru on RERA24 approved registrations under DS Max Properties Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 10,303Homes registeredAs stated in each registrations.
- 19RERA complaints5 open, 14 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 1.8Complaints per 1,000 homes19 complaints ÷ 10,303 homes in its 24 registrations on Karnataka RERA in Bengaluru.
- 9Completion filed on RERARegistrations where the promoter applied to RERA for completion; 9 with an occupancy certificate on RERA.
- 3 of 9Filed by the date given at registrationMedian gap 10.1 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
- 6Court cases listedFound in public court records; see the list on the builder’s page.
What the complaints are about
19 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| DS Max ShrestaOC on RERA | 31 Jul 2026 | 25 Sep 2026 | 2 months after |
| DS Max Sky ShubhamOC on RERA | 31 Mar 2027 | 11 May 2026 | By the date |
| DS Max SenateOC on RERA | 30 Jun 2026 | 11 May 2026 | By the date |
| DS Max Stavam NestOC on RERA | 30 Jun 2026 | 11 May 2026 | By the date |
| DS-Max Sky SupremeOC on RERA | 31 Dec 2023extended to 30 Sep 2024 | 2 Feb 2026 | 25 months after |
| DS Max Sonata NestOC on RERA | 30 Jun 2024 | 2 Feb 2026 | 19 months after |
| DS Max SasmaraOC on RERA | 31 Dec 2024 | 2 Feb 2026 | 13 months after |
| Sky GrandOC on RERA | 31 Mar 2023extended to 30 Dec 2024 | 31 Jan 2026 | 34 months after |
| DS Max StavamOC on RERA | 31 Mar 2025 | 31 Jan 2026 | 10 months after |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Handovers we checked by hand
21 rows: handovers. Scroll inside the table to see them all.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)How we calculate this
What’s changed since Jan 2026
- 14 Oct 2026Quarterly update filed for Q2 2026-27: 9% built, 33 of 180 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 1% built, 20 of 180 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 5 May 2026Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/050526/008622); completion date 31 Mar 2031 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 May 2026Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Jan 2026Building plan approved by Magadi Planning Authority (No. 40/2025-26/962) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
DS Max Sky Sukhino FAQs
When will DS Max Sky Sukhino be completed?
The project completion date on RERA is 31 March 2031.
What is the RERA registration number for DS Max Sky Sukhino?
The RERA registration number is PRM/KA/RERA/1251/310/PR/050526/008622.
How many homes are in DS Max Sky Sukhino?
The project has 180 homes in 1 tower with 14 floors.
What are the home types and carpet areas in DS Max Sky Sukhino?
The project has 2 BHK homes with carpet areas from 660 to 797 sq ft, and 3 BHK homes with carpet areas from 807 to 1,140 sq ft.
How many homes are booked in DS Max Sky Sukhino?
As of Q2 2026-27 (quarter ended 30 September 2026), 33 homes are booked out of 180.
What is the construction progress of DS Max Sky Sukhino?
As of Q2 2026-27, the project is 9% complete.
Are there any RERA complaints against DS Max Sky Sukhino?
There are no RERA complaints on this project registration.
Where is DS Max Sky Sukhino located?
The project is in Kurubarahalli, Bengaluru South taluk, Bengaluru Urban district, PIN code 562130.
How many projects does DS Max Properties have on RERA record?
DS Max Properties has 44 projects in the Bengaluru RERA record.
How many complaints are there against DS Max Properties across all projects?
There are 19 RERA complaints against DS Max Properties across all their projects.
Written by AI from the RERA record above on 19 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about DS Max Sky Sukhino
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from DS-Max Properties? Review the builder.
Reviews of DS-Max Properties by verified buyers
No verified reviews of DS-Max Properties yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Shilpa RathnaShilpa High Rise Private Limited | 3.7 km | 110 | Jan 2027 | 97% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 19 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/310/PR/050526/008622.
- RERA record last checked: 19 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 19 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
Vijinapura, KR PuramUnder constructionRERA registeredBuyers’ group openShilpa Rathna
by Shilpa High Rise
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 866 – 1,357 sq ft
- Jan 2027
110 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Shilpa Rathna
Bandapura, Old Madras RoadUnder constructionRERA registeredBuyers’ group openKrishvi BVL Statura
by BVL Estate
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK, 4 BHK
- 830 – 4,277 sq ft
- Mar 2026 (extended)
RERA not updated since promised Mar 2026 · 352 homes · 3 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Krishvi BVL Statura
Gidadakonenahalli, near Magadi RoadUnder constructionRERA registeredBuyers’ group openSSVD Gokulam
by SSVD
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 3 BHK
- 327 – 1,210 sq ft
- Jul 2028
40 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for SSVD Gokulam