Skip to content
Log in

Galaxy One

1, 2 & 3 BHK apartments by Galaxy Developers · Seegehalli, Old Madras Road, Bengaluru

Seegehalli, Old Madras Road, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • RERA not updated: completion promised Dec 2025; no extension or completion filed
  • residential

by Galaxy Developers

Price: Price on request

Get brochure, floor plans & price

Brochure, floor plans and price list for Galaxy One

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

Galaxy One is a residential project by Galaxy Developers in Seegehalli, Bengaluru with 212 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2025. It is registered in 2 phases.

Facts collected on 14 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

Galaxy One buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks Galaxy Developers for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the Galaxy One buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 14 Oct 2026
Home types
1 BHK, 2 BHK, 3 BHK
Carpet area
330 – 1,075 sq ft
Towers
2
Floors
4
Total homes
212
Land
2.22 acres
Possession (RERA)
Dec 2025
Built (RERA update)
Not found in public records yet: construction progress

Galaxy One RERA number and registration details

RERA number
PRM/KA/RERA/1251/446/PR/181122/002140
Registered on
22 Nov 2018
Promised completion
31 Dec 2025
Extended to
No extension recorded
RERA status
New launch
Homes booked
Not found in public records yet: homes booked
Price
Not found in public records yet: price
Project type
Residential

2 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.

Phases and RERA numbers

PhaseRERA numberPromised completionHomesStatusSource
Main registrationPRM/KA/RERA/1251/446/PR/181122/0021401 Dec 201920New launchSource (rera.karnataka.gov.in) (opens in a new tab)
Phase-2PRM/KA/RERA/1251/446/PR/090322/00474431 Dec 2025192CompletedSource (rera.karnataka.gov.in) (opens in a new tab)

Towers and blocks (RERA filing)

TowerPhaseFloorsBasementsHomes
block AMain registration3020
Galaxy One Phase-2Phase-24096

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

Galaxy One is a residential project by Galaxy Developers in Bengaluru East with 212 homes across 2 phases. The main phase of 20 homes was registered to complete by 1 December 2019, while phase 2 of 192 homes is registered to complete by 31 December 2025.

Written by AI from the RERA record above on 5 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
Not found in public records yet: open space
Water and power
Water source filed with RERA: BoreWell,BWSSB
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA) · Main registration
UNITED BANK OF INDIA, Bhuvaneswari nagar
Escrow bank (RERA) · Phase-2
Union Bank of India, BHUWANESHWARI NAGAR

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

  • Electricity
  • CCTV Surveillance
  • Power Backup
  • Water and Sanitation

Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Galaxy One location and address

Address
Syno : 45/1A& 43/6 , seegehalli, kr puram Bangalore
Village (RERA)
Seegehalli
Locality
Old Madras RoadAlso known as OMR, Old Madras Road
PIN code
560066
City
Bengaluru
State
Karnataka
Coordinates
13.01982, 77.71938

Distances to landmarks

Not found in public records yet: landmarks

About Old Madras Road

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)4.1 kmapprox. 17 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)11.23 kmapprox. 45 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)11.46 kmapprox. 46 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)16.88 kmapprox. 68 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)19.82 kmapprox. 80 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)20.18 kmapprox. 82 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 27Schools and colleges17 schools, 9 colleges, 1 kindergartens
  • 15Hospitals and clinics6 hospitals, 9 clinics

Nearest schools and colleges

  • Blossom International School · 0.41 km
  • SJES College · 0.73 km
  • Princeton Public School · 1.02 km

Nearest hospitals and clinics

  • Seegehalli Government Hospital · 0.46 km
  • Sathya Sai Lake Side Ortho Hospital · 0.74 km
  • Sri Manjunatha Clinic · 1.4 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Garudacharpalya (ಗರುಡಾಚಾರ್ ಪಾಳ್ಯ)Open now — nearest operating metro station3.39 km
  • Hoodi Nearest railway station2.66 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Yellamallappa Chetty Lake, 273 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Galaxy One home types and carpet areas

Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.

Get brochure, floor plans & price

Brochure, floor plans and price list for Galaxy One

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Home typeCarpet areaHomes
1 BHK330 – 449 sq ft4
1 BHK flats420 sq ft4
2 BHK675 – 848 sq ft80
2 BHK flats747 sq ft76
3 BHK880 – 1,075 sq ft32
3 BHK flats957 sq ft16

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Galaxy One possession date and construction status

Not found in public records yet: construction progress

Timeline

  1. 1 May 2018Main registration: Project start date given to RERA
  2. 22 Nov 2018Main registration: Registered with Karnataka RERA
  3. 1 Dec 2019Main registration: Completion date given at registration
  4. 25 Oct 2021Phase-2: Project start date given to RERA
  5. 9 Mar 2022Phase-2: Registered with Karnataka RERA
  6. 14 Oct 2023Phase-2: Promoter applied to RERA for completion
  7. 31 Dec 2025Phase-2: Completion date given at registration

Approvals and documents checklist

ApprovalAuthoritySource
Building plan (Main registration)BBMP - Bruhat Bengaluru Mahanagara PalikeSource (rera.karnataka.gov.in) (opens in a new tab)
Building plan (Phase-2)BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP./AD.COM./MDP/030420-21 · dated 2020-10-20Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (Phase-2)Deputy Commissioner · No. ALN(E)S.R(K.H.)220/11-12 & · dated 2012-03-20Source (rera.karnataka.gov.in) (opens in a new tab)
Electricity Permission Letter (Phase-2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA (Phase-2)

As on 4 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP./AD.COM./MDP/030420-21 · dated 20 Oct 2020
  • Commencement certificate · Permission to start buildingNot on RERA yet
  • Environment clearance · SEIAA KarnatakaNot on RERA yet
  • Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
  • Pollution board consent · KSPCBNot on RERA yet
  • Water and sewerage · BWSSBNot on RERA yet
  • Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Height clearance · Airports Authority of IndiaNot on RERA yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet

From the documents the promoter uploaded to Karnataka RERA, collected 4 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Galaxy One RERA complaints

No complaints listed on Karnataka RERA for these registrations as on Source (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About Galaxy Developers

Promoter type
Partnership Firm
Projects on this site
1
RERA complaints against promoter
0
Company number (CIN)
Not found in public records yet: CIN

From Karnataka RERA, as collected so far (14 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

Galaxy Developers’s RERA record

Galaxy Developers delivery record

As on 14 Oct 2026
  • 1Projects in Bengaluru on RERA2 approved registrations under Galaxy Developers in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
  • 212Homes registeredAs stated in each registrations.
  • 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
  • 0Complaints per 1,000 homes0 complaints ÷ 212 homes in its 2 registrations on Karnataka RERA in Bengaluru.
  • 1Completion filed on RERARegistrations where the promoter applied to RERA for completion; 1 with an occupancy certificate on RERA.
  • 1 of 1Filed by the date given at registrationMedian gap 0 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.

Completion filed on RERA

ProjectDate at registrationCompletion filedGap
Galaxy One Phase-2OC on RERA31 Dec 202514 Oct 2023By the date

Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since May 2018

As on 14 Oct 2026
  1. 14 Oct 2023Phase-2: Promoter applied to RERA for completion (occupancy certificate on RERA) Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 9 Mar 2022Phase-2: Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/090322/004744); completion date 31 Dec 2025 Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 25 Oct 2021Phase-2: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 20 Oct 2020Phase-2: Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP./AD.COM./MDP/030420-21) Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 22 Nov 2018Main registration: Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/181122/002140); completion date 1 Dec 2019 Source (rera.karnataka.gov.in) (opens in a new tab)
  6. 1 May 2018Main registration: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

How we calculate this

Galaxy One FAQs

What types of homes are available in Galaxy One?

Phase 1 has 3 BHK (16 homes) and 2 BHK (4 homes) units. Phase 2 offers 3 BHK flats, 2 BHK flats, 1 BHK flats, 3 BHK, 2 BHK, and 1 BHK units.

What is the carpet area range for homes in Galaxy One?

Phase 1 has 3 BHK from 880 to 963 sq ft and 2 BHK from 740 to 768 sq ft. Phase 2 has 3 BHK flats at 957 sq ft, 2 BHK flats at 747 sq ft, 1 BHK flats at 420 sq ft, plus additional unit types ranging from 330 to 1,075 sq ft.

When will Galaxy One be completed?

Phase 1 is registered for completion by 1 December 2019. Phase 2 is registered for completion by 31 December 2025.

How many homes are in Galaxy One?

The project has 212 homes total: 20 homes in phase 1 and 192 homes in phase 2.

What are the RERA registration numbers for Galaxy One?

Phase 1 is registered as PRM/KA/RERA/1251/446/PR/181122/002140. Phase 2 is registered as PRM/KA/RERA/1251/446/PR/090322/004744.

Where is Galaxy One located?

Galaxy One is located in Bengaluru East taluk, Bengaluru Urban district. The specific address or PIN code is not in the RERA record.

How many towers does Galaxy One have?

Phase 1 has 1 tower with up to 3 floors. Phase 2 has 1 tower with up to 4 floors.

Are there any RERA complaints against Galaxy One?

No RERA complaints have been filed on Galaxy One as per the Karnataka RERA record.

What is the land area of Galaxy One?

Phase 1 covers 2,756 sq m of land. Phase 2 covers 6,241 sq m of land.

What is Galaxy Developers' track record?

Galaxy Developers is registered as a Partnership Firm and has no RERA complaints against it across all projects. Galaxy One is the only project by this builder in the Karnataka RERA records.

Written by AI from the RERA record above on 5 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Galaxy One

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from Galaxy Developers? Review the builder.

Reviews of Galaxy Developers by verified buyers

No verified reviews of Galaxy Developers yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
Sree Adithya Lotus ParkSree Adithya Developers0.4 km141Sep 202698%0Not collected
Krishna LakefrontSree Krishna Constructions0.4 km73Dec 2026100%0Not collected
Sobha Lake GardensSobha Limited0.5 km1,194Dec 2025extended—13from ₹1.02 Cr
Brigade LakecrestBrigade Enterprises Ltd0.5 km604Mar 203020%0from ₹1.6 Crabout ₹16,800/sq ft carpet
OhanaA One Shelters Private Limited0.6 km336Jun 2030extended—0Not collected
Sree Adithya PrideSree Adithya Developers0.8 km120Jun 202771%0Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 14 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/446/PR/181122/002140, PRM/KA/RERA/1251/446/PR/090322/004744.

  • RERA record last checked: 14 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 9 Mar 2022

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error

More new projects in Old Madras Road