Sree Adithya Lotus Park
2 & 3 BHK apartments by Sree Adithya Developers · Seegehalli, Old Madras Road, Bengaluru
Seegehalli, Old Madras Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- RERA not updated: completion promised Sep 2026; no extension or completion filed
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Sree Adithya Lotus Park at a glance
- Possession (RERA)Sep 2026 Date passedKarnataka RERA
- Construction98% built · on pace for Jul 2026RERA filing to 30 Jun 2026; estimate from average pace
- Homes booked77 of 141 (55%)RERA update · as on 30 Jun 2026
- RERA complaints (project)None listedKarnataka RERA · as on 4 Oct 2026
- Approvals filed5 of 9 on RERAKarnataka RERA uploads · 4 Oct 2026
- Nearest metroGarudacharpalya · 3.04 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 83 min at peak20.49 km straight line · estimate
- Nearest lakeSeegehalli Lake · 333 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Sree Adithya Lotus Park is a residential project by Sree Adithya Developers in Seegehalli, Bengaluru with 141 homes, registered with Karnataka RERA. The completion date on RERA is 30 Sep 2026.
Facts collected on 4 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Sree Adithya Lotus Park buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Sree Adithya Developers for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Sree Adithya Lotus Park buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK
- Carpet area
- 724 – 1,287 sq ft
- Towers
- 2
- Floors
- 3
- Total homes
- 141
- Land
- 2 acres
- Possession (RERA)
- Sep 2026
- Built (RERA update)
- 98%
Sree Adithya Lotus Park RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/446/PR/300124/006599
- Registered on
- 30 Jan 2024
- Promised completion
- 30 Sep 2026
- Extended to
- No extension recorded
- RERA status
- Under construction
- Homes booked
- 77 of 141 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| SREE ADITHYA LOTUS PARK BLOCK - A | 3 | 0 | 61 |
| SREE ADITHYA LOTUS PARK BLOCK - B | 3 | 0 | 80 |
A dash (—) means the filing did not state that value.
Summary in plain English
Sree Adithya Lotus Park is a residential project by Sree Adithya Developers in Seegehalli, Bengaluru East, with 141 homes across 2 towers. The project includes 2 BHK and 3 BHK flats and is registered with RERA to be completed by 30 September 2026.
Written by AI from the RERA record above on 5 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 50% of land
- Water and power
- Water source filed with RERA: BoreWell,BWSSB
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- STATE BANK OF INDIA, Banaswadi
- Building plan (RERA)
- BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDNORTH/0029/22-23 · dated 1 Jan 2024
- Project cost declared to RERA
- ₹44.9 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- Community Hall
- Indoor Sports facility
- Swimming Pool
- Gym
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Sree Adithya Lotus Park location and address
- Address
- Old Sy No.18/2, New Converted Sy.No.18/9 and New Converted Sy.No.18/10, , Common BBMP Katha No.1122/18/9 & 18/10/219, Situated at Seegehalli Village, KR Puram Hobli, Bangalore East Taluk , Bengaluru East , Bengaluru Urban, Karnataka - 560049
- Village (RERA)
- Seegehalli
- Locality
- Old Madras RoadAlso known as OMR, Old Madras Road
- PIN code
- 560049
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.01692, 77.71802
Distances to landmarks
Not found in public records yet: landmarksAbout Old Madras Road
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 3.9 km | approx. 16 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 11.1 km | approx. 45 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 11.19 km | approx. 45 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 16.65 km | approx. 67 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 19.46 km | approx. 79 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 20.49 km | approx. 83 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 32Schools and colleges21 schools, 10 colleges, 1 kindergartens
- 19Hospitals and clinics6 hospitals, 13 clinics
Nearest schools and colleges
- Blossom International School · 0.44 km
- Mar Thoma School · 0.88 km
- SEA College · 0.89 km
Nearest hospitals and clinics
- Seegehalli Government Hospital · 0.12 km
- Sathya Sai Lake Side Ortho Hospital · 0.77 km
- Sri Manjunatha Clinic · 1.07 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Garudacharpalya (ಗರುಡಾಚಾರ್ ಪಾಳ್ಯ)Open now — nearest operating metro station3.04 km
- Hoodi Nearest railway station2.34 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Seegehalli Lake, 333 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Seegehalli Lake on OpenStreetMap (opens in a new tab) (ಸೀಗೆಹಳ್ಳಿ ಕೆರೆ)333 m
- Yellamallappa Chetty Lake on OpenStreetMap (opens in a new tab) (ಯೆಲ್ಲಮಲ್ಲಪ್ಪ ಚೆಟ್ಟಿ ಕೆರೆ)615 m
- Basavanapura Kere on OpenStreetMap (opens in a new tab) (ಬಸವನಪುರ ಕೆರೆ)773 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Sree Adithya Lotus Park home types and carpet areas
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved building plan2 files

Approved Building/Plotting PlanFull PDF on RERA 
Area Development Plan Of Project AreaFull PDF on RERA
Approved layout plan3 files

Approved Layout PlanFull PDF on RERA 
Existing Layout PlanFull PDF on RERA 
Village Map DemarcationFiled 29 Jan 2024 · Full PDF on RERA
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 724 – 865 sq ft | 93 |
| 2 BHK flats | 779 sq ft | 93 |
| 3 BHK | 953 – 1,287 sq ft | 48 |
| 3 BHK flats | 1,097 sq ft | 48 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Sree Adithya Lotus Park possession date and construction status
Promoter’s quarterly update to RERA for Q1 2026-27, submitted 2026-07-15.
By tower (Q1 2026-27)
Units sold and unsold, from RERA (Q1 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2 BHK | 93 | 47 | 46 |
| 3 BHK | 48 | 30 | 18 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 1 Jan 2024Project start date given to RERA
- 30 Jan 2024Registered with Karnataka RERA
- 30 Sep 2026Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Jul 2026 — about 2 months before the completion date on RERA (30 Sep 2026).
- Filed on RERA
- Average pace since start
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 98% | 77 of 141 |
| Q4 2025-26to 31 Mar 2026 | 14 Apr 2026 | 100% | 77 of 141 |
| Q3 2025-26to 31 Dec 2025 | 12 Jan 2026 | 98% | 72 of 141 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 98% ÷ 29.9 months (1 Jan 2024 to 30 Jun 2026) = 3.3% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Jun 2026 + 2 ÷ 3.3 = 0.6 months → Jul 2026. This is an estimate, not a date from the builder or RERA.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q1 2026-27, submitted 2026-07-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
12 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan | BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDNORTH/0029/22-23 · dated 2024-01-01 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (2 orders) | Deputy Commissioner Bangalore Urban District · No. ALN (KRH)SR/55/2021-22 and 1 more · dated 2022-03-04 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDNORTH/0029/22-23 · dated 1 Jan 2024
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 4 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Sree Adithya Lotus Park RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Sree Adithya Developers
- Promoter type
- Partnership Firm
- Projects on this site
- 2
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (4 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Sree Adithya Developers’s RERA recordSree Adithya Developers delivery record
- 2Projects in Bengaluru on RERA2 approved registrations under Sree Adithya Developers in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 261Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 261 homes in its 2 registrations on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Jan 2024
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 98% built, 77 of 141 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Apr 2026Quarterly update filed for Q4 2025-26: 100% built, 77 of 141 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Jan 2026Quarterly update filed for Q3 2025-26: 98% built, 72 of 141 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 Jan 2024Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/300124/006599); completion date 30 Sep 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Jan 2024Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/Addl.Dir/JDNORTH/0029/22-23) Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Jan 2024Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Sree Adithya Lotus Park FAQs
What is Sree Adithya Lotus Park?
It is a residential project by Sree Adithya Developers in Seegehalli, Bengaluru East, with 141 homes in 2 towers of up to 3 floors each.
When will Sree Adithya Lotus Park be completed?
The project is registered with RERA for completion on 30 September 2026.
What home types are available in Sree Adithya Lotus Park?
The project has 2 BHK flats with carpet area from 724 to 865 sq ft (93 homes) and 3 BHK flats with carpet area from 953 to 1,287 sq ft (48 homes).
How many homes are in Sree Adithya Lotus Park?
There are 141 homes in total: 93 two-bedroom and 48 three-bedroom units.
What is the RERA registration number for Sree Adithya Lotus Park?
The RERA registration number is PRM/KA/RERA/1251/446/PR/300124/006599, registered on 30 January 2024.
Where is Sree Adithya Lotus Park located?
The project is in Seegehalli, Bengaluru East taluk, with PIN code 560049.
What is the construction progress of Sree Adithya Lotus Park?
As of Q1 2026-27 (30 June 2026), the project is 98% complete with 77 homes booked out of 141.
Are there any RERA complaints against Sree Adithya Lotus Park?
There are no RERA complaints on this project.
What bank holds the escrow account for Sree Adithya Lotus Park?
The escrow bank is State Bank of India.
How many other projects does Sree Adithya Developers have?
Sree Adithya Developers has 5 projects in our Bengaluru RERA records.
Written by AI from the RERA record above on 5 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Sree Adithya Lotus Park
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Sree Adithya Developers? Review the builder.
Reviews of Sree Adithya Developers by verified buyers
No verified reviews of Sree Adithya Developers yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Galaxy OneGalaxy Developers | 0.4 km | 212 | Dec 2025 | — | 0 | Not collected |
| Krishna LakefrontSree Krishna Constructions | 0.6 km | 73 | Dec 2026 | 100% | 0 | Not collected |
| Sree Adithya PrideSree Adithya Developers | 0.6 km | 120 | Jun 2027 | 71% | 0 | Not collected |
| Sobha Lake GardensSobha Limited | 0.7 km | 1,194 | Dec 2025extended | — | 13 | from ₹1.02 Cr |
| OhanaA One Shelters Private Limited | 0.7 km | 336 | Jun 2030extended | — | 0 | Not collected |
| Brigade LakecrestBrigade Enterprises Ltd | 0.8 km | 604 | Mar 2030 | 20% | 0 | from ₹1.6 Crabout ₹16,800/sq ft carpet |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 4 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/300124/006599.
- RERA record last checked: 4 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 15 Jul 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Old Madras Road
- Seegehalli, Old Madras Road© Esri, Maxar, Earthstar GeographicsUnder constructionRERA registeredBuyers’ group open
Galaxy One
by Galaxy
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 3 BHK
- 330 – 1,075 sq ft
- Dec 2025
RERA not updated since promised Dec 2025 · 2 phases on RERA · 212 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Galaxy One
Seegehalli, Old Madras RoadUnder constructionRERA registeredBuyers’ group openKrishna Lakefront
by Sree Krishna Constructions
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 762 – 1,116 sq ft
- Dec 2026
73 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Krishna Lakefront
Seegehalli, Old Madras RoadUnder constructionRERA registeredBuyers’ group openSree Adithya Pride
by Sree Adithya
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 617 – 1,838 sq ft
- Jun 2027
120 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Sree Adithya Pride