Ivory at Brigade Orchards
1, 2 & 3 BHK apartments by Brigade Enterprises Ltd · Devanahalli, Bengaluru
Devanahalli, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
by Brigade Enterprises Ltd · registered with RERA by BCV Developers Pvt Ltd
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Ivory at Brigade Orchards at a glance
- Possession (RERA)Dec 2026 ExtendedWas Dec 2027 · Karnataka RERA
- Construction88% built · on pace for Feb 2027RERA filing to 30 Sep 2026 (Phase 2); estimate from average pace
- RERA complaints (project)2 complaintsKarnataka RERA · as on 21 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 21 Oct 2026
- Nearest metroKIAL Terminals · 3.16 km (under construction)Open now: Krishnarajapura, 25.5 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 14 min at peak3.35 km straight line · estimate
- Nearest lakeBettakote Lake · 807 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Ivory at Brigade Orchards is a residential project by Brigade Enterprises Ltd in Devanahalli, Bengaluru with 605 homes, registered with Karnataka RERA. The completion date on RERA is 30 Dec 2026. It is registered in 2 phases.
Facts collected on 21 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Ivory at Brigade Orchards buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Brigade Enterprises Ltd for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Ivory at Brigade Orchards buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- Studio, 1 BHK, 2 BHK, 3 BHK
- Carpet area
- 301 – 893 sq ft
- Towers
- 6
- Floors
- 14
- Total homes
- 605
- Land
- 6.73 acres
- Possession (extended)
- Dec 2026
- Built (RERA update)
- Not found in public records yet: construction progress
Ivory at Brigade Orchards RERA number and registration details
- RERA number
- PRM/KA/RERA/1250/303/PR/220104/004626
- Registered on
- 4 Jan 2022
- Promised completion
- 31 Dec 2027
- Extended to
- 30 Dec 2026
- RERA status
- New launch
- Homes booked
- Not found in public records yet: homes booked
- Price
- Not found in public records yet: price
- Project type
- Residential
2 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.
Phases and RERA numbers
| Phase | RERA number | Promised completion | Homes | Status | Source |
|---|---|---|---|---|---|
| Phase 1 | PRM/KA/RERA/1250/303/PR/220104/004626 | 31 Dec 2025Extended to 30 Dec 2026 | 118 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase 2 | PRM/KA/RERA/1250/303/PR/151223/006485 | 31 Dec 2027 | 487 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
Towers and blocks (RERA filing)
| Tower | Phase | Floors | Basements | Homes |
|---|---|---|---|---|
| Tower G | Phase 1 | 14 | 1 | 144 |
| Tower H | Phase 1 | 14 | 1 | 170 |
| Tower I | Phase 1 | 14 | 1 | 143 |
| J | Phase 2 | 14 | 1 | 143 |
| K | Phase 2 | 14 | 1 | 170 |
| L | Phase 2 | 14 | 1 | 174 |
A dash (—) means the filing did not state that value.
Summary in plain English
Ivory at Brigade Orchards is a residential project by BCV Developers Pvt Ltd in Devanahalli, Bengaluru Rural. The project has 605 homes across 2 phases with 6 towers. Phase 1 is scheduled for completion on 31 December 2026, and Phase 2 on 31 December 2027.
Written by AI from the RERA record above on 21 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: Others
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA) · Phase 1
- Axis Bank, Malleshwaram
- Escrow bank (RERA) · Phase 2
- Axis Bank, Malleshwaram
Amenities
- Electricity
- Club House
- Community Hall
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Ivory at Brigade Orchards location and address
- Address
- Sy No. 41(P), Devanahalli Village, Kasaba Hobli, Bangalore Rural, Devanahalli Taluk,
- Village (RERA)
- Devanahalli
- Locality
- Devanahalli
- PIN code
- 562110
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.22497, 77.72273
Distances to landmarks
Not found in public records yet: landmarksAbout Devanahalli
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 3.35 km | approx. 14 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 22.6 km | approx. 92 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 26.44 km | approx. 107 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 32.07 km | approx. 130 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 33.8 km | approx. 137 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 42.2 km | approx. 171 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 4Schools and colleges3 schools, 1 colleges, 0 kindergartens
- 0Hospitals and clinics0 hospitals, 0 clinics
Nearest schools and colleges
- Brigade Orchard School · 0.73 km
- Akash Institute of Medical Sciences · 1.72 km
- Akash International School · 1.79 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- KIAL Terminals (ಕೆಐಎಬಿ ವಿಮಾನ ನಿಲ್ದಾಣ ಟರ್ಮಿನಲ್ಸ್)Blue Line metro, under construction3.16 km
- Airport City (ವಿಮಾನ ನಿಲ್ದಾಣ ನಗರ)Blue Line metro, under construction4.87 km
- Doddajala (ದೊಡ್ಡಜಾಲ)Blue Line metro, under construction9.38 km
- Krishnarajapura (ಕೃಷ್ಣರಾಜಪುರ (ಕೆ.ಆರ್.ಪುರ))Open now — nearest operating metro station25.5 km
- Devanahalli (ದೇವನಹಳ್ಳಿ)Nearest railway station3.13 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Bettakote Lake, 807 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Bettakote Lake on OpenStreetMap (opens in a new tab) (ಬೆಟ್ಟಕೋಟೆ ಕೆರೆ)807 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,160 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Ivory at Brigade Orchards floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure5 pages

Phase 2: BrochureFull PDF on RERA 



Floor plans9 files

Phase 2: Ivory at Brigade Orchards - Typical Floor Plan - 3rd to 11th Floor.pdfFull PDF on RERA 
Phase 2: Ivory at Brigade Orchards - 12th Floor Plan.pdfFull PDF on RERA 
Phase 2: Ivory at Brigade Orchards - 13th Floor Plan.pdfFull PDF on RERA 
Phase 2: Ivory at Brigade Orchards - 14th Floor Plan.pdfFull PDF on RERA 
Phase 2: Ivory at Brigade Orchards - 1st Floor Plan.pdfFull PDF on RERA 
Phase 2: Ivory at Brigade Orchards - 2nd Floor Plan.pdfFull PDF on RERA 
Phase 2: Ivory at Brigade Orchards - Elevation Floor Plan.pdfFull PDF on RERA 
Phase 2: Ivory at Brigade Orchards - Ground Floor Plan.pdfFull PDF on RERA 
Phase 2: Ivory at Brigade Orchards - Terrace Floor Plan.pdfFull PDF on RERA
Approved layout plan3 files

Phase 2: Approved Layout PlanFull PDF on RERA 
Phase 2: Existing Layout PlanFull PDF on RERA 
Phase 2: Ivory at Brigade Orchards - Area DemarcationFiled 12 Dec 2023 · Full PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 1 BHK | 334 – 457 sq ft | 154 |
| 1 BHK + 1 toilet | 334 – 366 sq ft | 44 |
| 1 BHK + 1 toilet + study | 452 – 463 sq ft | 96 |
| 2 BHK | 549 – 629 sq ft | 144 |
| 2 BHK + 2 toilet | 549 – 624 sq ft | 142 |
| 3 BHK | 743 – 888 sq ft | 301 |
| 3 BHK + 2 toilet | 743 sq ft | 129 |
| 3 BHK + 3 toilet | 861 – 893 sq ft | 73 |
| Na | 306 sq ft | 3 |
| Studio unit | 301 sq ft | 6 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Ivory at Brigade Orchards possession date and construction status
Timeline
- 6 Sep 2021Phase 1: Project start date given to RERA
- 4 Jan 2022Phase 1: Registered with Karnataka RERA
- 5 Dec 2023Phase 2: Project start date given to RERA
- 15 Dec 2023Phase 2: Registered with Karnataka RERA
- 31 Dec 2025Phase 1: Completion date given at registration
- 30 Dec 2026Phase 1: Section 6 Extension: completion date moved to this date
- 31 Dec 2027Phase 2: Completion date given at registration
Construction pace from RERA quarterly filings (Phase 2)
At the average pace so far, construction would reach 100% around Feb 2027 — about 10 months before the completion date on RERA (31 Dec 2027).
At the pace between the 4 quarterly filings we have (68% → 88% in 9 months), it would be around Mar 2027 — about 10 months before the RERA date.
This project has 2 RERA registrations; the chart uses Phase 2, the one with the most quarterly filings.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 88% | 487 of 487 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 83% | 487 of 487 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 76% | 487 of 487 |
| Q3 2025-26to 31 Dec 2025 | 14 Jan 2026 | 68% | 486 of 487 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 88% ÷ 33.8 months (5 Dec 2023 to 30 Sep 2026) = 2.6% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 12 ÷ 2.6 = 4.6 months → Feb 2027. This is an estimate, not a date from the builder or RERA.
Pace between filings = (88% − 68%) ÷ 9 months = 2.2% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
17 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan (Phase 1) | Local Planing Authority | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Building plan (Phase 2) | Local Planing Authority · No. STRRPA/TP/CC/77/2021-22 · dated 2021-08-26 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (Phase 2) | Additional Deputy Commissioner, Bangalore Rural · No. 1) ALN (D) SR: 9/2007-08, 2) ALN (D) SR: 10/2007-08 & 3) ALN (D) SR: 242/2006-07 · dated 2007-07-06 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA (Phase 2)
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — Local Planing Authority · No. STRRPA/TP/CC/77/2021-22 · dated 26 Aug 2021
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 21 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.
Ivory at Brigade Orchards RERA complaints and orders
2 complaints as on Source (rera.karnataka.gov.in) (opens in a new tab)
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| 00832/2025 | 12 Jun 2025 | Refund of the amount paid along with reasonable interest | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00319/2024 | 26 Mar 2024 | Builder not Signing the Agreement To Sell without giving POA and Under taking letter which is clubbed together with ATS | Posted for orders | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Brigade Enterprises Ltd
- Promoter type
- Company
- Projects on this site
- 28
- RERA complaints against promoter
- 44
- Company number (CIN)
- U45201KA2008PTC045861
From Karnataka RERA, as collected so far (21 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Brigade Enterprises Ltd’s RERA recordBrigade Enterprises Ltd delivery record
- 28Projects in Bengaluru on RERA32 approved registrations under Brigade Enterprises Ltd in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 15,990Homes and plots registeredAs stated in 31 of the 32 registrations.
- 44RERA complaints5 open, 39 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 2.8Complaints per 1,000 homes and plots44 complaints ÷ 15,990 homes and plots in its 32 registrations on Karnataka RERA in Bengaluru.
- 5Completion filed on RERARegistrations where the promoter applied to RERA for completion; 2 with an occupancy certificate on RERA.
- 0 of 5Filed by the date given at registrationMedian gap 9.4 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
What the complaints are about
44 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| Brigade Northridge NeoOC on RERA | 31 Mar 2022extended to 30 Sep 2022 | 20 May 2026 | 50 months after |
| Brigade BricklaneOC on RERA | 31 Dec 2021extended to 31 Mar 2023 | 16 May 2026 | 53 months after |
| Brigade Oasis - Phase 1 | 30 Jun 2025extended to 30 Jun 2026 | 13 Apr 2026 | 9 months after |
| Brigade Oasis - Phase 2 | 30 Jun 2025extended to 30 Jun 2026 | 13 Apr 2026 | 9 months after |
| Brigade Oasis - Phase 3 | 30 Jun 2025extended to 30 Jun 2026 | 13 Apr 2026 | 9 months after |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Aug 2021
- 30 Dec 2026Phase 1: Completion date extended to 30 Dec 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Oct 2026Phase 2: Quarterly update filed for Q2 2026-27: 88% built, 487 of 487 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Phase 1: Quarterly update filed for Q1 2026-27: 100% built, 454 of 457 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Phase 2: Quarterly update filed for Q1 2026-27: 83% built, 487 of 487 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Phase 1: Quarterly update filed for Q4 2025-26: 100% built, 454 of 457 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Phase 2: Quarterly update filed for Q4 2025-26: 76% built, 487 of 487 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jan 2026Phase 1: Quarterly update filed for Q3 2025-26: 100% built, 457 of 457 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jan 2026Phase 2: Quarterly update filed for Q3 2025-26: 68% built, 486 of 487 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Jun 2025Complaint 00832/2025 filed with RERA: “Refund of the amount paid along with reasonable interest” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 26 Mar 2024Complaint 00319/2024 filed with RERA: “Builder not Signing the Agreement To Sell without giving POA and Under taking letter which is clubbed together with ATS” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Dec 2023Phase 2: Registered with Karnataka RERA (PRM/KA/RERA/1250/303/PR/151223/006485); completion date 31 Dec 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 5 Dec 2023Phase 2: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 4 Jan 2022Phase 1: Registered with Karnataka RERA (PRM/KA/RERA/1250/303/PR/220104/004626); completion date 31 Dec 2025 Source (rera.karnataka.gov.in) (opens in a new tab)
- 6 Sep 2021Phase 1: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 26 Aug 2021Phase 2: Building plan approved by Local Planing Authority (No. STRRPA/TP/CC/77/2021-22) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Ivory at Brigade Orchards FAQs
What is the RERA registration number for Ivory at Brigade Orchards?
Phase 1 is registered as PRM/KA/RERA/1250/303/PR/220104/004626 (registered on 4 January 2022) and Phase 2 is registered as PRM/KA/RERA/1250/303/PR/151223/006485 (registered on 15 December 2023).
How many homes are in Ivory at Brigade Orchards?
The project has 605 homes total: 118 homes in Phase 1 and 487 homes in Phase 2.
What home types are available in Ivory at Brigade Orchards?
Phase 1 offers studio units (301 sq ft), 1 BHK (344-452 sq ft), 2 BHK (549-629 sq ft), and 3 BHK (743-881 sq ft). Phase 2 offers similar types with more options, including 1 BHK (334-463 sq ft), 2 BHK (549-629 sq ft), 3 BHK (743-888 sq ft), and studio units (301 sq ft).
When will Phase 1 of Ivory at Brigade Orchards be completed?
Phase 1 is scheduled for completion on 31 December 2026, with a Section 6 Extension noted on RERA.
When will Phase 2 of Ivory at Brigade Orchards be completed?
Phase 2 is scheduled for completion on 31 December 2027.
What is the construction progress of Ivory at Brigade Orchards?
As of Q1 2026-27 (ended 30 June 2026), Phase 1 is 100% complete. As of Q2 2026-27 (ended 30 September 2026), Phase 2 is 88% complete.
How many homes have been booked in Ivory at Brigade Orchards?
In Phase 1, 454 homes have been booked as of Q1 2026-27. In Phase 2, 487 homes have been booked as of Q2 2026-27.
What are the RERA complaints against Ivory at Brigade Orchards?
There are 2 RERA complaints on this project: 1 on Phase 1 registration and 1 on Phase 2 registration.
Where is Ivory at Brigade Orchards located?
The project is located in Devanahalli, Devanahalli taluk, Bengaluru Rural district, PIN code 560001.
What is the builder's complaint record?
BCV Developers Pvt Ltd has 15 RERA complaints across all its projects and has 9 projects recorded on the Karnataka RERA register.
Written by AI from the RERA record above on 21 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Ivory at Brigade Orchards
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Brigade Enterprises Ltd? Review the builder.
Reviews of Brigade Enterprises Ltd by verified buyers
No verified reviews of Brigade Enterprises Ltd yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| MVN Aero OneMF Farmlands Private Limited | 0.4 km | 213 | Dec 2026 | — | 0 | Not collected |
| Ebony at Brigade OrchardsBrigade Enterprises Ltd | 0.5 km | 232 | Mar 2029 | 42% | 0 | Not collected |
| Fairmont at Brigade OrchardsBrigade Enterprises Ltd | 0.6 km | 92 | Dec 2027 | 100% | 0 | Not collected |
| Laurel & Maple at Brigade OrchardsBrigade Enterprises Ltd | 1.4 km | 311 | Mar 2030 | 15% | 0 | Not collected |
| MVN Aero One T5 & T6MF Farmlands Private Limited | 1.7 km | 137 | Jul 2027 | 95% | 0 | Not collected |
| Geetanjali Vatika AerocityRatngarbha Ventures Private Limited | 1.8 km | 40 | Oct 2029 | — | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 21 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1250/303/PR/220104/004626, PRM/KA/RERA/1250/303/PR/151223/006485.
- RERA record last checked: 21 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 21 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Devanahalli
Rayasandra, DevanahalliUnder constructionRERA registeredBuyers’ group openMVN Aero One
by MF Farmlands
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 3 BHK
- 469 – 1,245 sq ft
- Dec 2026
2 phases on RERA · 213 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for MVN Aero One
Rayasandra, DevanahalliUnder constructionRERA registeredBuyers’ group openEbony at Brigade Orchards
by Brigade Enterprises
Price: Price on requestGet brochure & price →
- 3 BHK, 4 BHK
- 1,055 – 1,518 sq ft
- Mar 2029
232 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Ebony at Brigade Orchards
Rayasandra, DevanahalliUnder constructionRERA registeredBuyers’ group openFairmont at Brigade Orchards
by Brigade Enterprises
Price: Price on requestGet brochure & price →
- 3 BHK, 4 BHK
- 1,243 – 1,453 sq ft
- Dec 2027
92 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Fairmont at Brigade Orchards