Skip to content
Log in

Ivory at Brigade Orchards

1, 2 & 3 BHK apartments by Brigade Enterprises Ltd · Devanahalli, Bengaluru

Devanahalli, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • residential

by Brigade Enterprises Ltd · registered with RERA by BCV Developers Pvt Ltd

Price: Price on request

Get brochure, floor plans & price

Brochure, floor plans and price list for Ivory at Brigade Orchards

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

Ivory at Brigade Orchards is a residential project by Brigade Enterprises Ltd in Devanahalli, Bengaluru with 605 homes, registered with Karnataka RERA. The completion date on RERA is 30 Dec 2026. It is registered in 2 phases.

Facts collected on 21 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

Ivory at Brigade Orchards buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks Brigade Enterprises Ltd for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the Ivory at Brigade Orchards buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 21 Oct 2026
Home types
Studio, 1 BHK, 2 BHK, 3 BHK
Carpet area
301 – 893 sq ft
Towers
6
Floors
14
Total homes
605
Land
6.73 acres
Possession (extended)
Dec 2026
Built (RERA update)
Not found in public records yet: construction progress

Ivory at Brigade Orchards RERA number and registration details

RERA number
PRM/KA/RERA/1250/303/PR/220104/004626
Registered on
4 Jan 2022
Promised completion
31 Dec 2027
Extended to
30 Dec 2026
RERA status
New launch
Homes booked
Not found in public records yet: homes booked
Price
Not found in public records yet: price
Project type
Residential

2 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.

Phases and RERA numbers

PhaseRERA numberPromised completionHomesStatusSource
Phase 1PRM/KA/RERA/1250/303/PR/220104/00462631 Dec 2025Extended to 30 Dec 2026118New launchSource (rera.karnataka.gov.in) (opens in a new tab)
Phase 2PRM/KA/RERA/1250/303/PR/151223/00648531 Dec 2027487New launchSource (rera.karnataka.gov.in) (opens in a new tab)

Towers and blocks (RERA filing)

TowerPhaseFloorsBasementsHomes
Tower GPhase 1141144
Tower HPhase 1141170
Tower IPhase 1141143
JPhase 2141143
KPhase 2141170
LPhase 2141174

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

Ivory at Brigade Orchards is a residential project by BCV Developers Pvt Ltd in Devanahalli, Bengaluru Rural. The project has 605 homes across 2 phases with 6 towers. Phase 1 is scheduled for completion on 31 December 2026, and Phase 2 on 31 December 2027.

Written by AI from the RERA record above on 21 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
Not found in public records yet: open space
Water and power
Water source filed with RERA: Others
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA) · Phase 1
Axis Bank, Malleshwaram
Escrow bank (RERA) · Phase 2
Axis Bank, Malleshwaram

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

  • Electricity
  • Club House
  • Community Hall
  • Outdoor Sports facility
  • Indoor Sports facility
  • Swimming Pool
  • Gym
  • Water and Sanitation

Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Ivory at Brigade Orchards location and address

Address
Sy No. 41(P), Devanahalli Village, Kasaba Hobli, Bangalore Rural, Devanahalli Taluk,
Village (RERA)
Devanahalli
Locality
Devanahalli
PIN code
562110
City
Bengaluru
State
Karnataka
Coordinates
13.22497, 77.72273

Distances to landmarks

Not found in public records yet: landmarks

About Devanahalli

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)3.35 kmapprox. 14 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)22.6 kmapprox. 92 min
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)26.44 kmapprox. 107 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)32.07 kmapprox. 130 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)33.8 kmapprox. 137 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)42.2 kmapprox. 171 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 4Schools and colleges3 schools, 1 colleges, 0 kindergartens
  • 0Hospitals and clinics0 hospitals, 0 clinics

Nearest schools and colleges

  • Brigade Orchard School · 0.73 km
  • Akash Institute of Medical Sciences · 1.72 km
  • Akash International School · 1.79 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • KIAL Terminals (ಕೆಐಎಬಿ ವಿಮಾನ ನಿಲ್ದಾಣ ಟರ್ಮಿನಲ್ಸ್)Blue Line metro, under construction3.16 km
  • Airport City (ವಿಮಾನ ನಿಲ್ದಾಣ ನಗರ)Blue Line metro, under construction4.87 km
  • Doddajala (ದೊಡ್ಡಜಾಲ)Blue Line metro, under construction9.38 km
  • Krishnarajapura (ಕೃಷ್ಣರಾಜಪುರ (ಕೆ.ಆರ್.ಪುರ))Open now — nearest operating metro station25.5 km
  • Devanahalli (ದೇವನಹಳ್ಳಿ)Nearest railway station3.13 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Bettakote Lake, 807 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Ivory at Brigade Orchards floor plans, brochure and elevations

Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.

Brochure5 pages

Floor plans9 files

Approved layout plan3 files

Home typeCarpet areaHomes
1 BHK334 – 457 sq ft154
1 BHK + 1 toilet334 – 366 sq ft44
1 BHK + 1 toilet + study452 – 463 sq ft96
2 BHK549 – 629 sq ft144
2 BHK + 2 toilet549 – 624 sq ft142
3 BHK743 – 888 sq ft301
3 BHK + 2 toilet743 sq ft129
3 BHK + 3 toilet861 – 893 sq ft73
Na306 sq ft3
Studio unit301 sq ft6

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Ivory at Brigade Orchards possession date and construction status

  • Phase 1100%

    as on · 454 of 118 homes booked

  • Phase 288%

    as on · 487 of 487 homes booked

Timeline

  1. 6 Sep 2021Phase 1: Project start date given to RERA
  2. 4 Jan 2022Phase 1: Registered with Karnataka RERA
  3. 5 Dec 2023Phase 2: Project start date given to RERA
  4. 15 Dec 2023Phase 2: Registered with Karnataka RERA
  5. 31 Dec 2025Phase 1: Completion date given at registration
  6. 30 Dec 2026Phase 1: Section 6 Extension: completion date moved to this date
  7. 31 Dec 2027Phase 2: Completion date given at registration

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Construction pace from RERA quarterly filings (Phase 2)

As on 15 Oct 2026

At the average pace so far, construction would reach 100% around Feb 2027 — about 10 months before the completion date on RERA (31 Dec 2027).

At the pace between the 4 quarterly filings we have (68% → 88% in 9 months), it would be around Mar 2027 — about 10 months before the RERA date.

This project has 2 RERA registrations; the chart uses Phase 2, the one with the most quarterly filings.

0%25%50%75%100%20242025202620272028RERA date68%76%83%88%
  • Filed on RERA
  • Average pace since start
  • Pace between filings (and 0% assumed at the start date)
  • RERA completion date

Quarterly filings

QuarterFiled onBuiltHomes booked
Q2 2026-27to 30 Sep 202615 Oct 202688%487 of 487
Q1 2026-27to 30 Jun 202615 Jul 202683%487 of 487
Q4 2025-26to 31 Mar 202615 Apr 202676%487 of 487
Q3 2025-26to 31 Dec 202514 Jan 202668%486 of 487
How we calculate

Average pace = % built ÷ months since the start date in the RERA record. Here: 88% ÷ 33.8 months (5 Dec 2023 to 30 Sep 2026) = 2.6% a month.

Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 12 ÷ 2.6 = 4.6 months → Feb 2027. This is an estimate, not a date from the builder or RERA.

Pace between filings = (88% − 68%) ÷ 9 months = 2.2% a month.

A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

Approvals and documents checklist

17 rows: approvals. Scroll inside the table to see them all.

ApprovalAuthoritySource
Building plan (Phase 1)Local Planing AuthoritySource (rera.karnataka.gov.in) (opens in a new tab)
Building plan (Phase 2)Local Planing Authority · No. STRRPA/TP/CC/77/2021-22 · dated 2021-08-26Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (Phase 2)Additional Deputy Commissioner, Bangalore Rural · No. 1) ALN (D) SR: 9/2007-08, 2) ALN (D) SR: 10/2007-08 & 3) ALN (D) SR: 242/2006-07 · dated 2007-07-06Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificate (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Electricity Permission Letter (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Water Permission Letter (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Layout Plan (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building/Plotting Plan (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Section Of Building/Infrastructure Plan of Plotting (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Change of Land Use (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Conversion Certificate under section 95 of the KLR Act 1964 (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricity (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Water (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Fire Force Department (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Airport Authority of India (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCB (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
SEIAA (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA (Phase 2)

As on 21 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — Local Planing Authority · No. STRRPA/TP/CC/77/2021-22 · dated 26 Aug 2021
  • Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 21 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Ivory at Brigade Orchards RERA complaints and orders

2 complaints as on Source (rera.karnataka.gov.in) (opens in a new tab)

Complaint refFiledSubjectStatusSource
00832/202512 Jun 2025Refund of the amount paid along with reasonable interestDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00319/202426 Mar 2024Builder not Signing the Agreement To Sell without giving POA and Under taking letter which is clubbed together with ATSPosted for ordersSource (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About Brigade Enterprises Ltd

Promoter type
Company
Projects on this site
28
RERA complaints against promoter
44
Company number (CIN)
U45201KA2008PTC045861

From Karnataka RERA, as collected so far (21 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

Brigade Enterprises Ltd’s RERA record

Brigade Enterprises Ltd delivery record

As on 22 Oct 2026
  • 28Projects in Bengaluru on RERA32 approved registrations under Brigade Enterprises Ltd in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
  • 15,990Homes and plots registeredAs stated in 31 of the 32 registrations.
  • 44RERA complaints5 open, 39 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
  • 2.8Complaints per 1,000 homes and plots44 complaints ÷ 15,990 homes and plots in its 32 registrations on Karnataka RERA in Bengaluru.
  • 5Completion filed on RERARegistrations where the promoter applied to RERA for completion; 2 with an occupancy certificate on RERA.
  • 0 of 5Filed by the date given at registrationMedian gap 9.4 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.

What the complaints are about

  • Delay in possession or delay interest18
  • Refund of booking or other money10
  • Construction quality, size or inspection4
  • Registration, sale deed or agreement3
  • Owners' association, amenities or documents2
  • Litigation or title disclosure2
  • Other5

44 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)

Completion filed on RERA

ProjectDate at registrationCompletion filedGap
Brigade Northridge NeoOC on RERA31 Mar 2022extended to 30 Sep 202220 May 202650 months after
Brigade BricklaneOC on RERA31 Dec 2021extended to 31 Mar 202316 May 202653 months after
Brigade Oasis - Phase 130 Jun 2025extended to 30 Jun 202613 Apr 20269 months after
Brigade Oasis - Phase 230 Jun 2025extended to 30 Jun 202613 Apr 20269 months after
Brigade Oasis - Phase 330 Jun 2025extended to 30 Jun 202613 Apr 20269 months after

Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Aug 2021

As on 21 Oct 2026
  1. 30 Dec 2026Phase 1: Completion date extended to 30 Dec 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 15 Oct 2026Phase 2: Quarterly update filed for Q2 2026-27: 88% built, 487 of 487 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 15 Jul 2026Phase 1: Quarterly update filed for Q1 2026-27: 100% built, 454 of 457 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 15 Jul 2026Phase 2: Quarterly update filed for Q1 2026-27: 83% built, 487 of 487 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 15 Apr 2026Phase 1: Quarterly update filed for Q4 2025-26: 100% built, 454 of 457 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  6. 15 Apr 2026Phase 2: Quarterly update filed for Q4 2025-26: 76% built, 487 of 487 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  7. 14 Jan 2026Phase 1: Quarterly update filed for Q3 2025-26: 100% built, 457 of 457 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  8. 14 Jan 2026Phase 2: Quarterly update filed for Q3 2025-26: 68% built, 486 of 487 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  9. 12 Jun 2025Complaint 00832/2025 filed with RERA: “Refund of the amount paid along with reasonable interest” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  10. 26 Mar 2024Complaint 00319/2024 filed with RERA: “Builder not Signing the Agreement To Sell without giving POA and Under taking letter which is clubbed together with ATS” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
  11. 15 Dec 2023Phase 2: Registered with Karnataka RERA (PRM/KA/RERA/1250/303/PR/151223/006485); completion date 31 Dec 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
  12. 5 Dec 2023Phase 2: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  13. 4 Jan 2022Phase 1: Registered with Karnataka RERA (PRM/KA/RERA/1250/303/PR/220104/004626); completion date 31 Dec 2025 Source (rera.karnataka.gov.in) (opens in a new tab)
  14. 6 Sep 2021Phase 1: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  15. 26 Aug 2021Phase 2: Building plan approved by Local Planing Authority (No. STRRPA/TP/CC/77/2021-22) Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

How we calculate this

Ivory at Brigade Orchards FAQs

What is the RERA registration number for Ivory at Brigade Orchards?

Phase 1 is registered as PRM/KA/RERA/1250/303/PR/220104/004626 (registered on 4 January 2022) and Phase 2 is registered as PRM/KA/RERA/1250/303/PR/151223/006485 (registered on 15 December 2023).

How many homes are in Ivory at Brigade Orchards?

The project has 605 homes total: 118 homes in Phase 1 and 487 homes in Phase 2.

What home types are available in Ivory at Brigade Orchards?

Phase 1 offers studio units (301 sq ft), 1 BHK (344-452 sq ft), 2 BHK (549-629 sq ft), and 3 BHK (743-881 sq ft). Phase 2 offers similar types with more options, including 1 BHK (334-463 sq ft), 2 BHK (549-629 sq ft), 3 BHK (743-888 sq ft), and studio units (301 sq ft).

When will Phase 1 of Ivory at Brigade Orchards be completed?

Phase 1 is scheduled for completion on 31 December 2026, with a Section 6 Extension noted on RERA.

When will Phase 2 of Ivory at Brigade Orchards be completed?

Phase 2 is scheduled for completion on 31 December 2027.

What is the construction progress of Ivory at Brigade Orchards?

As of Q1 2026-27 (ended 30 June 2026), Phase 1 is 100% complete. As of Q2 2026-27 (ended 30 September 2026), Phase 2 is 88% complete.

How many homes have been booked in Ivory at Brigade Orchards?

In Phase 1, 454 homes have been booked as of Q1 2026-27. In Phase 2, 487 homes have been booked as of Q2 2026-27.

What are the RERA complaints against Ivory at Brigade Orchards?

There are 2 RERA complaints on this project: 1 on Phase 1 registration and 1 on Phase 2 registration.

Where is Ivory at Brigade Orchards located?

The project is located in Devanahalli, Devanahalli taluk, Bengaluru Rural district, PIN code 560001.

What is the builder's complaint record?

BCV Developers Pvt Ltd has 15 RERA complaints across all its projects and has 9 projects recorded on the Karnataka RERA register.

Written by AI from the RERA record above on 21 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Ivory at Brigade Orchards

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from Brigade Enterprises Ltd? Review the builder.

Reviews of Brigade Enterprises Ltd by verified buyers

No verified reviews of Brigade Enterprises Ltd yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
MVN Aero OneMF Farmlands Private Limited0.4 km213Dec 2026—0Not collected
Ebony at Brigade OrchardsBrigade Enterprises Ltd0.5 km232Mar 202942%0Not collected
Fairmont at Brigade OrchardsBrigade Enterprises Ltd0.6 km92Dec 2027100%0Not collected
Laurel & Maple at Brigade OrchardsBrigade Enterprises Ltd1.4 km311Mar 203015%0Not collected
MVN Aero One T5 & T6MF Farmlands Private Limited1.7 km137Jul 202795%0Not collected
Geetanjali Vatika AerocityRatngarbha Ventures Private Limited1.8 km40Oct 2029—0Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 21 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1250/303/PR/220104/004626, PRM/KA/RERA/1250/303/PR/151223/006485.

  • RERA record last checked: 21 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 21 Oct 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error