LivingTree by Kalyani Developers
1, 2 & 3 BHK apartments by Kalyani Tech Park Private Limited · Bagalur, Bengaluru
Bagaluru, Bagalur, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
by Kalyani Tech Park Private Limited
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
LivingTree by Kalyani Developers at a glance
- Possession (RERA)Sep 2029Karnataka RERA
- Construction45% built · on pace for Mar 2029RERA filing to 30 Sep 2026; estimate from average pace
- Homes booked2,287 of 2,736 (84%)RERA update · as on 30 Sep 2026
- RERA complaints (project)4 complaintsKarnataka RERA · as on 21 Oct 2026
- Approvals filed7 of 9 on RERAKarnataka RERA uploads · 21 Oct 2026
- Nearest metroDoddajala · 6.26 km (under construction)Open now: Krishnarajapura, 15.81 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 29 min at peak7.15 km straight line · estimate
- Nearest lakeGummanahalli Lake · 778 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
LivingTree by Kalyani Developers is a residential project by Kalyani Tech Park Private Limited in Bagaluru, Bengaluru with 2,736 homes, registered with Karnataka RERA. The completion date on RERA is 15 Sep 2029.
Facts collected on 21 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
LivingTree by Kalyani Developers buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Kalyani Tech Park Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the LivingTree by Kalyani Developers buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 1 BHK, 2 BHK, 3 BHK
- Carpet area
- 278 – 1,300 sq ft
- Towers
- 6
- Floors
- 25
- Total homes
- 2,736
- Land
- 25 acres
- Possession (RERA)
- Sep 2029
- Built (RERA update)
- 45%
LivingTree by Kalyani Developers RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/309/PR/260924/007084
- Registered on
- 26 Sep 2024
- Promised completion
- 15 Sep 2029
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 2,287 of 2,736 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| Building 1 | 25 | 2 | 440 |
| Building 2 | 25 | 2 | 490 |
| Building 3 | 25 | 2 | 480 |
| Building 4 | 25 | 2 | 570 |
| Building 5 | 24 | 2 | 283 |
| Building 6 | 24 | 2 | 473 |
A dash (—) means the filing did not state that value.
Summary in plain English
LivingTree by Kalyani Developers is a residential project by Kalyani Tech Park Private Limited in Bagaluru, Bengaluru North. The project has 2,736 homes across 6 towers, with completion on 15 September 2029.
Written by AI from the RERA record above on 21 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 23.4% of land
- Water and power
- Water source filed with RERA: BoreWell,Others
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- ICICI Bank, J P Nagar
- Building plan (RERA)
- KIADB - Karnataka Industrial Areas Development Board · No. DO3-KIADB-00156/23-24/BP · dated 14 May 2024
- Project cost declared to RERA
- ₹909 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Community Hall
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
LivingTree by Kalyani Developers location and address
- Address
- Plot 7, Hitech Defence & Aerospace park, Bangalore , SY 430,452,453,454,455,456,457,458,459,463 &177(Block No. 8,9,10,11,12, & 13) of Bagaluru Village, Jala Hoblil, , Bengaluru North , Bengaluru Urban, Karnataka - 560064
- Village (RERA)
- Bagaluru
- Locality
- BagalurAlso known as Bagaluru, Aerospace Park
- PIN code
- 560064
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.14208, 77.67745
Distances to landmarks
Not found in public records yet: landmarksAbout Bagalur
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 7.15 km | approx. 29 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 12.17 km | approx. 49 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 18.37 km | approx. 74 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 21.65 km | approx. 88 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 24.28 km | approx. 98 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 32.54 km | approx. 132 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 6Schools and colleges6 schools, 0 colleges, 0 kindergartens
- 2Hospitals and clinics1 hospitals, 1 clinics
Nearest schools and colleges
- Government High School · 0.79 km
- Jawahar Navodaya Vidyalaya · 0.82 km
- Vijaya School · 1.42 km
Nearest hospitals and clinics
- Vikrant Hospital · 0.52 km
- SLV Poly Clinic · 0.68 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Doddajala (ದೊಡ್ಡಜಾಲ)Blue Line metro, under construction6.26 km
- Airport City (ವಿಮಾನ ನಿಲ್ದಾಣ ನಗರ)Blue Line metro, under construction6.34 km
- KIAL Terminals (ಕೆಐಎಬಿ ವಿಮಾನ ನಿಲ್ದಾಣ ಟರ್ಮಿನಲ್ಸ್)Blue Line metro, under construction7.32 km
- Krishnarajapura (ಕೃಷ್ಣರಾಜಪುರ (ಕೆ.ಆರ್.ಪುರ))Open now — nearest operating metro station15.81 km
- Doddajala Nearest railway station5.84 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Gummanahalli Lake, 778 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Gummanahalli Lake on OpenStreetMap (opens in a new tab) 778 m
- Bagaluru Kere on OpenStreetMap (opens in a new tab) (ಬಾಗಲೂರು ಕೆರೆ)1,226 m
- water tank on OpenStreetMap (opens in a new tab) 1,736 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
LivingTree by Kalyani Developers floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Floor plans2 files

02 KAR R7 - 2ND BASEMENT FLOOR PLAN (1)Filed 19 Sep 2024 · Full PDF on RERA 
03 KAR R7 - 1ST BASEMENT FLOOR PLAN (1)Filed 19 Sep 2024 · Full PDF on RERA
Elevations3 files

08 KAR R7 - BUILDING 1 - SHEET 3 OF 3-ELEVATIONFiled 19 Sep 2024 · Full PDF on RERA 
11 KAR R7 - BUILDING 2 - SHEET 3 OF 3-ELEVATIONFiled 19 Sep 2024 · Full PDF on RERA 
20 KAR R7 - BUILDING 5 - SHEET 3 OF 3--ELEVATIONFiled 19 Sep 2024 · Full PDF on RERA
Approved building plan2 pages

Building plan permitFiled 19 Sep 2024 · Full PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 1 BHK | 278 – 327 sq ft | 1,438 |
| 2 BHK | 582 – 749 sq ft | 1,248 |
| 3 BHK | 1,300 sq ft | 50 |
| Residential apartments | 479 sq ft | 2,736 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
LivingTree by Kalyani Developers possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
By tower (Q2 2026-27)
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 1 BHK | 1438 | 1210 | 228 |
| 2 BHK | 1248 | 1027 | 221 |
| 3 BHK | 50 | 50 | 0 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 15 Sep 2024Project start date given to RERA
- 26 Sep 2024Registered with Karnataka RERA
- 15 Sep 2029Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Mar 2029 — about 6 months before the completion date on RERA (15 Sep 2029).
At the pace between the 4 quarterly filings we have (23% → 45% in 9 months), it would be around Aug 2028 — about 13 months before the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 45% | 2,287 of 2,736 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 37% | 2,175 of 2,736 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 31% | 2,115 of 2,736 |
| Q3 2025-26to 31 Dec 2025 | 20 Jan 2026 | 23% | 1,950 of 2,736 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 45% ÷ 24.5 months (15 Sep 2024 to 30 Sep 2026) = 1.8% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 55 ÷ 1.8 = 29.9 months → Mar 2029. This is an estimate, not a date from the builder or RERA.
Pace between filings = (45% − 23%) ÷ 9 months = 2.5% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | KIADB - Karnataka Industrial Areas Development Board · No. DO3-KIADB-00156/23-24/BP · dated 2024-05-14 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — KIADB - Karnataka Industrial Areas Development Board · No. DO3-KIADB-00156/23-24/BP · dated 14 May 2024
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBNot on RERA yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 21 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
LivingTree by Kalyani Developers RERA complaints and orders
4 complaints as on Source (rera.karnataka.gov.in) (opens in a new tab)
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| 01005/2026 | 14 Aug 2026 | Complaint Regarding Demand of Payments Without Adequate Construction Progress Certification | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00831/2026 | 17 Jul 2026 | Request for Refund of Booking Amount – Flat No. 4185 | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00714/2026 | 22 Jun 2026 | disproportionate payment vs actual progress of project | Under enquiry ao | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01221/2025 | 24 Sep 2025 | Violation of Sections 12, 13, 18 & 61: Misrepresentation & EWS Misuse in Kalyani LivingTree | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Kalyani Tech Park Private Limited
- Promoter type
- Company
- Projects on this site
- 1
- RERA complaints against promoter
- 4
- Company number (CIN)
- U45202KA2006PTC038320
From Karnataka RERA, as collected so far (21 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Kalyani Tech Park Private Limited’s RERA recordKalyani Tech Park Private Limited delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Kalyani Tech Park Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 2,736Homes registeredAs stated in each registrations.
- 4RERA complaints2 open, 2 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 1.5Complaints per 1,000 homes4 complaints ÷ 2,736 homes in its 1 registration on Karnataka RERA in Bengaluru.
What the complaints are about
4 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since May 2024
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 45% built, 2,287 of 2,736 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Aug 2026Complaint 01005/2026 filed with RERA: “Complaint Regarding Demand of Payments Without Adequate Construction Progress Certification” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 17 Jul 2026Complaint 00831/2026 filed with RERA: “Request for Refund of Booking Amount – Flat No. 4185” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 37% built, 2,175 of 2,736 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 22 Jun 2026Complaint 00714/2026 filed with RERA: “disproportionate payment vs actual progress of project” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 31% built, 2,115 of 2,736 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 20 Jan 2026Quarterly update filed for Q3 2025-26: 23% built, 1,950 of 2,736 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 24 Sep 2025Complaint 01221/2025 filed with RERA: “Violation of Sections 12, 13, 18 & 61: Misrepresentation & EWS Misuse in Kalyani LivingTree” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 26 Sep 2024Registered with Karnataka RERA (PRM/KA/RERA/1251/309/PR/260924/007084); completion date 15 Sep 2029 Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Sep 2024Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 May 2024Building plan approved by KIADB - Karnataka Industrial Areas Development Board (No. DO3-KIADB-00156/23-24/BP) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
LivingTree by Kalyani Developers FAQs
What is the RERA registration number for LivingTree by Kalyani Developers?
The RERA registration number is PRM/KA/RERA/1251/309/PR/260924/007084, registered on 26 September 2024.
When will LivingTree by Kalyani Developers be completed?
The completion date on RERA is 15 September 2029.
How many homes are in LivingTree by Kalyani Developers?
The project has 2,736 homes across 6 towers.
What home types are available in LivingTree by Kalyani Developers?
The project offers 1 BHK homes with carpet area from 278 to 327 sq ft, 2 BHK homes from 582 to 749 sq ft, and 3 BHK homes at 1,300 sq ft.
What is the carpet area in LivingTree by Kalyani Developers?
Carpet areas range from 278 sq ft for 1 BHK to 1,300 sq ft for 3 BHK homes.
How many homes have been booked in LivingTree by Kalyani Developers?
As of the Q2 2026-27 quarterly update (ended 30 September 2026), 2,287 homes have been booked out of 2,736 homes.
What is the construction progress of LivingTree by Kalyani Developers?
According to the Q2 2026-27 quarterly update, construction is 45% complete.
Where is LivingTree by Kalyani Developers located?
The project is located in Bagaluru, Bengaluru North taluk, PIN code 560064.
How many RERA complaints are there for LivingTree by Kalyani Developers?
There are 4 complaints filed on RERA for this project.
How many other projects does Kalyani Tech Park Private Limited have on RERA record?
This is the only project by the builder in our Bengaluru records, though the builder has 4 RERA complaints across all its projects.
Written by AI from the RERA record above on 21 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about LivingTree by Kalyani Developers
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Kalyani Tech Park Private Limited? Review the builder.
Reviews of Kalyani Tech Park Private Limited by verified buyers
No verified reviews of Kalyani Tech Park Private Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Dhruvija GopuraDhruvija Gopura | 0.5 km | 250 | Mar 2032 | 5% | 0 | Not collected |
| Godrej AnandaGodrej Properties Limited | 0.6 km | 1,612 | Jan 2027extended | 100% | 2 | from ₹1.3 Crabout ₹18,500/sq ft carpet |
| Soul@Godrej AnandaGodrej Properties Limited | 0.6 km | 2,210 | Aug 2028 | 63% | 1 | Not collected |
| Assetz Sora & Saki Phase 3Vedant Homes | 0.7 km | 304 | Apr 2029 | 37% | 0 | Not collected |
| Assetz Sora & SakiNetra Software Technologies Private Limited | 0.7 km | 992 | Jul 2029 | — | 0 | Not collected |
| Aurum at Brigade El DoradoBrigade Enterprises Ltd | 0.8 km | 635 | Dec 2027 | 86% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 21 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/309/PR/260924/007084.
- RERA record last checked: 21 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 21 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Bagalur
BagalurUnder constructionRERA registeredBuyers’ group openDhruvija Gopura
by Dhruvija Gopura
Price: Price on requestGet brochure & price →
- Studio, 1 BHK, 2 BHK, 3 BHK
- 181 – 1,262 sq ft
- Mar 2032
250 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Dhruvija Gopura
BagalurArtist’s impressionUnder constructionRERA registeredBuyers’ group openGodrej Ananda
by Godrej Properties
Price: Price on requestGet brochure & price →
- Studio, 1 BHK, 2 BHK, 3 BHK
- 231 – 703 sq ft
- Jan 2027 (extended)
1,612 homes · 2 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Godrej Ananda
BagalurUnder constructionRERA registeredBuyers’ group openSoul@Godrej Ananda
by Godrej Properties
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 2.5 BHK, 3 BHK
- 191 – 896 sq ft
- Aug 2028
2,210 homes · 1 RERA complaint
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Soul@Godrej Ananda