Northern Lights by Puravankara KVN Phase 3
2, 3 & 4 BHK mixed-use project by Puravankara Limited · Bagalur, Bengaluru
Bagalur, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- mixed
by Puravankara Limited · registered with RERA by KVN Property Holdings LLP
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Northern Lights by Puravankara KVN Phase 3 at a glance
- Possession (RERA)Dec 2031Karnataka RERA
- Construction1% builtPromoter’s RERA update · as on 30 Sep 2026
- Homes booked189 of 540 (35%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 16 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 16 Oct 2026
- Nearest metroMadavara · 51.05 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 305 min at peak75.31 km straight line · estimate
Project summary
Northern Lights by Puravankara KVN Phase 3 is a mixed-use project by Puravankara Limited in Bagalur, Bengaluru with 540 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2031.
Facts collected on 16 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Northern Lights by Puravankara KVN Phase 3 buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Puravankara Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Northern Lights by Puravankara KVN Phase 3 buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK, 4 BHK
- Carpet area
- 80 – 2,332 sq ft
- Towers
- 2
- Floors
- 30
- Total homes
- 540
- Land
- 6.3 acres
- Possession (RERA)
- Dec 2031
- Built (RERA update)
- 1%
Northern Lights by Puravankara KVN Phase 3 RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/309/PR/120326/008525
- Registered on
- 12 Mar 2026
- Promised completion
- 31 Dec 2031
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 189 of 540 as on
- Price
- Not found in public records yet: price
- Project type
- Mixed
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| Wing 6 | 30 | 1 | 270 |
| Wing 7 | 30 | 1 | 270 |
A dash (—) means the filing did not state that value.
Summary in plain English
Northern Lights by Puravankara KVN Phase 3 is a mixed-use project by KVN Property Holdings LLP in Bagalur, Bengaluru North with 540 homes across 2 towers. The project is registered with RERA and scheduled for completion on 31 December 2031.
Written by AI from the RERA record above on 16 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 61.8% of land
- Water and power
- Water source filed with RERA: Local Authority
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- HDFC, Ulsoor Road Branch
- Building plan (RERA)
- KIADB - Karnataka Industrial Areas Development Board · No. DO3-KIADB-00190/25-26/BP · dated 7 Mar 2026
- Project cost declared to RERA
- ₹465 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- Club House
- Community Hall
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Northern Lights by Puravankara KVN Phase 3 location and address
- Address
- Plot No. R-12 of Hitech, Defense and Aerospace Park, Bengaluru Comprised in Sy No. Part of 417,418,419,423,389,390,391,392,393 & 117 , Bagalur Village Jala Hobli, Bengaluru North Yelahanka Taluk, Bengaluru Urban District , Bengaluru North , Bengaluru Urban, Karnataka - 562149
- Village (RERA)
- Bagalur
- Locality
- BagalurAlso known as Bagaluru, Aerospace Park
- PIN code
- 562149
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.14889, 77.01087
Distances to landmarks
Not found in public records yet: landmarksAbout Bagalur
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 63.42 km | approx. 257 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 66.9 km | approx. 271 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 75.31 km | approx. 305 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 76.82 km | approx. 311 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 78.29 km | approx. 317 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 80.75 km | approx. 327 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Nearest metro station and railway
- Madavara (ಮದವರ)Open now — nearest operating metro station51.05 km
- Kunigal (ಕುಣಿಗಲ್)Nearest railway station14.71 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Northern Lights by Puravankara KVN Phase 3 floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Floor plans5 files

26 WINGS 5 6 7 2ND & 3RD FLOOR PLAN.pdfFull PDF on RERA 
27 WINGS 5 6 7 4TH & 5TH TO 16TH 18TH TO 26TH FLOOR PLAN.pdfFull PDF on RERA 
28 WINGS 5 6 7 17TH 18TH (REFUGE) FLOOR PLAN.pdfFull PDF on RERA 
29 WINGS 5 6 7 28TH & 29TH (PENTHOUSE) FLOOR PLAN.pdfFull PDF on RERA 
30 WINGS 5 6 7 30TH TERRACE & UPPER TERRACE FLOOR PLAN.pdfFull PDF on RERA
Elevations

43 ELEVATION 1 AND 2.pdfFull PDF on RERA
Approved building plan

Approved Building PlanFull PDF on RERA
Approved layout plan6 pages

PHASE WISE DEMARCATION KVN.pdfFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 670 – 741 sq ft | 224 |
| 3 BHK | 1,033 – 1,184 sq ft | 200 |
| 4 BHK | 2,236 – 2,332 sq ft | 16 |
| Ews | 80 sq ft | 100 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Northern Lights by Puravankara KVN Phase 3 possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
By tower (Q2 2026-27)
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2 BHK | 224 | 149 | 75 |
| 3 BHK | 200 | 37 | 163 |
| 4 BHK | 16 | 1 | 15 |
| EWS | 100 | 2 | 98 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 12 Mar 2026Registered with Karnataka RERA
- 15 Apr 2027Project start date given to RERA
- 31 Dec 2031Completion date given at registration
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | KIADB - Karnataka Industrial Areas Development Board · No. DO3-KIADB-00190/25-26/BP · dated 2026-03-07 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — KIADB - Karnataka Industrial Areas Development Board · No. DO3-KIADB-00190/25-26/BP · dated 7 Mar 2026
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 16 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Northern Lights by Puravankara KVN Phase 3 RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Puravankara Limited
- Promoter type
- Partnership Firm
- Projects on this site
- 25
- RERA complaints against promoter
- 111
- Company number (CIN)
- ACN-5553
From Karnataka RERA, as collected so far (16 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Puravankara Limited’s RERA recordPuravankara Limited delivery record
- 25Projects in Bengaluru on RERA36 approved registrations under Puravankara Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 14,135Homes and plots registeredAs stated in each registrations.
- 111RERA complaints19 open, 92 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 7.9Complaints per 1,000 homes and plots111 complaints ÷ 14,135 homes and plots in its 36 registrations on Karnataka RERA in Bengaluru.
- 1Completion filed on RERARegistrations where the promoter applied to RERA for completion; 0 with an occupancy certificate on RERA.
- 0 of 1Filed by the date given at registrationMedian gap 7.4 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
What the complaints are about
111 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| Sound of Water Phase 1 by Puravankara | 31 Dec 2019 | 11 Aug 2020 | 7 months after |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Mar 2026
- 15 Apr 2027Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Oct 2026Quarterly update filed for Q4 2025-26: 0% built, 74 of 540 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Oct 2026Quarterly update filed for Q1 2026-27: 0% built, 133 of 540 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 1% built, 189 of 540 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Mar 2026Registered with Karnataka RERA (PRM/KA/RERA/1251/309/PR/120326/008525); completion date 31 Dec 2031 Source (rera.karnataka.gov.in) (opens in a new tab)
- 7 Mar 2026Building plan approved by KIADB - Karnataka Industrial Areas Development Board (No. DO3-KIADB-00190/25-26/BP) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Northern Lights by Puravankara KVN Phase 3 FAQs
What is the RERA registration number for Northern Lights by Puravankara KVN Phase 3?
The RERA registration number is PRM/KA/RERA/1251/309/PR/120326/008525, registered on 12 March 2026.
When will Northern Lights by Puravankara KVN Phase 3 be completed?
The project completion date on RERA is 31 December 2031.
How many homes are in Northern Lights by Puravankara KVN Phase 3?
The project has 540 homes across 2 towers with a maximum of 30 floors.
What home types are available in Northern Lights by Puravankara KVN Phase 3?
The project offers EWS (80 to 80 sq ft carpet area), 2 BHK (670 to 741 sq ft), 3 BHK (1,033 to 1,184 sq ft), and 4 BHK (2,236 to 2,332 sq ft) homes.
How many homes of each type are in Northern Lights by Puravankara KVN Phase 3?
There are 100 EWS, 224 two-bedroom, 200 three-bedroom, and 16 four-bedroom homes.
What is the construction progress for Northern Lights by Puravankara KVN Phase 3?
As of 30 September 2026, construction is 1% complete and 189 homes are booked out of 540 available.
Where is Northern Lights by Puravankara KVN Phase 3 located?
The project is in Bagalur, Bengaluru North taluk, Bengaluru Urban district, with PIN code 562149.
Are there any RERA complaints on Northern Lights by Puravankara KVN Phase 3?
There are no RERA complaints filed on this project.
What is KVN Property Holdings LLP's RERA complaint record?
KVN Property Holdings LLP has no RERA complaints recorded against it across all projects.
How many other projects does KVN Property Holdings LLP have in the Bengaluru RERA records?
KVN Property Holdings LLP has 2 projects recorded with Bengaluru RERA, including this one.
Written by AI from the RERA record above on 16 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Northern Lights by Puravankara KVN Phase 3
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Puravankara Limited? Review the builder.
Reviews of Puravankara Limited by verified buyers
No verified reviews of Puravankara Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Sources and last checked dates
Collected on 16 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/309/PR/120326/008525.
- RERA record last checked: 16 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 16 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Bagalur
BagalurUnder constructionRERA registeredBuyers’ group openNorthern Lights by Puravankara KVN
by Puravankara
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 3 BHK, 4 BHK
- 80 – 2,332 sq ft
- Dec 2030
2 phases on RERA · 2,433 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Northern Lights by Puravankara KVN
Bagluru, BagalurUnder constructionRERA registeredBuyers’ group openDioro & Beryl at Brigade El Dorado
by Brigade Enterprises
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 3 BHK
- 120 – 61,866 sq ft
- Jun 2028
1,325 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Dioro & Beryl at Brigade El Dorado- Bettahalasuru, Bellary Road (Airport Road)Ready to moveRERA registeredBuyers’ group open
After the Rain
by Total Environment Building Systems
Price: Price on requestGet brochure & price →
- 1 BHK, 4 BHK
- 280 – 4,058 sq ft
- Sep 2024 (extended)
2 phases on RERA · 383 homes · 9 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for After the Rain