The Woods Of East
25×30, 30×50 +4 more plots by Odion Builders & Developers · Chikkanayakanahalli, Kodathi–Carmelaram, Bengaluru
Chikkanayakanahalli, Kodathi–Carmelaram, BengaluruOpen on Google Maps (opens in a new tab)
- Completion filed with RERA
- RERA registered
- plotted
Plots still available: 163 of 299 plots were unsold when the developer filed completion with RERA (31 Dec 2025). Some may have sold since — join the group and we’ll ask the developer what is left and for a group price.
by Odion Builders & Developers
Price: Price on request
The Woods Of East at a glance
- Completion (RERA)Sep 2021 ExtendedWas Dec 2025 · Karnataka RERA
- RERA complaints (project)None listedKarnataka RERA · as on 4 Oct 2026
- Approvals filed7 of 9 on RERAKarnataka RERA uploads · 4 Oct 2026
- Nearest metroPrestige Bellandur · 4.27 km (under construction)Open now: Beratena Agrahara, 4.96 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 139 min at peak34.39 km straight line · estimate
- Nearest lakeHalanayakanahalli Lake · 462 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
The Woods Of East is a plotted development by Odion Builders & Developers in Chikkanayakanahalli, Bengaluru, registered with Karnataka RERA. The completion date on RERA is 30 Sep 2021. It is registered in 4 phases.
Not in the RERA record we collected yet: number of plots. This page fills in as the record is collected.
Facts collected on 4 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.
The Woods Of East buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Odion Builders & Developers for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.
- Gathering buyers
- Talking to the developer
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.
Join the The Woods Of East buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: plot sizes, approval, land and completion
- Plot sizes (feet)
- 25×30, 30×50, 30×55, 40×50 +2 more
- Plot area
- 596 – 4,841 sq ft
- Total plots
- Not found in public records yet: total plots
- Layout approved by
- BDA
- Land
- Not found in public records yet: land area
- Land conversion orders
- 6
- Completion (extended)
- Sep 2021
- Development (RERA update)
- Not found in public records yet: development progress
Plot sizes (RERA filing)
| Size (feet) | Area | Plots |
|---|---|---|
| 25×30 | 750 sq ft | 8 |
| 30×50 | 1,500 sq ft | 59 |
| 30×55 | 1,650 sq ft | 10 |
| 40×50 | 2,000 sq ft | 7 |
| 44×50 | 2,200 sq ft | 2 |
| 44×55 | 2,420 sq ft | 1 |
| Odd-sized (irregular) | varies | 20 |
| EWS | — | 4 |
Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.
Approving authority as filed: BDA - Bangalore Development Authority.
Land conversion orders (RERA filing)
| Phase | Survey no. | Converted for | Order | By |
|---|---|---|---|---|
| Phase Vii | 9/1 | Residential | No. ALN(EVH)SR 274/2008-09, 19 Dec 2008 | DEPUTY COMMISSIONER |
| Phase Vii | 9/5 | Residential | No. ALN[V-2]P]SR/41/2017-18, 8 Nov 2017 | DEPUTY COMMISSIONER |
| Phase Vii | 65/4 | Residential | No. ALN[V2P]SR/183/2021-22, 13 Apr 2022 | DEPUTY COMMISSIONER |
| Phase Viii | 56/2 | Residential | No. 14112, 7 Sep 2019 | DC Office, Bangalore |
| Phase Viii | 56/7(p) | Residential | No. 543637, 12 Oct 2023 | DC Office, Bangalore |
| Phase Viii | 56/8 | Residential | No. 543641, 12 Oct 2023 | DC Office, Bangalore |
RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.
The Woods Of East RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/308/PR/180130/002241
- Registered on
- 30 Jan 2018
- Promised completion
- 31 Dec 2025
- Extended to
- 30 Sep 2021
- RERA status
- Completed
- Plots booked
- Not found in public records yet: plots booked
- Price
- Not found in public records yet: price
- Project type
- Plotted
4 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.
Phases and RERA numbers
| Phase | RERA number | Promised completion | Plots | Status | Source |
|---|---|---|---|---|---|
| Main registration | PRM/KA/RERA/1251/308/PR/180130/002241 | 1 Mar 2018 | — | Completed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase 3 | PRM/KA/RERA/1251/446/PR/190504/002541 | 31 Dec 2020Extended to 30 Sep 2021 | — | Completed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase Vii | PRM/KA/RERA/1251/446/PR/130723/006055 | 31 Mar 2024 | 44 | Completed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase Viii | PRM/KA/RERA/1251/446/PR/180725/007935 | 31 Dec 2025 | 67 | Completed | Source (rera.karnataka.gov.in) (opens in a new tab) |
Summary in plain English
The Woods Of East is a plotted layout by Odion Developers & Developers in Chikkanayakanahalli, Anekal taluk, Bengaluru Urban. The project has 4 RERA registrations across multiple phases with plot sizes ranging from 25×30 to 44×55 feet. Completion dates on RERA range from 1 March 2018 for the main registration to 31 December 2025 for Phase VIII.
Written by AI from the RERA record above on 7 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: Local Authority, BoreWell
- Plot loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA) · Main registration
- HDFC, Bellandur Gate
- Escrow bank (RERA) · Phase 3
- HDFC, Bellandur Gate
- Escrow bank (RERA) · Phase Vii
- HDFC, Agara junction
- Escrow bank (RERA) · Phase Viii
- HDFC, Agara Junction Branch
Amenities
The Woods Of East location and address
- Address
- Syno . 67/3 , 65/2 , 65/3 , 65/1A2 , 35/3 , Chikkanayakanahalli village ,Sarjapur main road
- Village (RERA)
- Chikkanayakanahalli
- Locality
- Kodathi–CarmelaramAlso known as Kodathi, Carmelaram
- PIN code
- 560035
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.89163, 77.69368
Distances to landmarks
Not found in public records yet: landmarksAbout Kodathi–Carmelaram
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 3.81 km | approx. 15 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 5.61 km | approx. 23 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 11.7 km | approx. 47 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 16.54 km | approx. 67 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 19.15 km | approx. 78 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 34.39 km | approx. 139 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 17Schools and colleges13 schools, 3 colleges, 1 kindergartens
- 4Hospitals and clinics1 hospitals, 3 clinics
Nearest schools and colleges
- Sri Chaitanya Techno School · 0.2 km
- Primus Public School · 0.5 km
- Bhoomi College · 0.64 km
Nearest hospitals and clinics
- Punarjani Ayurvedic Multispeciality Hospital · 0.56 km
- A & J Ayur Care · 1.53 km
- Kodathi Primary Health Centre · 1.72 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Prestige Bellandur (ಬೆಳ್ಳಂದೂರ್)Blue Line metro, under construction4.27 km
- Embassy Tech Village Kadubeesanahalli (ಕಾಡುಬೀಸನಹಳ್ಳಿ)Blue Line metro, under construction4.56 km
- Ibbaluru (ಇಬ್ಬಲೂರು)Blue Line metro, under construction4.65 km
- Beratena Agrahara (ಬೆರಟೇನ ಅಗ್ರಹಾರ)Open now — nearest operating metro station4.96 km
- Carmelaram (ಕರ್ಮೇಲರಮ್)Nearest railway station2.19 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Halanayakanahalli Lake, 462 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Halanayakanahalli Lake on OpenStreetMap (opens in a new tab) (ಹಳನಾಯಕನಹಳ್ಳಿ ಸರೋವರ)462 m
- Hadosiddapura Lake on OpenStreetMap (opens in a new tab) (ಹಾಡೋಸಿದ್ದಾಪುರ ಕೆರೆ)762 m
- Choodasandra Lake on OpenStreetMap (opens in a new tab) 1,495 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
The Woods Of East layout plan and plot types as filed
Layout plan and brochure not published? The developer shares them only on request. We’ll get the brochure, layout plan and current price list for you, free.
Get brochure, layout plan & price| Plot type (as filed) | Area | Plots |
|---|---|---|
| 7.62 x 9.14 (ews) m | — | 7 |
| Plot 7.62 m × 9.14 m | — | 1 |
| Plot 9.14 m × 15.24 m | — | 39 |
| 9.14 x 15.24 m plots | — | 20 |
| 9.14 x 16.76 m plots | — | 10 |
| Plot 12.19 m × 15.24 m | — | 7 |
| 13.34 x 15.24 m plots | — | 2 |
| 13.34 x 16.76 m plots | — | 1 |
| Ews plots | — | 4 |
| Odd-shaped plots | — | 13 |
| Odd sites plots | — | 7 |
Plot types and counts as filed with Karnataka RERA.
We have not collected the layout plan drawing; the developer’s sales team can share it.
The Woods Of East completion date and development status
Timeline
- 1 Oct 2017Main registration: Project start date given to RERA
- 30 Jan 2018Main registration: Registered with Karnataka RERA
- 1 Mar 2018Main registration: Completion date given at registration
- 11 Dec 2018Phase 3: Project start date given to RERA
- 4 May 2019Phase 3: Registered with Karnataka RERA
- 31 Dec 2020Phase 3: Completion date given at registration
- 3 Aug 2021Phase Vii: Project start date given to RERA
- 30 Sep 2021Phase 3: Covid Extension: completion date moved to this date
- 20 Jun 2023Main registration: Promoter applied to RERA for completion
- 20 Jun 2023Phase 3: Promoter applied to RERA for completion
- 13 Jul 2023Phase Vii: Registered with Karnataka RERA
- 1 Mar 2024Phase Viii: Project start date given to RERA
- 21 Mar 2024Phase Vii: Promoter applied to RERA for completion
- 31 Mar 2024Phase Vii: Completion date given at registration
- 18 Jul 2025Phase Viii: Registered with Karnataka RERA
- 31 Dec 2025Phase Viii: Promoter applied to RERA for completion
- 31 Dec 2025Phase Viii: Completion date given at registration
Approvals and documents checklist
25 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Layout plan (Main registration) | BDA - Bangalore Development Authority | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Layout plan (Phase 3) | BDA - Bangalore Development Authority | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Layout plan (Phase Vii) | BDA - Bangalore Development Authority · No. 36/2021 · dated 2021-02-16 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (3 orders) (Phase Vii) | DEPUTY COMMISSIONER · No. ALN(EVH)SR 274/2008-09 and 2 more · dated 2022-04-13 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase Vii) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter (Phase Vii) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter (Phase Vii) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan (Phase Vii) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan (Phase Vii) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use (Phase Vii) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 (Phase Vii) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase Vii) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase Vii) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department (Phase Vii) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India (Phase Vii) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA (Phase Vii) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC in case of building proposals abutting to neighbouring properties (Phase Vii) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Layout plan (Phase Viii) | BDA - Bangalore Development Authority · No. PRL-23/2019-20/2374 · dated 2024-01-25 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (3 orders) (Phase Viii) | DC Office, Bangalore · No. 14112 and 2 more · dated 2023-10-12 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase Viii) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter (Phase Viii) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter (Phase Viii) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan (Phase Viii) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase Viii) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase Viii) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA (Phase Vii)
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BDA - Bangalore Development Authority · No. 36/2021 · dated 16 Feb 2021
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 4 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.
The Woods Of East RERA complaints
No complaints listed on Karnataka RERA for these registrations as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Odion Builders & Developers
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (4 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Odion Builders & Developers’s RERA recordOdion Builders & Developers delivery record
- 1Projects in Bengaluru on RERA4 approved registrations under Odion Builders & Developers in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 111Plots registeredAs stated in 2 of the 4 registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 plots0 complaints ÷ 111 plots in its 4 registrations on Karnataka RERA in Bengaluru.
- 4Completion filed on RERARegistrations where the promoter applied to RERA for completion; 0 with an occupancy certificate on RERA.
- 2 of 4Filed by the date given at registrationMedian gap 14.8 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| The Woods Of East Phase Viii | 31 Dec 2025 | 31 Dec 2025 | By the date |
| The Woods Of East Phase Vii | 31 Mar 2024 | 21 Mar 2024 | By the date |
| The Woods Of East | 1 Mar 2018 | 20 Jun 2023 | 64 months after |
| The Woods Of East Phase 3 | 31 Dec 2020extended to 30 Sep 2021 | 20 Jun 2023 | 30 months after |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Oct 2017
- 31 Dec 2025Phase Viii: Promoter applied to RERA for completion Source (rera.karnataka.gov.in) (opens in a new tab)
- 18 Jul 2025Phase Viii: Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/180725/007935); completion date 31 Dec 2025 Source (rera.karnataka.gov.in) (opens in a new tab)
- 21 Mar 2024Phase Vii: Promoter applied to RERA for completion Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Mar 2024Phase Viii: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 25 Jan 2024Phase Viii: Building plan approved by BDA - Bangalore Development Authority (No. PRL-23/2019-20/2374) Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Jul 2023Phase Vii: Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/130723/006055); completion date 31 Mar 2024 Source (rera.karnataka.gov.in) (opens in a new tab)
- 20 Jun 2023Main registration: Promoter applied to RERA for completion Source (rera.karnataka.gov.in) (opens in a new tab)
- 20 Jun 2023Phase 3: Promoter applied to RERA for completion Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 Sep 2021Phase 3: Completion date extended to 30 Sep 2021 Source (rera.karnataka.gov.in) (opens in a new tab)
- 3 Aug 2021Phase Vii: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 16 Feb 2021Phase Vii: Building plan approved by BDA - Bangalore Development Authority (No. 36/2021) Source (rera.karnataka.gov.in) (opens in a new tab)
- 4 May 2019Phase 3: Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/190504/002541); completion date 31 Dec 2020 Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 Dec 2018Phase 3: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 Jan 2018Main registration: Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/180130/002241); completion date 1 Mar 2018 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Oct 2017Main registration: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Plot loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
The Woods Of East FAQs
What plot sizes are available in The Woods Of East?
Plot sizes vary by phase. Phase VII offers 30×50 (1,500 sq ft), 30×55 (1,650 sq ft), 44×50 (2,200 sq ft), and 44×55 (2,420 sq ft) plots, plus 7 odd-sized plots and 4 EWS plots. Phase VIII offers 30×50 (1,500 sq ft), 25×30 (750 sq ft), and 40×50 (2,000 sq ft) plots, plus 13 odd-sized plots.
How many plots does The Woods Of East have?
Phase VII has 44 plots (20 of 30×50, 10 of 30×55, 2 of 44×50, 1 of 44×55, 7 odd-sized, and 4 EWS). Phase VIII has 67 plots (39 of 30×50, 8 of 25×30, 7 of 40×50, and 13 odd-sized). The main registration and Phase III phases do not specify individual plot counts in the RERA record.
Who approved the layout for The Woods Of East?
BDA (Bangalore Development Authority) approved the layout for all phases of The Woods Of East.
How many land conversion orders are there for The Woods Of East?
Phase VII has 3 land conversion orders. Phase VIII also has 3 land conversion orders. Land conversion orders for the main registration and Phase III are not in the RERA record.
What are the RERA registration numbers for The Woods Of East?
The project has 4 RERA registrations: PRM/KA/RERA/1251/308/PR/180130/002241 (main registration), PRM/KA/RERA/1251/446/PR/190504/002541 (Phase 3), PRM/KA/RERA/1251/446/PR/130723/006055 (Phase VII), and PRM/KA/RERA/1251/446/PR/180725/007935 (Phase VIII).
What are the completion dates for The Woods Of East phases?
Main registration: 1 March 2018. Phase 3: 30 September 2021 (with Covid extension). Phase VII: 31 March 2024. Phase VIII: 31 December 2025.
Are there any RERA complaints against The Woods Of East or the developer?
There are no RERA complaints on this project. There are also no RERA complaints against Odion Developers & Developers across all their projects on record.
Where is The Woods Of East located?
The project is in Chikkanayakanahalli, Anekal taluk, Bengaluru Urban district. The PIN code is not in the RERA record.
How many projects does the developer have on RERA record?
Odion Developers & Developers has 2 projects in the Karnataka RERA Bengaluru record.
What is the total land area of The Woods Of East?
The main registration covers 43,655 sq metres. Phase 3 covers 11,580 sq metres. Phase VII and Phase VIII land areas are not specified separately in the RERA record.
Written by AI from the RERA record above on 7 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about The Woods Of East
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a plot from Odion Builders & Developers? Review the developer.
Reviews of Odion Builders & Developers by verified buyers
No verified reviews of Odion Builders & Developers yet. If you bought a plot from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.
Similar projects within 5 km
| Project | Distance | Plots | Completion (RERA) | Developed | Complaints | Price |
|---|---|---|---|---|---|---|
| Adarsh EuphoriaShivakar Developers Private Limited | 1 km | 205 | Jun 2026extended | 92% | 2 | Not collected |
| Assetz Inspira Melodies of LifeIinspira Worldcity Projects Private Limited | 1.1 km | 505 | Aug 2026 | 100% | 0 | Not collected |
| Adarsh Forest GlenAkarshak Realty Private Limited | 2.3 km | 214 | Nov 2027 | 12% | 0 | Not collected |
| Central AvenueM/s. Pionier PProject | 2.4 km | 46 | Nov 2027 | — | 2 | Not collected |
| Pionier DaffodilPionier PProject | 2.6 km | 29 | Dec 2027 | — | 0 | Not collected |
| GreenbayPionier Pproject | 2.6 km | 32 | May 2028 | — | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.
Sources and last checked dates
Collected on 4 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/308/PR/180130/002241, PRM/KA/RERA/1251/446/PR/190504/002541, PRM/KA/RERA/1251/446/PR/130723/006055, PRM/KA/RERA/1251/446/PR/180725/007935.
- RERA record last checked: 4 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 18 Jul 2025
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Kodathi–Carmelaram
Thindlu, Kodathi–CarmelaramUnder constructionRERA registeredBuyers’ group openBluejay Ananda
by Varaha Land
Price: Price on requestGet brochure & price →
- 30×40, 30×50
- 796 – 9,976 sq ft plots
- Approved by BMRDA
- Jan 2027
140 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Bluejay Ananda
P Halanayakanahalli, near Harlur RoadUnder constructionRERA registeredBuyers’ group openAdarsh Euphoria
by Shivakar
Price: Price on requestGet brochure & price →
- 20×30, 30×40, 30×50
- 503 – 5,714 sq ft plots
- Approved by BDA
- Jun 2026 (extended)
RERA not updated since promised Jun 2026 · 205 plots · 2 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Adarsh Euphoria- K.G. Choodasandra, near Kodathi–Carmelaram© Esri, Maxar, Earthstar GeographicsReady to moveRERA registeredBuyers’ group open
Assetz Inspira Melodies of Life
by Iinspira Worldcity
Price: Price on requestGet brochure & price →
- 20×30, 30×40, 30×50 +2 more
- 600 – 7,539 sq ft plots
- Approved by BDA
- Aug 2026
505 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Assetz Inspira Melodies of Life