Skip to content
Log in

Urban Village

1 & 2 BHK apartments by D Damodar Naidu · Old Madras Road, Bengaluru

Old Madras Road, BengaluruOpen on Google Maps (opens in a new tab)

  • Completion filed with RERA
  • RERA registered
  • residential

Ready homes still available: 9 of 33 homes were unsold when the builder filed completion with RERA (27 Jul 2026). Some may have sold since — join the group and we’ll ask the builder what is left and for a group price.

by D Damodar Naidu

Price: Price on request

Get brochure, floor plans & price

Brochure, floor plans and price list for Urban Village

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

Urban Village is a residential project by D Damodar Naidu in Bengaluru with 33 homes, registered with Karnataka RERA. The completion date on RERA is 30 Jun 2026.

Not in the RERA record we collected yet: locality. This page fills in as the record is collected.

Facts collected on 4 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

Urban Village buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks D Damodar Naidu for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the Urban Village buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 4 Oct 2026
Home types
1 BHK, 2 BHK, 2.5 BHK
Carpet area
472 – 861 sq ft
Towers
1
Floors
3
Total homes
33
Land
0.4 acres
Possession (extended)
Jun 2026
Built (RERA update)
100%

Urban Village RERA number and registration details

RERA number
PRM/KA/RERA/1251/446/PR/040524/006850
Registered on
4 May 2024
Promised completion
30 Jun 2025
Extended to
30 Jun 2026
RERA status
Completed
Homes booked
12 of 33 as on
Price
Not found in public records yet: price
Project type
Residential

Towers and blocks (RERA filing)

TowerFloorsBasementsHomes
Urban Village 13033

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

Urban Village is a residential project by D Damodar Naidu in Bengaluru East with 33 flats in 1 tower of 3 floors. The project was registered with RERA on 4 May 2024 with an original completion date of 30 June 2025, extended to 30 June 2026. As of Q4 2025-26, construction is 100% complete and 12 homes are booked.

Written by AI from the RERA record above on 5 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
42.1% of land
Water and power
Water source filed with RERA: BoreWell,Local Authority
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA)
HDFC, Bhattarahalli
Building plan (RERA)
BDA - Bangalore Development Authority · No. 39/2023-2024 · dated 7 Dec 2023
Project cost declared to RERA
₹9.23 Cr

Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

  • Electricity
  • Power Backup
  • Water and Sanitation

Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Urban Village location and address

Address
Kannamangala Main Rd, next to MIMS ARDENDALE PHASE-2, Jaybhamnagara, , Kannamangala, Bengaluru, Karnataka 560036 , Bengaluru East , Bengaluru Urban, Karnataka - 560036
Village (RERA)
Not found in public records yet: village
Locality
Old Madras RoadAlso known as OMR, Old Madras Road
PIN code
560036
City
Bengaluru
State
Karnataka
Coordinates
13.02667, 77.76757

Distances to landmarks

Not found in public records yet: landmarks

About Old Madras Road

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)5.41 kmapprox. 22 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)14.78 kmapprox. 60 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)16.18 kmapprox. 66 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)20.53 kmapprox. 83 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)22.12 kmapprox. 90 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)22.6 kmapprox. 92 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 7Schools and colleges7 schools, 0 colleges, 0 kindergartens
  • 1Hospitals and clinics1 hospitals, 0 clinics

Nearest schools and colleges

  • Chrysalis High School · 0.34 km
  • Narayana e-Techno School · 1.73 km
  • National Public School ITPL · 1.78 km

Nearest hospitals and clinics

  • Kannamangala Primary Health Center · 0.95 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Whitefield (Kadugodi) (ವೈಟ್‌ಫೀಲ್ಡ್ (ಕಾಡುಗೋಡಿ))Open now — nearest operating metro station3.59 km
  • Whitefield (ವೈಟ್‌ಫೀಲ್ಡ್)Nearest railway station3.43 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Kannamangala Lake, 657 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Urban Village home types and carpet areas

Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.

Get brochure, floor plans & price

Brochure, floor plans and price list for Urban Village

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Home typeCarpet areaHomes
1 BHK472 sq ft1
2 BHK735 – 767 sq ft21
2.5 BHK716 – 861 sq ft11
Flat765 sq ft33

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Urban Village possession date and construction status

  • Whole project (promoter’s RERA update)100%

    as on · 12 of 33 homes booked

Promoter’s quarterly update to RERA for Q4 2025-26, submitted 2026-06-12.

Units sold and unsold, from RERA (Q4 2025-26)

TypeHomesBookedAvailable
1 BHK110
2 BHK21912
2.5 BHK1129

As reported by the promoter in the quarterly update to RERA, not verified by us.

Timeline

  1. 28 Dec 2023Project start date given to RERA
  2. 4 May 2024Registered with Karnataka RERA
  3. 30 Jun 2025Completion date given at registration
  4. 30 Jun 2026Section 6 Extension: completion date moved to this date
  5. 27 Jul 2026Promoter applied to RERA for completion

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Approvals and documents checklist

12 rows: approvals. Scroll inside the table to see them all.

ApprovalAuthoritySource
Building planBDA - Bangalore Development Authority · No. 39/2023-2024 · dated 2023-12-07Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversionBDA · No. ALN(EBK)SR/20/2017-18 · dated 2018-02-14Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificatescan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Electricity Permission Letterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Water Permission Letterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building/Plotting Planscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Change of Land Usescan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Conversion Certificate under section 95 of the KLR Act 1964scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricityscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Waterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approval/NOC under section 109 of KLR Act 1961scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCBscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA

As on 4 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BDA - Bangalore Development Authority · No. 39/2023-2024 · dated 7 Dec 2023
  • Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Environment clearance · SEIAA KarnatakaNot on RERA yet
  • Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
  • Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Height clearance · Airports Authority of IndiaNot on RERA yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet

From the documents the promoter uploaded to Karnataka RERA, collected 4 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Urban Village RERA complaints

No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About D Damodar Naidu

Promoter type
Proprietorship
Projects on this site
1
RERA complaints against promoter
0
Company number (CIN)
Not found in public records yet: CIN

From Karnataka RERA, as collected so far (4 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

D Damodar Naidu’s RERA record

D Damodar Naidu delivery record

As on 5 Oct 2026
  • 1Projects in Bengaluru on RERA1 approved registration under D Damodar Naidu in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
  • 33Homes registeredAs stated in each registrations.
  • 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
  • 0Complaints per 1,000 homes0 complaints ÷ 33 homes in its 1 registration on Karnataka RERA in Bengaluru.
  • 1Completion filed on RERARegistrations where the promoter applied to RERA for completion; 1 with an occupancy certificate on RERA.
  • 0 of 1Filed by the date given at registrationMedian gap 12.9 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.

Completion filed on RERA

ProjectDate at registrationCompletion filedGap
Urban VillageOC on RERA30 Jun 2025extended to 30 Jun 202627 Jul 202613 months after

Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Dec 2023

As on 4 Oct 2026
  1. 27 Jul 2026Promoter applied to RERA for completion (occupancy certificate on RERA) Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 30 Jun 2026Completion date extended to 30 Jun 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 12 Jun 2026Quarterly update filed for Q4 2025-26: 100% built, 12 of 33 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 11 Feb 2026Quarterly update filed for Q3 2025-26: 70% built, 9 of 33 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 4 May 2024Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/040524/006850); completion date 30 Jun 2025 Source (rera.karnataka.gov.in) (opens in a new tab)
  6. 28 Dec 2023Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  7. 7 Dec 2023Building plan approved by BDA - Bangalore Development Authority (No. 39/2023-2024) Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

How we calculate this

Urban Village FAQs

What is Urban Village and who is building it?

Urban Village is a residential project by D Damodar Naidu (proprietorship) located in Bengaluru East, PIN 560036.

How many homes are in Urban Village?

The project has 33 flats total.

What types of homes are available in Urban Village?

The project has 2 BHK homes (21 units, carpet area 735-767 sq ft), 2.5 BHK homes (11 units, carpet area 716-861 sq ft), and 1 BHK home (1 unit, carpet area 472 sq ft).

What is the carpet area of homes in Urban Village?

Carpet areas range from 472 sq ft for 1 BHK homes to 861 sq ft for 2.5 BHK homes.

When will Urban Village be completed?

The completion date on RERA is 30 June 2026. This was extended from the original completion date of 30 June 2025 under Section 6 Extension.

What is the RERA registration number for Urban Village?

The RERA registration number is PRM/KA/RERA/1251/446/PR/040524/006850, registered on 4 May 2024.

What is the construction status of Urban Village?

As of Q4 2025-26 (quarter ended 31 March 2026), construction is 100% complete, and 12 homes are booked out of 33.

Has Urban Village received an occupancy certificate?

Yes, an occupancy certificate has been uploaded to RERA.

Are there any RERA complaints against Urban Village or the builder?

There are no RERA complaints on this project or against the builder D Damodar Naidu.

Which bank holds the escrow for Urban Village?

HDFC is the escrow bank for Urban Village.

Written by AI from the RERA record above on 5 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Urban Village

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from D Damodar Naidu? Review the builder.

Reviews of D Damodar Naidu by verified buyers

No verified reviews of D Damodar Naidu yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
NirvanaM/s Virtue Infracon0.2 km40Mar 2026100%0Not collected
Assetz MarqAssetz Whitefield Homes Private Limited0.4 km2,148Jul 2027extended—7Not collected
Royal ViewGreen Edge Developers0.5 km237Dec 2026—0Not collected
Ruchira Park EastRuchira Developers LLP0.9 km284Jan 202769%0Not collected
Platinum East WoodsPlatinum - Narya Infra0.9 km188Mar 202762%0Not collected
Silver HorizonGreen Edge Infracon1 km217Aug 2030—0Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 4 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/040524/006850.

  • RERA record last checked: 4 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 12 Jun 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error

More new projects in Old Madras Road

  • Nirvana: Site photo filed with Karnataka RERAKannamangala, Old Madras RoadReady to moveRERA registeredBuyers’ group open

    Nirvana

    by M/s Virtue Infracon

    Price: Price on requestGet brochure & price →

    • 2 BHK, 3 BHK
    • 746 – 1,095 sq ft
    • Mar 2026

    40 homes

    Be one of the first 10 buyers in this groupFounding members — it’s free

    Join group for Nirvana
  • Assetz Marq: Township exterior view with modern architecture (artist’s impression)Kannamangala, Old Madras RoadArtist’s impressionUnder constructionRERA registeredBuyers’ group open

    Assetz Marq

    by Assetz Whitefield Homes

    Price: Price on requestGet brochure & price →

    • Studio, 1 BHK, 2 BHK, 3 BHK, +1 more
    • 213 – 1,612 sq ft
    • Jul 2027 (extended)

    4 phases on RERA · 2,148 homes · 7 RERA complaints

    Be one of the first 10 buyers in this groupFounding members — it’s free

    Join group for Assetz Marq
  • Kannamangala, Old Madras Road© Esri, Maxar, Earthstar GeographicsUnder constructionRERA registeredBuyers’ group open

    Royal View

    by Green Edge

    Price: Price on requestGet brochure & price →

    • 2 BHK, 3 BHK, 4 BHK
    • 977 – 2,708 sq ft
    • Dec 2026

    237 homes

    Be one of the first 10 buyers in this groupFounding members — it’s free

    Join group for Royal View