Ready homes still available: 9 of 33 homes were unsold when the builder filed completion with RERA (27 Jul 2026). Some may have sold since — join the group and we’ll ask the builder what is left and for a group price.
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Urban Village at a glance
- Possession (RERA)Jun 2026 ExtendedWas Jun 2025 · Karnataka RERA
- Construction100% builtPromoter’s RERA update · as on 31 Mar 2026
- Homes booked12 of 33 (36%)RERA update · as on 31 Mar 2026
- RERA complaints (project)None listedKarnataka RERA · as on 4 Oct 2026
- Approvals filed5 of 9 on RERAKarnataka RERA uploads · 4 Oct 2026
- Nearest metroWhitefield (Kadugodi) · 3.59 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 83 min at peak20.53 km straight line · estimate
- Nearest lakeKannamangala Lake · 657 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Urban Village is a residential project by D Damodar Naidu in Bengaluru with 33 homes, registered with Karnataka RERA. The completion date on RERA is 30 Jun 2026.
Not in the RERA record we collected yet: locality. This page fills in as the record is collected.
Facts collected on 4 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Urban Village buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks D Damodar Naidu for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Urban Village buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 1 BHK, 2 BHK, 2.5 BHK
- Carpet area
- 472 – 861 sq ft
- Towers
- 1
- Floors
- 3
- Total homes
- 33
- Land
- 0.4 acres
- Possession (extended)
- Jun 2026
- Built (RERA update)
- 100%
Urban Village RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/446/PR/040524/006850
- Registered on
- 4 May 2024
- Promised completion
- 30 Jun 2025
- Extended to
- 30 Jun 2026
- RERA status
- Completed
- Homes booked
- 12 of 33 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| Urban Village 1 | 3 | 0 | 33 |
A dash (—) means the filing did not state that value.
Summary in plain English
Urban Village is a residential project by D Damodar Naidu in Bengaluru East with 33 flats in 1 tower of 3 floors. The project was registered with RERA on 4 May 2024 with an original completion date of 30 June 2025, extended to 30 June 2026. As of Q4 2025-26, construction is 100% complete and 12 homes are booked.
Written by AI from the RERA record above on 5 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 42.1% of land
- Water and power
- Water source filed with RERA: BoreWell,Local Authority
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- HDFC, Bhattarahalli
- Building plan (RERA)
- BDA - Bangalore Development Authority · No. 39/2023-2024 · dated 7 Dec 2023
- Project cost declared to RERA
- ₹9.23 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Urban Village location and address
- Address
- Kannamangala Main Rd, next to MIMS ARDENDALE PHASE-2, Jaybhamnagara, , Kannamangala, Bengaluru, Karnataka 560036 , Bengaluru East , Bengaluru Urban, Karnataka - 560036
- Village (RERA)
- Not found in public records yet: village
- Locality
- Old Madras RoadAlso known as OMR, Old Madras Road
- PIN code
- 560036
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.02667, 77.76757
Distances to landmarks
Not found in public records yet: landmarksAbout Old Madras Road
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 5.41 km | approx. 22 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 14.78 km | approx. 60 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 16.18 km | approx. 66 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 20.53 km | approx. 83 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 22.12 km | approx. 90 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 22.6 km | approx. 92 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 7Schools and colleges7 schools, 0 colleges, 0 kindergartens
- 1Hospitals and clinics1 hospitals, 0 clinics
Nearest schools and colleges
- Chrysalis High School · 0.34 km
- Narayana e-Techno School · 1.73 km
- National Public School ITPL · 1.78 km
Nearest hospitals and clinics
- Kannamangala Primary Health Center · 0.95 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Whitefield (Kadugodi) (ವೈಟ್ಫೀಲ್ಡ್ (ಕಾಡುಗೋಡಿ))Open now — nearest operating metro station3.59 km
- Whitefield (ವೈಟ್ಫೀಲ್ಡ್)Nearest railway station3.43 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Kannamangala Lake, 657 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Kannamangala Lake on OpenStreetMap (opens in a new tab) (ಕನ್ನಮಂಗಲ ಕೆರೆ)657 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,176 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,871 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Urban Village home types and carpet areas
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 1 BHK | 472 sq ft | 1 |
| 2 BHK | 735 – 767 sq ft | 21 |
| 2.5 BHK | 716 – 861 sq ft | 11 |
| Flat | 765 sq ft | 33 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Urban Village possession date and construction status
Promoter’s quarterly update to RERA for Q4 2025-26, submitted 2026-06-12.
Units sold and unsold, from RERA (Q4 2025-26)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 1 BHK | 1 | 1 | 0 |
| 2 BHK | 21 | 9 | 12 |
| 2.5 BHK | 11 | 2 | 9 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 28 Dec 2023Project start date given to RERA
- 4 May 2024Registered with Karnataka RERA
- 30 Jun 2025Completion date given at registration
- 30 Jun 2026Section 6 Extension: completion date moved to this date
- 27 Jul 2026Promoter applied to RERA for completion
Approvals and documents checklist
12 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan | BDA - Bangalore Development Authority · No. 39/2023-2024 · dated 2023-12-07 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion | BDA · No. ALN(EBK)SR/20/2017-18 · dated 2018-02-14 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approval/NOC under section 109 of KLR Act 1961 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BDA - Bangalore Development Authority · No. 39/2023-2024 · dated 7 Dec 2023
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet
From the documents the promoter uploaded to Karnataka RERA, collected 4 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Urban Village RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About D Damodar Naidu
- Promoter type
- Proprietorship
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (4 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
D Damodar Naidu’s RERA recordD Damodar Naidu delivery record
- 1Projects in Bengaluru on RERA1 approved registration under D Damodar Naidu in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 33Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 33 homes in its 1 registration on Karnataka RERA in Bengaluru.
- 1Completion filed on RERARegistrations where the promoter applied to RERA for completion; 1 with an occupancy certificate on RERA.
- 0 of 1Filed by the date given at registrationMedian gap 12.9 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| Urban VillageOC on RERA | 30 Jun 2025extended to 30 Jun 2026 | 27 Jul 2026 | 13 months after |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Dec 2023
- 27 Jul 2026Promoter applied to RERA for completion (occupancy certificate on RERA) Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 Jun 2026Completion date extended to 30 Jun 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Jun 2026Quarterly update filed for Q4 2025-26: 100% built, 12 of 33 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 Feb 2026Quarterly update filed for Q3 2025-26: 70% built, 9 of 33 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 4 May 2024Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/040524/006850); completion date 30 Jun 2025 Source (rera.karnataka.gov.in) (opens in a new tab)
- 28 Dec 2023Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 7 Dec 2023Building plan approved by BDA - Bangalore Development Authority (No. 39/2023-2024) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Urban Village FAQs
What is Urban Village and who is building it?
Urban Village is a residential project by D Damodar Naidu (proprietorship) located in Bengaluru East, PIN 560036.
How many homes are in Urban Village?
The project has 33 flats total.
What types of homes are available in Urban Village?
The project has 2 BHK homes (21 units, carpet area 735-767 sq ft), 2.5 BHK homes (11 units, carpet area 716-861 sq ft), and 1 BHK home (1 unit, carpet area 472 sq ft).
What is the carpet area of homes in Urban Village?
Carpet areas range from 472 sq ft for 1 BHK homes to 861 sq ft for 2.5 BHK homes.
When will Urban Village be completed?
The completion date on RERA is 30 June 2026. This was extended from the original completion date of 30 June 2025 under Section 6 Extension.
What is the RERA registration number for Urban Village?
The RERA registration number is PRM/KA/RERA/1251/446/PR/040524/006850, registered on 4 May 2024.
What is the construction status of Urban Village?
As of Q4 2025-26 (quarter ended 31 March 2026), construction is 100% complete, and 12 homes are booked out of 33.
Has Urban Village received an occupancy certificate?
Yes, an occupancy certificate has been uploaded to RERA.
Are there any RERA complaints against Urban Village or the builder?
There are no RERA complaints on this project or against the builder D Damodar Naidu.
Which bank holds the escrow for Urban Village?
HDFC is the escrow bank for Urban Village.
Written by AI from the RERA record above on 5 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Urban Village
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from D Damodar Naidu? Review the builder.
Reviews of D Damodar Naidu by verified buyers
No verified reviews of D Damodar Naidu yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| NirvanaM/s Virtue Infracon | 0.2 km | 40 | Mar 2026 | 100% | 0 | Not collected |
| Assetz MarqAssetz Whitefield Homes Private Limited | 0.4 km | 2,148 | Jul 2027extended | — | 7 | Not collected |
| Royal ViewGreen Edge Developers | 0.5 km | 237 | Dec 2026 | — | 0 | Not collected |
| Ruchira Park EastRuchira Developers LLP | 0.9 km | 284 | Jan 2027 | 69% | 0 | Not collected |
| Platinum East WoodsPlatinum - Narya Infra | 0.9 km | 188 | Mar 2027 | 62% | 0 | Not collected |
| Silver HorizonGreen Edge Infracon | 1 km | 217 | Aug 2030 | — | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 4 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/040524/006850.
- RERA record last checked: 4 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 12 Jun 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Old Madras Road
Kannamangala, Old Madras RoadReady to moveRERA registeredBuyers’ group openNirvana
by M/s Virtue Infracon
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 746 – 1,095 sq ft
- Mar 2026
40 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Nirvana
Kannamangala, Old Madras RoadArtist’s impressionUnder constructionRERA registeredBuyers’ group openAssetz Marq
by Assetz Whitefield Homes
Price: Price on requestGet brochure & price →
- Studio, 1 BHK, 2 BHK, 3 BHK, +1 more
- 213 – 1,612 sq ft
- Jul 2027 (extended)
4 phases on RERA · 2,148 homes · 7 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Assetz Marq- Kannamangala, Old Madras Road© Esri, Maxar, Earthstar GeographicsUnder constructionRERA registeredBuyers’ group open
Royal View
by Green Edge
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK, 4 BHK
- 977 – 2,708 sq ft
- Dec 2026
237 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Royal View