DS Max Sky Blossom
2 & 3 BHK apartments by DS-Max Properties Private Limited · Begur Road, Bengaluru
Begur Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
DS Max Sky Blossom at a glance
- Possession (RERA)Feb 2029Karnataka RERA
- Construction40% built · on pace for Aug 2030 17 mo after RERA dateRERA filing to 30 Sep 2026; estimate from average pace
- Homes booked137 of 255 (54%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 21 Oct 2026
- Builder on-time record17 of 21 on time Some lateCompleted projects: OC date vs promised date
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 21 Oct 2026
- Nearest metroSingasandra · 1.6 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 152 min at peak37.5 km straight line · estimate
- Nearest lakeBegur Lake · 320 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
DS Max Sky Blossom is a residential project by DS-Max Properties Private Limited in Bengaluru with 255 homes, registered with Karnataka RERA. The completion date on RERA is 28 Feb 2029.
Not in the RERA record we collected yet: locality. This page fills in as the record is collected.
Facts collected on 21 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
DS Max Sky Blossom buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks DS-Max Properties for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the DS Max Sky Blossom buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK
- Carpet area
- 687 – 1,046 sq ft
- Towers
- 1
- Floors
- 14
- Total homes
- 255
- Land
- 1.52 acres
- Possession (RERA)
- Feb 2029
- Built (RERA update)
- 40%
DS Max Sky Blossom RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/310/PR/210324/006724
- Registered on
- 21 Mar 2024
- Promised completion
- 28 Feb 2029
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 137 of 255 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| SKY BLOSSOM | 14 | 2 | 255 |
A dash (—) means the filing did not state that value.
Summary in plain English
DS Max Sky Blossom is a residential project by DS-Max Properties Private Limited in Bengaluru South with 255 homes across 1 tower. The project has 3 BHK and 2 BHK homes and is registered with Karnataka RERA for completion on 28 February 2029.
Written by AI from the RERA record above on 21 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 81.4% of land
- Water and power
- Water source filed with RERA: BoreWell,BWSSB
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- STATE BANK OF INDIA, SME Mahadevapura Bengaluru
- Building plan (RERA)
- BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/CC/9220/23-24 · dated 6 Dec 2023
- Project cost declared to RERA
- ₹80.12 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Community Hall
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
DS Max Sky Blossom location and address
- Address
- SITE/ KHATHA NO: 29 SY NO 134/3, BEGUR , BOMMANAHALLI ZONE , B-LURU .IN WARD NO: 192 , Bengaluru South , Bengaluru Urban, Karnataka - 560068
- Village (RERA)
- Not found in public records yet: village
- Locality
- Begur RoadAlso known as Begur, Begur Main Road, Begur Koppa Road
- PIN code
- 560068
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.87034, 77.63479
Distances to landmarks
Not found in public records yet: landmarksAbout Begur Road
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 4 km | approx. 16 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 7.78 km | approx. 32 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 13.92 km | approx. 56 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 17.17 km | approx. 70 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 19.84 km | approx. 80 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 37.5 km | approx. 152 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 27Schools and colleges23 schools, 1 colleges, 3 kindergartens
- 10Hospitals and clinics5 hospitals, 5 clinics
Nearest schools and colleges
- Cresent Eng School, Begur · 0.15 km
- Little Angel Eng School, Begur · 0.35 km
- GLPS Subhash Nagar, Begur · 0.4 km
Nearest hospitals and clinics
- Apollo Clinic · 0.78 km
- Health Gate Diagnostics & Multi-speciality clinic · 1.05 km
- Sri Sapthagiri Clinic · 1.16 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Singasandra (ಸಿಂಗಸಂದ್ರ)Open now — nearest operating metro station1.6 km
- Huskuru (ಹುಸ್ಕೂರ್)Nearest railway station8.29 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Begur Lake, 320 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Begur Lake on OpenStreetMap (opens in a new tab) (ಬೇಗೂರು ಕೆರೆ)320 m
- Basapura Lake on OpenStreetMap (opens in a new tab) (ಬಸಪುರ ಕೆರೆ)865 m
- Begur Kere on OpenStreetMap (opens in a new tab) 1,039 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
DS Max Sky Blossom home types and carpet areas
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved building plan4 pages

Approved Building/Plotting PlanFull PDF on RERA
Approved layout plan3 files

6 Village Map DemarcationFiled 15 Mar 2024 · Full PDF on RERA 
7 Location DemarcationFiled 15 Mar 2024 · Full PDF on RERA 
STP Demarcation.pdfFull PDF on RERA
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 687 – 759 sq ft | 105 |
| 3 BHK | 845 – 1,046 sq ft | 150 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
DS Max Sky Blossom possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-09.
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2 BHK | 105 | 64 | 41 |
| 3 BHK | 150 | 73 | 77 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 1 Mar 2024Project start date given to RERA
- 21 Mar 2024Registered with Karnataka RERA
- 28 Feb 2029Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Aug 2030 — about 17 months after the completion date on RERA (28 Feb 2029).
At the pace between the 4 quarterly filings we have (25% → 40% in 9 months), it would be around Sep 2029 — about 7 months after the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 9 Oct 2026 | 40% | 137 of 255 |
| Q1 2026-27to 30 Jun 2026 | 14 Jul 2026 | 30% | 125 of 255 |
| Q4 2025-26to 31 Mar 2026 | 13 Apr 2026 | 25% | 112 of 255 |
| Q3 2025-26to 31 Dec 2025 | 12 Jan 2026 | 25% | 99 of 255 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 40% ÷ 31 months (1 Mar 2024 to 30 Sep 2026) = 1.3% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 60 ÷ 1.3 = 46.5 months → Aug 2030. This is an estimate, not a date from the builder or RERA.
Pace between filings = (40% − 25%) ÷ 9 months = 1.7% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-09.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
13 rows: approvals. Scroll inside the table to see them all.
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/CC/9220/23-24 · dated 6 Dec 2023
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 21 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
DS Max Sky Blossom RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About DS-Max Properties
- Founded
- 2007
- Headquarters
- Bengaluru
- Bengaluru projects
- 44
- Delivered on time
- 17 of 21
- RERA complaints
- 19
- Court cases listed
- 6
DS Max Properties Private Limited (CIN U70102KA2007PTC041508) has 44 projects registered with Karnataka RERA in the Bengaluru area. Of the 21 whose records show an occupancy certificate, 17 got it on or before the completion date promised at registration, 3 got it after that date but within a COVID-19 extension, and Sky Grand got it two days after its extended date; Sunworth, Sovereign and Sahara show no OC although their dates have passed. Karnataka RERA lists 19 complaints against the promoter (14 disposed), mostly about late handover, refunds and unregistered sale agreements, and the court cases found include a 2024 High Court order directing the builder to help form a flat owners' association at DS-Max Starnest.
DS-Max Properties’s full recordDS-Max Properties delivery record
- 24Projects in Bengaluru on RERA24 approved registrations under DS- Max Properties Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 10,303Homes registeredAs stated in each registrations.
- 19RERA complaints5 open, 14 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 1.8Complaints per 1,000 homes19 complaints ÷ 10,303 homes in its 24 registrations on Karnataka RERA in Bengaluru.
- 9Completion filed on RERARegistrations where the promoter applied to RERA for completion; 9 with an occupancy certificate on RERA.
- 3 of 9Filed by the date given at registrationMedian gap 10.1 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
- 6Court cases listedFound in public court records; see the list on the builder’s page.
What the complaints are about
19 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| DS Max ShrestaOC on RERA | 31 Jul 2026 | 25 Sep 2026 | 2 months after |
| DS Max Sky ShubhamOC on RERA | 31 Mar 2027 | 11 May 2026 | By the date |
| DS Max SenateOC on RERA | 30 Jun 2026 | 11 May 2026 | By the date |
| DS Max Stavam NestOC on RERA | 30 Jun 2026 | 11 May 2026 | By the date |
| DS-Max Sky SupremeOC on RERA | 31 Dec 2023extended to 30 Sep 2024 | 2 Feb 2026 | 25 months after |
| DS Max Sonata NestOC on RERA | 30 Jun 2024 | 2 Feb 2026 | 19 months after |
| DS Max SasmaraOC on RERA | 31 Dec 2024 | 2 Feb 2026 | 13 months after |
| Sky GrandOC on RERA | 31 Mar 2023extended to 30 Dec 2024 | 31 Jan 2026 | 34 months after |
| DS Max StavamOC on RERA | 31 Mar 2025 | 31 Jan 2026 | 10 months after |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Handovers we checked by hand
21 rows: handovers. Scroll inside the table to see them all.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)How we calculate this
What’s changed since Dec 2023
- 9 Oct 2026Quarterly update filed for Q2 2026-27: 40% built, 137 of 255 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jul 2026Quarterly update filed for Q1 2026-27: 30% built, 125 of 255 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Apr 2026Quarterly update filed for Q4 2025-26: 25% built, 112 of 255 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Jan 2026Quarterly update filed for Q3 2025-26: 25% built, 99 of 255 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 21 Mar 2024Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/210324/006724); completion date 28 Feb 2029 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Mar 2024Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 6 Dec 2023Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/CC/9220/23-24) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
DS Max Sky Blossom FAQs
What is the completion date for DS Max Sky Blossom?
The project is registered for completion on 28 February 2029.
How many homes are in DS Max Sky Blossom?
The project has 255 homes: 150 three-bedroom homes and 105 two-bedroom homes.
What are the carpet areas for homes in DS Max Sky Blossom?
The 3 BHK homes have carpet area between 845 and 1,046 sq ft. The 2 BHK homes have carpet area between 687 and 759 sq ft.
What is the RERA registration number for DS Max Sky Blossom?
The project registration number is PRM/KA/RERA/1251/310/PR/210324/006724, registered on 21 March 2024.
Where is DS Max Sky Blossom located?
The project is in Bengaluru South taluk, Bengaluru Urban district, PIN code 560068.
How many homes are booked in DS Max Sky Blossom?
As of Q2 2026-27 (ended 30 September 2026), 137 homes were booked out of 255 total homes.
What is the construction progress for DS Max Sky Blossom?
As of Q2 2026-27 (ended 30 September 2026), the project was 40% complete.
Are there any RERA complaints against DS Max Sky Blossom?
No complaints have been filed on this project with Karnataka RERA.
What is the escrow bank for DS Max Sky Blossom?
The project's escrow bank is State Bank of India.
Does the builder have other projects registered with Karnataka RERA?
DS-Max Properties Private Limited has 44 projects in the Bengaluru records and 19 RERA complaints against the builder across all projects.
Written by AI from the RERA record above on 21 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about DS Max Sky Blossom
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from DS-Max Properties? Review the builder.
Reviews of DS-Max Properties by verified buyers
No verified reviews of DS-Max Properties yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Assetz Canvas & Cove 2.0Apg Habitat Private Limited | 0 km | 617 | Apr 2029 | — | 0 | Not collected |
| Suraksha Whispering WavesR K Suraksha Properties | 0.1 km | 272 | Dec 2030 | 7% | 0 | Not collected |
| Memco Skyline - JutakuMemco Skyline Private Limited | 0.7 km | 647 | May 2031 | 5% | 0 | Not collected |
| K&T'S Sai SannidhiK & T Constructions | 0.8 km | 40 | Dec 2025 | 100% | 0 | Not collected |
| Mahindra NewhavenMahindra Lifespace Developers Limited | 0.8 km | 119 | Dec 2029 | 8% | 0 | Not collected |
| Mahindra ZenMahindra Lifespace Developers Limited | 0.8 km | 228 | Dec 2028 | 61% | 1 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 21 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/310/PR/210324/006724.
- RERA record last checked: 21 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 10 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Begur Road
Begur RoadUnder constructionRERA registeredBuyers’ group openAssetz Canvas & Cove 2.0
by Apg Habitat
Price: Price on requestGet brochure & price →
- Studio, 3 BHK
- 277 – 1,281 sq ft
- Apr 2029
2 phases on RERA · 617 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Assetz Canvas & Cove 2.0
Begur RoadUnder constructionRERA registeredBuyers’ group openSuraksha Whispering Waves
by R K Suraksha Properties
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK, 4 BHK
- 845 – 1,273 sq ft
- Dec 2030
272 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Suraksha Whispering Waves
Begur RoadUnder constructionRERA registeredBuyers’ group openPrestige Southern Star
by Prestige Acres
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 3 BHK, 4 BHK
- 437 – 1,672 sq ft
- Sep 2029
2,130 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Prestige Southern Star