Skip to content
Log in

DS Max Sky Fields

2 & 3 BHK apartments by DS-Max Properties · near Kadugodi–Hope Farm, Bengaluru

Near Kadugodi–Hope Farm, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • apartments

by DS-Max Properties

Listed price: From ₹92.47 L

as on · Source (dsmaxproperties.com) (opens in a new tab)

Get today’s price list

Latest price for DS Max Sky Fields

Builders change prices often and rarely publish them. Tell us how to reach you and we’ll send you the current price list.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

DS Max Sky Fields is a single-tower project of 870 apartments (454 2 BHK, 416 3 BHK) on about 4.9 acres off Soukya Road near Whitefield, registered with Karnataka RERA on 25 October 2024 with a promised completion date of 30 September 2030. Carpet areas are 647-741 sq ft for 2 BHK and 745-1,023 sq ft for 3 BHK; the builder's site priced homes from Rs 92.47 lakh at Rs 7,700 per sq ft of super built-up area. In its June 2026 quarterly update the builder reported 31% completion and 239 units booked, and one refund complaint was filed with RERA in September 2026.

Not in the RERA record we collected yet: locality. This page fills in as the record is collected.

Facts collected on 18 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

DS Max Sky Fields buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks DS-Max Properties for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the DS Max Sky Fields buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 18 Oct 2026
Home types
2 BHK, 3 BHK
Carpet area
647 – 1,023 sq ft
Towers
1
Floors
14
Total homes
870
Land
4.94 acres
Possession (RERA)
Sep 2030
Built (RERA update)
38%

RERA record: one tower, 'No. of Floors' 14 with units listed on floors 0 to 14 (58 per floor), 2 basements, 17 superstructure slabs, height 43.95 m. The builder's site says G+14.

DS Max Sky Fields RERA number and registration details

RERA number
PRM/KA/RERA/1250/304/PR/251024/007179
Registered on
25 Oct 2024
Promised completion
30 Sep 2030
Extended to
No extension recorded
RERA status
New launch
Homes booked
245 of 870 as on
Price
From ₹92.47 L as on
Project type
Apartments

Towers and blocks (RERA filing)

TowerFloorsBasementsHomes
Tower 1142870

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

DS Max Sky Fields price list

From the builder’s website, as on 4 Oct 2026
Home typeSizePrice₹ per sq ftSource
2 BHK1,201 – 1,207 sq ftsuper built-upFrom ₹92.47 Lonwards₹7,700Source (dsmaxproperties.com) (opens in a new tab)
3 BHK1,388 – 1,738 sq ftsuper built-upFrom ₹1.06 Cronwards₹7,700Source (dsmaxproperties.com) (opens in a new tab)

prices onwards, excl. registration & taxes

As published by the builder on the date shown — not an offer, and not checked with the builder. Check whether the size is carpet or super built-up area before comparing.

Sources:Source (dsmaxproperties.com) (opens in a new tab)

Price per sq ft vs projects within 5 km

As on 4 Oct 2026

The builder’s published prices work out to about ₹10,400 – ₹14,300 per sq ft of carpet area.

Home typeBuilder priceCarpet area (RERA)₹ per sq ft carpet
2 BHKfrom ₹92.47 Lseen 4 Oct 2026647 – 741 sq ft₹12,500 – ₹14,300
3 BHKfrom ₹1.06 Crseen 4 Oct 2026745 – 1,023 sq ft₹10,400 – ₹14,200

Worked out as the builder’s “from” price ÷ the largest and smallest carpet area RERA lists for that home type — we don’t know which unit the starting price is for. Builders usually say taxes and other charges are extra. Builder price list (dsmaxproperties.com) (opens in a new tab) RERA carpet areas (rera.karnataka.gov.in) (opens in a new tab)

Sources:Source (dsmaxproperties.com) (opens in a new tab)Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

Price history

As on 4 Oct 2026

One snapshot so far: the builder’s “onwards” prices seen on 4 Oct 2026. Each new check of the builder’s website adds a dated point here, so rises and offers show up with their dates.

0₹25 L₹50 L₹75 L₹1 Cr₹1.3 CrOct 26NovDecJan 27FebMarAprMayJunJulAugSepLater checks will appear here2 BHK ₹92.47 L3 BHK ₹1.06 Cr
Seen onWherePrices
4 Oct 2026Builder’s website Source (dsmaxproperties.com) (opens in a new tab)2 BHK from ₹92.47 L · 3 BHK from ₹1.06 Cr

Sources:Source (dsmaxproperties.com) (opens in a new tab)

Summary in plain English

DS Max Sky Fields is a residential project by DS Max Properties Private Limited in Hosakote, Bengaluru Rural, with 870 homes in 1 tower. The project includes 416 three-bedroom and 454 two-bedroom homes. Completion is scheduled for 30 September 2030.

Written by AI from the RERA record above on 18 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
85.4% of land
Water and power
RERA record: water from borewell and the local authority (Samethanahalli Panchayat); water supply, sewage and drainage, fire safety and solid waste management marked applicable; rainwater harvesting, energy management and emergency evacuation marked not applicable. The builder's site lists power backup for common areas only.
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA)
Punjab National Bank, M G Road, Bengaluru
Building plan (RERA)
Local Planing Authority · No. STRRPA/TP/CC/439/23-24 · dated 6 Jul 2024
Project cost declared to RERA
₹153 Cr

Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

  • Swimming pool
  • Clubhouse
  • Multi-gym
  • Sauna and steam
  • Table tennis
  • Snooker
  • Foosball
  • Cricket practice net
  • Kids play area
  • Senior citizens gazebo
  • Covered car parking
  • CCTV cameras
  • 24/7 security
  • Sewage treatment plant

As listed by the builder; we have not visited the site.

Sources:Source (dsmaxproperties.com) (opens in a new tab)

Specifications and materials

StructureRCC frame with concrete block masonry wallsSource (dsmaxproperties.com) (opens in a new tab)
FlooringVitrified tiles in living, dining, bedrooms and kitchen; ceramic tiles in toilets; anti-skid ceramic in balconies and utility; granite or vitrified mix in the main lobby; cement concrete on the terraceSource (dsmaxproperties.com) (opens in a new tab)
ToiletsEuropean-style WC, hot and cold mixer with shower in every bathroom, wall tiles up to 7 ft, chrome-plated fittingsSource (dsmaxproperties.com) (opens in a new tab)
KitchenProvision for an electric chimney and a water purifierSource (dsmaxproperties.com) (opens in a new tab)
Doors and windowsHardwood main door; UPVC sliding windows or French doorsSource (dsmaxproperties.com) (opens in a new tab)
ElectricalTV and phone points in living room and master bedroom; AC provision in master bedroom; switches of Anchor, Havells, MK or ABB makeSource (dsmaxproperties.com) (opens in a new tab)
Power backupBackup for common areasSource (dsmaxproperties.com) (opens in a new tab)
PaintingOil-bound distemper or emulsion on walls; oil-bound distemper on ceilingsSource (dsmaxproperties.com) (opens in a new tab)

DS Max Sky Fields location and address

Address
Sy. No. 234/1, 234/2 and 234/3, Samethanahalli area off Soukya Road (Anugondanahalli hobli, Hosakote taluk, Bengaluru Rural district, PIN 560067), near Bangalore International Academy
Village (RERA)
Soukya Road, Whitefield
Locality
Near Kadugodi–Hope FarmAlso known as Kadugodi, Hope Farm
PIN code
560067
City
Bengaluru
State
Karnataka
Coordinates
12.99242, 77.79707

Distances to landmarks

  • Bangalore International Academy (school)School0.1 km
  • Whitefield (Kadugodi) metro station, Purple LineMetro4.3 km
  • Hopefarm Channasandra metro station, Purple LineMetro4.7 km
  • Kadugodi Tree Park metro station, Purple LineMetro5.5 km
  • Nexus Whitefield mallMall6.4 km
  • International Tech Park Bangalore (ITPB)Work6.5 km
  • Manipal Hospital WhitefieldHospital6.8 km
  • Kempegowda International AirportAirport24.8 km

Straight-line distances (Straight-line (haversine) distance from the RERA-filed project coordinates (12.99242, 77.79707) to landmark coordinates looked up on OpenStreetMap Nominatim on 2026-10-04; road distances will be longer.), not by road — travel distance will be longer.

About Soukya Road, Whitefield

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)6.45 kmapprox. 26 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)14.7 kmapprox. 60 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)20.17 kmapprox. 82 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)21.38 kmapprox. 87 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)24.7 kmapprox. 100 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)25.24 kmapprox. 102 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 3Schools and colleges3 schools, 0 colleges, 0 kindergartens
  • 1Hospitals and clinics0 hospitals, 1 clinics

Nearest schools and colleges

  • Bangalore International Academy · 0.06 km

Nearest hospitals and clinics

  • Soukya International Holistic Health Center · 0.25 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Whitefield (Kadugodi) (ವೈಟ್‌ಫೀಲ್ಡ್ (ಕಾಡುಗೋಡಿ))Open now — nearest operating metro station4.25 km
  • Devangonthi (ದೇವನಗೊಂದಿ)Nearest railway station3.79 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 628 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

DS Max Sky Fields floor plans, brochure and elevations

Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.

Floor plans8 files

Approved layout plan3 files

Home typeCarpet areaHomes
2 BHK647 – 741 sq ft454
3 BHK745 – 1,023 sq ft416

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

DS Max Sky Fields possession date and construction status

  • Whole project (promoter’s RERA update)38%

    as on · 245 of 870 homes booked

Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-13.

Units sold and unsold, from RERA (Q2 2026-27)

TypeHomesBookedAvailable
2 BHK454121333
3 BHK416124292

As reported by the promoter in the quarterly update to RERA, not verified by us.

Timeline

  1. 6 Jul 2024Building plan approved (STRRPA/TP/CC/439/23-24)
  2. 25 Oct 2024RERA registration approved
  3. 1 Nov 2024Project start date; earthwork began (actual, per quarterly update)
  4. 15 May 2025Foundation work finished (actual)
  5. 18 Aug 2025Work up to plinth level finished (actual)
  6. 14 Feb 2026Basement/parking floors finished (reported 100% in Q1 2026-27 update)
  7. 30 Jun 202631% complete, 239 of 870 units booked (Q1 2026-27 update)
  8. 30 Jan 2027RCC frame scheduled to finish (estimate)
  9. 30 Sep 2030Promised completion date in the RERA record

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Construction pace from RERA quarterly filings

As on 13 Oct 2026

At the average pace so far, construction would reach 100% around Nov 2029 — about 11 months before the completion date on RERA (30 Sep 2030).

At the pace between the 4 quarterly filings we have (10% → 38% in 9 months), it would be around May 2028 — about 28 months before the RERA date.

0%25%50%75%100%2025202620272028202920302031RERA date10%28%31%38%
  • Filed on RERA
  • Average pace since start
  • Pace between filings (and 0% assumed at the start date)
  • RERA completion date

Quarterly filings

QuarterFiled onBuiltHomes booked
Q2 2026-27to 30 Sep 202613 Oct 202638%245 of 870
Q1 2026-27to 30 Jun 202614 Jul 202631%239 of 870
Q4 2025-26to 31 Mar 202613 Apr 202628%213 of 870
Q3 2025-26to 31 Dec 202512 Jan 202610%204 of 870
How we calculate

Average pace = % built ÷ months since the start date in the RERA record. Here: 38% ÷ 22.9 months (1 Nov 2024 to 30 Sep 2026) = 1.7% a month.

Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 62 ÷ 1.7 = 37.4 months → Nov 2029. This is an estimate, not a date from the builder or RERA.

Pace between filings = (38% − 10%) ÷ 9 months = 3.1% a month.

A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-13.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

Approvals and documents checklist

13 rows: approvals. Scroll inside the table to see them all.

ApprovalAuthoritySource
Building planLocal Planing Authority · No. STRRPA/TP/CC/439/23-24 · dated 2024-07-06Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (3 orders)DC Office, Bangalore Rural · No. 400241 and 2 more · dated 2022-11-04Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificatescan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Electricity Permission Letterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Water Permission Letterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building/Plotting Planscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Section Of Building/Infrastructure Plan of Plottingscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricityscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Waterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Fire Force Departmentscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Airport Authority of Indiascan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCBscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
SEIAAscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)

Only the building plan has a number and date in the RERA record; the NOCs are listed as uploaded documents (PDFs not opened).

Documents uploaded to RERA

As on 18 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — Local Planing Authority · No. STRRPA/TP/CC/439/23-24 · dated 6 Jul 2024
  • Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 18 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

DS Max Sky Fields RERA complaints

1 complaint as on Source (rera.karnataka.gov.in) (opens in a new tab)

Complaint refFiledSubjectStatusSource
01128/202615 Sep 2026Not Refunding Advanced Paid at the time of BookingUnder enquirySource (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About DS-Max Properties

Founded
2007
Headquarters
Bengaluru
Bengaluru projects
44
Delivered on time
17 of 21
RERA complaints
19
Court cases listed
6

DS Max Properties Private Limited (CIN U70102KA2007PTC041508) has 44 projects registered with Karnataka RERA in the Bengaluru area. Of the 21 whose records show an occupancy certificate, 17 got it on or before the completion date promised at registration, 3 got it after that date but within a COVID-19 extension, and Sky Grand got it two days after its extended date; Sunworth, Sovereign and Sahara show no OC although their dates have passed. Karnataka RERA lists 19 complaints against the promoter (14 disposed), mostly about late handover, refunds and unregistered sale agreements, and the court cases found include a 2024 High Court order directing the builder to help form a flat owners' association at DS-Max Starnest.

DS-Max Properties’s full record

DS-Max Properties delivery record

As on 22 Oct 2026
  • 24Projects in Bengaluru on RERA24 approved registrations under DS Max Properties Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
  • 10,303Homes registeredAs stated in each registrations.
  • 19RERA complaints5 open, 14 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
  • 1.8Complaints per 1,000 homes19 complaints ÷ 10,303 homes in its 24 registrations on Karnataka RERA in Bengaluru.
  • 9Completion filed on RERARegistrations where the promoter applied to RERA for completion; 9 with an occupancy certificate on RERA.
  • 3 of 9Filed by the date given at registrationMedian gap 10.1 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
  • 6Court cases listedFound in public court records; see the list on the builder’s page.

What the complaints are about

  • Delay in possession or delay interest6
  • Refund of booking or other money5
  • Construction quality, size or inspection2
  • Registration, sale deed or agreement2
  • Other4

19 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)

Completion filed on RERA

ProjectDate at registrationCompletion filedGap
DS Max ShrestaOC on RERA31 Jul 202625 Sep 20262 months after
DS Max Sky ShubhamOC on RERA31 Mar 202711 May 2026By the date
DS Max SenateOC on RERA30 Jun 202611 May 2026By the date
DS Max Stavam NestOC on RERA30 Jun 202611 May 2026By the date
DS-Max Sky SupremeOC on RERA31 Dec 2023extended to 30 Sep 20242 Feb 202625 months after
DS Max Sonata NestOC on RERA30 Jun 20242 Feb 202619 months after
DS Max SasmaraOC on RERA31 Dec 20242 Feb 202613 months after
Sky GrandOC on RERA31 Mar 2023extended to 30 Dec 202431 Jan 202634 months after
DS Max StavamOC on RERA31 Mar 202531 Jan 202610 months after

Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.

Handovers we checked by hand

21 rows: handovers. Scroll inside the table to see them all.

ProjectPromised (at registration)OCResultSource
DS MAX SHRESTA31 Jul 202627 May 2026On timeSource (rera.karnataka.gov.in) (opens in a new tab)
DS MAX SENATE30 Jun 202621 Jan 2025On timeSource (rera.karnataka.gov.in) (opens in a new tab)
SKY GRAND31 Mar 20231 Jan 202521 months lateSource (rera.karnataka.gov.in) (opens in a new tab)
DS MAX SKY SHUBHAM31 Mar 202716 Nov 2024On timeSource (rera.karnataka.gov.in) (opens in a new tab)
DS MAX SASMARA31 Dec 202429 Nov 2023On timeSource (rera.karnataka.gov.in) (opens in a new tab)
DS MAX STAVAM NEST30 Jun 202629 Nov 2023On timeSource (rera.karnataka.gov.in) (opens in a new tab)
DS-MAX SKY SUPREME31 Dec 202329 Nov 2023On timeSource (rera.karnataka.gov.in) (opens in a new tab)
SANGAM GRAND31 Mar 202331 May 20232 months lateSource (rera.karnataka.gov.in) (opens in a new tab)
DS MAX STAVAM31 Mar 202525 Apr 2023On timeSource (rera.karnataka.gov.in) (opens in a new tab)
DS MAX SKY CLASSIC31 Dec 20226 Jan 20231 months lateSource (rera.karnataka.gov.in) (opens in a new tab)
DS MAX SONATA NEST30 Jun 202420 Jul 2021On timeSource (rera.karnataka.gov.in) (opens in a new tab)
DS MAX SONATA31 Dec 20202 Jun 20215 months lateSource (rera.karnataka.gov.in) (opens in a new tab)
DS MAX SYNERGY31 Dec 20223 Apr 2021On timeSource (rera.karnataka.gov.in) (opens in a new tab)
Sankalp Manor30 Jun 202229 Oct 2020On timeSource (rera.karnataka.gov.in) (opens in a new tab)
DS MAX SATELLITE31 Dec 202024 Apr 2020On timeSource (rera.karnataka.gov.in) (opens in a new tab)
DS-MAX STAR LINE31 Dec 202020 Apr 2020On timeSource (rera.karnataka.gov.in) (opens in a new tab)
DS MAX SPLENDID31 Mar 201920 Dec 2018On timeSource (rera.karnataka.gov.in) (opens in a new tab)
DS MAX SAVERA30 Jun 201911 Jul 2018On timeSource (rera.karnataka.gov.in) (opens in a new tab)
DS MAX Silver Oak11 Dec 201828 May 2018On timeSource (rera.karnataka.gov.in) (opens in a new tab)
DS - Max Sparkle Nest14 Jun 201917 May 2018On timeSource (rera.karnataka.gov.in) (opens in a new tab)
DS Max Silverwood1 May 201921 Nov 2017On timeSource (rera.karnataka.gov.in) (opens in a new tab)

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)How we calculate this

What’s changed since Jul 2024

As on 18 Oct 2026
  1. 13 Oct 2026Quarterly update filed for Q2 2026-27: 38% built, 245 of 870 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 4 Oct 2026Builder’s price list seen: 2 BHK from ₹92.47 L, 3 BHK from ₹1.06 Cr Source (dsmaxproperties.com) (opens in a new tab)
  3. 15 Sep 2026Complaint 01128/2026 filed with RERA: “Not Refunding Advanced Paid at the time of Booking” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 14 Jul 2026Quarterly update filed for Q1 2026-27: 31% built, 239 of 870 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 13 Apr 2026Quarterly update filed for Q4 2025-26: 28% built, 213 of 870 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  6. 14 Feb 2026Basement/parking floors finished (reported 100% in Q1 2026-27 update) (from our research file)
  7. 12 Jan 2026Quarterly update filed for Q3 2025-26: 10% built, 204 of 870 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  8. 18 Aug 2025Work up to plinth level finished (actual) (from our research file)
  9. 15 May 2025Foundation work finished (actual) (from our research file)
  10. 1 Nov 2024Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  11. 25 Oct 2024Registered with Karnataka RERA (PRM/KA/RERA/1250/304/PR/251024/007179); completion date 30 Sep 2030 Source (rera.karnataka.gov.in) (opens in a new tab)
  12. 6 Jul 2024Building plan approved by Local Planing Authority (No. STRRPA/TP/CC/439/23-24) Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

Starts at the lowest listed price; change it to the home you want.

Example only — use your bank’s quote.

Monthly EMI
₹64,198
Down payment
₹18,49,400
Loan amount
₹73,97,600
Total interest
₹80,09,942

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

As on 4 Oct 2026

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s published “onwards” price for the home type, where it publishes one (it usually says government charges, other charges and taxes are extra). You can change it.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

Sources:Source (dsmaxproperties.com) (opens in a new tab)How we calculate this

DS Max Sky Fields FAQs

What is the RERA number of DS Max Sky Fields?

PRM/KA/RERA/1250/304/PR/251024/007179, approved on 25 October 2024.

When is possession of DS Max Sky Fields?

The RERA record gives a promised completion date of 30 September 2030. Some listing sites have shown December 2028, but the RERA date is the one the builder is bound to.

How much construction is complete at DS Max Sky Fields?

The builder's quarterly update to RERA for April-June 2026 (submitted 14 July 2026) reported 31% completion, with foundations, plinth and basements done and the RCC frame not yet reported, and 239 of 870 units booked.

What is the price of DS Max Sky Fields?

On 4 October 2026 the builder's website listed 2 BHK from Rs 92.47 lakh and 3 BHK from Rs 1.06 crore, at Rs 7,700 per sq ft of super built-up area.

Is the building plan approved?

Yes. The RERA record lists building plan number STRRPA/TP/CC/439/23-24, approved on 6 July 2024, and uploaded NOCs from BESCOM, the fire department, Airport Authority of India, KSPCB and SEIAA.

What sizes are available?

2 BHK homes have 647-741 sq ft carpet area (1,201-1,207 sq ft super built-up per the builder) and 3 BHK homes have 745-1,023 sq ft carpet area (1,388-1,738 sq ft super built-up).

How many towers, floors and units are there?

One tower of ground plus 14 floors with 58 units per floor and two basements: 870 units (454 2 BHK and 416 3 BHK), per the RERA record.

Are there any RERA complaints against the project?

Yes, one: complaint 01128/2026, filed on 15 September 2026 about a booking advance not being refunded; its status on 4 October 2026 was 'scrutiny completed'. The RERA record shows no litigation on the land.

How far is the nearest metro station?

Whitefield (Kadugodi) metro station on the Purple Line is about 4.3 km away in a straight line; the road distance will be longer.

How far is it from ITPB and the airport?

About 6.5 km to International Tech Park Bangalore and about 24.8 km to Kempegowda International Airport, both straight-line distances.

Is DS Max Sky Fields in Bengaluru city?

It is marketed as Soukya Road, Whitefield, but the RERA record places it in Hosakote taluk, Bengaluru Rural district.

What is DS-MAX's delivery record?

This file does not cover the builder's track record; see the DS-MAX builder profile, which lists RERA completion and occupancy-certificate dates for its earlier projects.

Which banks give home loans for this project, and what is the maintenance charge?

We could not find a reliable public list of approved home-loan banks, payment plans or maintenance charges. The RERA project (escrow) account is with Punjab National Bank, M G Road branch. Ask the builder in writing about loans and charges.

More questions, answered from the RERA record

What is the completion date for DS Max Sky Fields?

The project is scheduled for completion on 30 September 2030.

How many homes are in DS Max Sky Fields?

The project has 870 homes: 416 three-bedroom units and 454 two-bedroom units.

What are the carpet area ranges for homes in DS Max Sky Fields?

Three-bedroom homes range from 745 to 1,023 sq ft carpet area. Two-bedroom homes range from 647 to 741 sq ft carpet area.

What is the RERA registration number for DS Max Sky Fields?

The RERA registration number is PRM/KA/RERA/1250/304/PR/251024/007179, registered on 25 October 2024.

Where is DS Max Sky Fields located?

The project is in Hosakote taluk, Bengaluru Rural district, with PIN code 560067.

How many floors does the tower in DS Max Sky Fields have?

The tower has 14 floors.

What is the construction progress of DS Max Sky Fields?

As of Q2 2026-27 (quarter ended 30 September 2026), construction is 38% complete with 245 homes booked out of 870 in the booking table.

How many RERA complaints have been filed against DS Max Sky Fields?

There is 1 RERA complaint on this project registration.

How many total projects does DS Max Properties have in the Bengaluru records?

DS Max Properties has 44 projects in the Bengaluru RERA records with 19 total complaints against the builder across all projects.

What bank holds the escrow for DS Max Sky Fields?

Punjab National Bank is the escrow bank for this project.

Written by AI from the RERA record above on 18 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about DS Max Sky Fields

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from DS-Max Properties? Review the builder.

Reviews of DS-Max Properties by verified buyers

No verified reviews of DS-Max Properties yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
Emmay Environs PrideEmmay environs0.3 km77Mar 2024extended—0Not collected
Riviera UnoNirvana Developers0.6 km137Jan 203065%0Not collected
United Green WoodsUnited Green Woods0.7 km282Mar 202865%0Not collected
Kumari NautilusKumari Infra Homes Private Limited0.7 km165Jan 202890%0Not collected
Sowparnika Rhythm of RainSowparnika Homes Private Limited0.8 km725Jan 203236%0Not collected
Provident BotanicoPuravankara Limited0.9 km1,275Sep 202834%0from ₹1.25 Cr

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)
  2. DS-MAX Properties official project page (sizes, prices, specifications, amenities, map location) (opens in a new tab)
  3. Houssed listing (address and coordinates cross-check) (opens in a new tab)
  4. PropertyPistol listing (address cross-check) (opens in a new tab)
  5. Address of Choice listing (gave 4 acres, which conflicts with RERA's 20,006 sq m; not used for facts) (opens in a new tab)
  6. Railway Gazette: Purple Line extension to Whitefield opens (4 April 2023) (opens in a new tab)
  7. OpenStreetMap Nominatim (landmark coordinates for straight-line distances) (opens in a new tab)
  8. Aurum PropTech Pulse copy of the RERA record (cross-check only; complaint list was out of date) (opens in a new tab)

Collected on 18 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price max (builder's site gives only 'onwards' prices); approval numbers and dates for the nocs (only listed as uploaded documents); bank approvals (one listing site shows a generic bank list including lenders no longer operating, so it was not used); payment plans; open space % (rera 'total open area' 17,087 sq m includes all non-plinth land, so it is not a landscaped open-space figure); news (no dated news found about this project); cost hints (maintenance, car parking, other charges); court cases (none found naming this project).

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1250/304/PR/251024/007179.

  • RERA record last checked: 18 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 18 Oct 2026
  • Builder price list seen: DS-MAX Properties official website

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error

More new projects nearby