Gold Star Layout
30×40, 30×42 +4 more plots by A Iqbal Khan · Medimallasandr, Hoskote, Bengaluru
Medimallasandr, Hoskote, BengaluruOpen on Google Maps (opens in a new tab)
- Completion filed with RERA
- RERA registered
- plotted
Plots still available: 138 of 138 plots were unsold when the developer filed completion with RERA (6 Nov 2025). Some may have sold since — join the group and we’ll ask the developer what is left and for a group price.
by A Iqbal Khan
Price: Price on request
Gold Star Layout at a glance
- Completion (RERA)Dec 2025Karnataka RERA
- Construction100% builtPromoter’s RERA update · as on 31 Dec 2025
- RERA complaints (project)None listedKarnataka RERA · as on 4 Oct 2026
- Approvals filed3 of 9 on RERAKarnataka RERA uploads · 4 Oct 2026
- Nearest metroHopefarm Channasandra · 8.56 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 124 min at peak30.61 km straight line · estimate
- Nearest lakeUnnamed lake · 86 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Gold Star Layout is a plotted development by A Iqbal Khan in Medimallasandr, Bengaluru with 138 plots, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2025.
Facts collected on 4 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.
Gold Star Layout buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks A Iqbal Khan for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.
- Gathering buyers
- Talking to the developer
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.
Join the Gold Star Layout buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: plot sizes, approval, land and completion
- Plot sizes (feet)
- 30×40, 30×42, 30×50, 40×40 +2 more
- Plot area
- 942 – 2,763 sq ft
- Total plots
- 138
- Layout approved by
- STRR Planning Authority
- Land
- Not found in public records yet: land area
- Land conversion orders
- 3
- Completion (RERA)
- Dec 2025
- Development (RERA update)
- 100%
Plot sizes (RERA filing)
| Size (feet) | Area | Plots |
|---|---|---|
| 30×40 | 1,200 sq ft | 74 |
| 30×42 | 1,260 sq ft | 3 |
| 30×50 | 1,500 sq ft | 2 |
| 40×40 | 1,600 sq ft | 1 |
| 40×42 | 1,680 sq ft | 1 |
| 40×50 | 2,000 sq ft | 17 |
| Odd-sized (irregular) | varies | 40 |
Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.
Approving authority as filed: Satellite Town Ring Road Planning Authority.
Land conversion orders (RERA filing)
| Survey no. | Converted for | Order | By |
|---|---|---|---|
| 104 | Residential | No. ALN/SR/73/2008-09, 8 Sep 2010 | DC Office Bengaluru Rural |
| 105/3 | Residential | No. ALN//SR/75/2008-2009, 2 Feb 2009 | DC Office Bengaluru Rural |
| 105/1 | Residential | No. ALN/SR/76/2008-09, 7 Feb 2009 | DC Office Bengaluru Rural |
RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.
Gold Star Layout RERA number and registration details
- RERA number
- PRM/KA/RERA/1250/304/PR/161025/008175
- Registered on
- 16 Oct 2025
- Promised completion
- 31 Dec 2025
- Extended to
- No extension recorded
- RERA status
- Completed
- Plots booked
- Not found in public records yet: plots booked
- Price
- Not found in public records yet: price
- Project type
- Plotted
Summary in plain English
Gold Star Layout is a plotted layout by proprietor A Iqbal Khan in Medimallasandr, Hosakote taluk, Bengaluru Rural district. The project has 138 plots of varying sizes. The completion date on RERA is 31 December 2025.
Written by AI from the RERA record above on 7 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: BoreWell
- Plot loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- Not found in public records yet: escrow bank
- Building plan (RERA)
- Satellite Town Ring Road Planning Authority · No. STRRPA/TP/AAO/26/21-22/24-25 · dated 15 Mar 2025
- Project cost declared to RERA
- ₹16.98 Cr
Amenities
Gold Star Layout location and address
- Address
- Sy.Nos104, 105/1 & 105/3 Of Medimallasandr Village , Anugondanahalli Hobli , Hosakote , Bengaluru Rural, Karnataka - 560067
- Village (RERA)
- Medimallasandr
- Locality
- HoskoteAlso known as Hosakote
- PIN code
- 560067
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.95112, 77.82362
Distances to landmarks
Not found in public records yet: landmarksAbout Hoskote
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 10.15 km | approx. 41 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 15.73 km | approx. 64 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 20.57 km | approx. 83 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 24.57 km | approx. 100 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 27.69 km | approx. 112 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 30.61 km | approx. 124 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 0Schools and colleges0 schools, 0 colleges, 0 kindergartens
- 1Hospitals and clinics1 hospitals, 0 clinics
Nearest hospitals and clinics
- Public Health Center · 1.19 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Hopefarm Channasandra (ಹೋಪ್ ಫಾರ್ಮ್ ಚನ್ನಸಂದ್ರ)Open now — nearest operating metro station8.56 km
- Devangonthi (ದೇವನಗೊಂದಿ)Nearest railway station3.87 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 86 m from the project’s RERA map point.
The site may be next to the lake. The RERA point is one approximate spot and the site boundary is not published as a shape — check the approved plan for the lake buffer.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 86 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,000 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Gold Star Layout layout plan and plot types as filed
Layout plan and brochure not published? The developer shares them only on request. We’ll get the brochure, layout plan and current price list for you, free.
Get brochure, layout plan & price| Plot type (as filed) | Area | Plots |
|---|---|---|
| Plot 9.14 m × 12.19 m | — | 74 |
| Plot 9.14 m × 12.86 m | — | 3 |
| Plot 9.14 m × 15.24 m | — | 2 |
| 9.14 x odd sites | — | 31 |
| Plot 12.19 m × 12.19 m | — | 1 |
| Plot 12.19 m × 15.24 m | — | 17 |
| Plot 12.19 m × 12.86 m | — | 1 |
| Odd-shaped plots | — | 9 |
Plot types and counts as filed with Karnataka RERA.
We have not collected the layout plan drawing; the developer’s sales team can share it.
Gold Star Layout completion date and development status
Promoter’s quarterly update to RERA for Q3 2025-26, submitted 2025-11-05.
Timeline
- 14 Jun 2022Project start date given to RERA
- 16 Oct 2025Registered with Karnataka RERA
- 6 Nov 2025Promoter applied to RERA for completion
- 31 Dec 2025Completion date given at registration
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Layout plan | Satellite Town Ring Road Planning Authority · No. STRRPA/TP/AAO/26/21-22/24-25 · dated 2025-03-15 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (3 orders) | DC Office Bengaluru Rural · No. ALN/SR/73/2008-09 and 2 more · dated 2010-09-08 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan/Demarcation Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Final Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC from ESCOMs | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC for Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — Satellite Town Ring Road Planning Authority · No. STRRPA/TP/AAO/26/21-22/24-25 · dated 15 Mar 2025
- Commencement certificate · Permission to start buildingNot on RERA yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 4 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Gold Star Layout RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About A Iqbal Khan
- Promoter type
- Proprietorship
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (4 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
A Iqbal Khan’s RERA recordA Iqbal Khan delivery record
- 1Projects in Bengaluru on RERA1 approved registration under A Iqbal Khan in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 138Plots registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 plots0 complaints ÷ 138 plots in its 1 registration on Karnataka RERA in Bengaluru.
- 1Completion filed on RERARegistrations where the promoter applied to RERA for completion; 0 with an occupancy certificate on RERA.
- 1 of 1Filed by the date given at registrationMedian gap 0 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| Gold Star Layout | 31 Dec 2025 | 6 Nov 2025 | By the date |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Jun 2022
- 6 Nov 2025Promoter applied to RERA for completion Source (rera.karnataka.gov.in) (opens in a new tab)
- 5 Nov 2025Quarterly update filed for Q3 2025-26: 100% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 16 Oct 2025Registered with Karnataka RERA (PRM/KA/RERA/1250/304/PR/161025/008175); completion date 31 Dec 2025 Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Mar 2025Building plan approved by Satellite Town Ring Road Planning Authority (No. STRRPA/TP/AAO/26/21-22/24-25) Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jun 2022Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Plot loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
Gold Star Layout FAQs
What are the plot sizes in Gold Star Layout?
The layout has plots in 6 standard sizes: 30×40 ft (1,200 sq ft, 74 plots), 40×50 ft (2,000 sq ft, 17 plots), 30×42 ft (1,260 sq ft, 3 plots), 30×50 ft (1,500 sq ft, 2 plots), 40×40 ft (1,600 sq ft, 1 plot) and 40×42 ft (1,680 sq ft, 1 plot). There are also 40 odd-sized plots whose sizes are not listed in the RERA record.
How many plots are in Gold Star Layout?
The layout has 138 plots in total.
What is the RERA registration number for Gold Star Layout?
The RERA registration number is PRM/KA/RERA/1250/304/PR/161025/008175.
Who approved the layout for Gold Star Layout?
The layout was approved by STRR Planning Authority.
How many land conversion orders are there for Gold Star Layout?
There are 3 land conversion orders for the project.
When is Gold Star Layout expected to be completed?
The completion date on RERA is 31 December 2025.
What is the current development status of Gold Star Layout?
As of the latest quarterly update for Q3 2025-26 (quarter ended 31 December 2025), the layout is 100% developed.
Are there any RERA complaints against Gold Star Layout or the developer?
There are no RERA complaints on this project and no RERA complaints against the developer across all projects on record.
Where is Gold Star Layout located?
The project is in Medimallasandr, Hosakote taluk, Bengaluru Rural district, with PIN code 560067.
How many projects does developer A Iqbal Khan have in the Bengaluru RERA record?
A Iqbal Khan has 1 project in the Bengaluru RERA record, which is Gold Star Layout.
Written by AI from the RERA record above on 7 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Gold Star Layout
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a plot from A Iqbal Khan? Review the developer.
Reviews of A Iqbal Khan by verified buyers
No verified reviews of A Iqbal Khan yet. If you bought a plot from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.
Similar projects within 5 km
| Project | Distance | Plots | Completion (RERA) | Developed | Complaints | Price |
|---|---|---|---|---|---|---|
| IriseM/s. Upstate United | 3.1 km | 166 | Jan 2029 | 84% | 0 | Not collected |
| Daiwik SayuriDaiwik Shelters Private Limited | 3.5 km | 211 | Dec 2026 | 95% | 0 | Not collected |
| Adithya Paradise -5Paradise Homes | 3.6 km | 156 | Jun 2027 | 100% | 0 | Not collected |
| Adithya Homes Paradise Phase-4Adithya Homes | 3.9 km | 85 | Jun 2026 | 100% | 0 | Not collected |
| Sai Metro City 9th PhaseSai Reniit Projects Pvt Ltd | 4.1 km | 129 | Nov 2026 | — | 0 | Not collected |
| Anthill SilverfieldsAnthill Projects LLP | 4.3 km | 211 | Mar 2027 | 80% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.
Sources and last checked dates
Collected on 4 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1250/304/PR/161025/008175.
- RERA record last checked: 4 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 5 Nov 2025
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Hoskote
Bellikere, HoskoteUnder constructionRERA registeredBuyers’ group openAnthill Silverfields
by Anthill
Price: Price on requestGet brochure & price →
- 30×40, 34×40, 30×50 +5 more
- 740 – 5,965 sq ft plots
- Approved by BMRDA
- Mar 2027
211 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Anthill Silverfields
Baguru, HoskoteUnder constructionRERA registeredBuyers’ group openRoman Orchard
by Roman
Price: Price on requestGet brochure & price →
- 30×40, 30×50
- 969 – 10,450 sq ft plots
- Approved by Local Planning Authority
- Dec 2026
664 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Roman Orchard- Chikkagattiganabbe, Hoskote© Esri, Maxar, Earthstar GeographicsReady to moveRERA registeredBuyers’ group open
JR STRR Enclave
by JR Housing
Price: Price on requestGet brochure & price →
- Plot sizes not found
- 1,285 – 3,060 sq ft plots
- Approved by BMRDA
- Apr 2026
33 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for JR STRR Enclave