North Park at a glance
- Possession (RERA)Dec 2028Karnataka RERA
- Construction100% builtPromoter’s RERA update · as on 30 Jun 2026
- Homes booked306 of 354 (86%)RERA update · as on 30 Jun 2026
- RERA complaints (project)2 complaintsKarnataka RERA · as on 21 Oct 2026
- Approvals filed7 of 9 on RERAKarnataka RERA uploads · 21 Oct 2026
- Nearest metroAirport City · 5.86 km (under construction)Open now: Krishnarajapura, 16.28 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 27 min at peak6.66 km straight line · estimate
- Nearest lakeGummanahalli Lake · 1,077 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
North Park is a residential project by Max Global Developers in Bengaluru with 354 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2028.
Not in the RERA record we collected yet: locality. This page fills in as the record is collected.
Facts collected on 21 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
North Park buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Max Global Developers for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the North Park buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 1 BHK, 2 BHK, 2.5 BHK, 3 BHK
- Carpet area
- 260 – 1,002 sq ft
- Towers
- 2
- Floors
- 22
- Total homes
- 354
- Land
- 2.25 acres
- Possession (RERA)
- Dec 2028
- Built (RERA update)
- 100%
North Park RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/472/PR/050224/006611
- Registered on
- 5 Feb 2024
- Promised completion
- 31 Dec 2028
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 306 of 354 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| Tower A | 22 | 2 | 178 |
| Tower B | 22 | 2 | 176 |
A dash (—) means the filing did not state that value.
Summary in plain English
North Park is a residential project by Max Global Developers in Yelahanka, Bengaluru Urban, with 354 homes across 2 towers. The project has 1 BHK, 2 BHK, 2.5 BHK and 3 BHK homes, and is registered with RERA for completion on 31 December 2028.
Written by AI from the RERA record above on 21 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 60.7% of land
- Water and power
- Water source filed with RERA: BoreWell,Local Authority
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- HDFC, Richmond Road Bengaluru
- Building plan (RERA)
- KIADB - Karnataka Industrial Areas Development Board · No. DO3-KIADB-00036/23-24/BP · dated 26 Oct 2023
- Project cost declared to RERA
- ₹116 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
North Park location and address
- Address
- Plot No R-9-C, Hi-Tech Defence and Aerospace Park , Industrial Area, Jala Hobli , Yelahanka , Bengaluru Urban, Karnataka - 562149
- Village (RERA)
- Not found in public records yet: village
- Locality
- BagalurAlso known as Bagaluru, Aerospace Park
- PIN code
- 562149
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.14628, 77.67879
Distances to landmarks
Not found in public records yet: landmarksAbout Bagalur
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 6.66 km | approx. 27 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 12.64 km | approx. 51 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 18.76 km | approx. 76 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 22.12 km | approx. 90 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 24.75 km | approx. 100 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 33.01 km | approx. 134 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 5Schools and colleges5 schools, 0 colleges, 0 kindergartens
- 2Hospitals and clinics1 hospitals, 1 clinics
Nearest schools and colleges
- Jawahar Navodaya Vidyalaya · 0.64 km
- Government High School · 0.76 km
- Vijaya School · 1.9 km
Nearest hospitals and clinics
- Vikrant Hospital · 0.76 km
- SLV Poly Clinic · 0.96 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Airport City (ವಿಮಾನ ನಿಲ್ದಾಣ ನಗರ)Blue Line metro, under construction5.86 km
- Doddajala (ದೊಡ್ಡಜಾಲ)Blue Line metro, under construction5.97 km
- KIAL Terminals (ಕೆಐಎಬಿ ವಿಮಾನ ನಿಲ್ದಾಣ ಟರ್ಮಿನಲ್ಸ್)Blue Line metro, under construction6.85 km
- Krishnarajapura (ಕೃಷ್ಣರಾಜಪುರ (ಕೆ.ಆರ್.ಪುರ))Open now — nearest operating metro station16.28 km
- Doddajala Nearest railway station5.61 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Gummanahalli Lake, 1,077 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Gummanahalli Lake on OpenStreetMap (opens in a new tab) 1,077 m
- Huvinayakanahalli Lake on OpenStreetMap (opens in a new tab) 1,455 m
- Bagaluru Kere on OpenStreetMap (opens in a new tab) (ಬಾಗಲೂರು ಕೆರೆ)1,462 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
North Park home types and carpet areas
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved building plan4 files

Approved Building/Plotting PlanFull PDF on RERA 
Approved Plan sheet 01.pdfFull PDF on RERA 
Approved Plan sheet 02.pdfFull PDF on RERA 
Approved Plan sheet 03.pdfFull PDF on RERA
Approved layout plan3 files

9 Village Map DemarcationFiled 30 Jan 2024 · Full PDF on RERA 
Location Demarcation using google satellite image.jpegFull PDF on RERA 
STP Demarcation.pdfFull PDF on RERA
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 1 BHK | 260 – 645 sq ft | 100 |
| 2 BHK | 260 – 914 sq ft | 185 |
| 2.5 BHK | 845 sq ft | 36 |
| 3 BHK | 1,002 sq ft | 33 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
North Park possession date and construction status
Promoter’s quarterly update to RERA for Q1 2026-27, submitted 2026-07-15.
By tower (Q1 2026-27)
Units sold and unsold, from RERA (Q1 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 1 BHK | 100 | 98 | 2 |
| 2 BHK | 192 | 148 | 44 |
| 2.5 BHK | 36 | 35 | 1 |
| 3 BHK | 26 | 25 | 1 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 1 Feb 2024Project start date given to RERA
- 5 Feb 2024Registered with Karnataka RERA
- 31 Dec 2028Completion date given at registration
Approvals and documents checklist
15 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan | KIADB - Karnataka Industrial Areas Development Board · No. DO3-KIADB-00036/23-24/BP · dated 2023-10-26 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| District Magistrate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — KIADB - Karnataka Industrial Areas Development Board · No. DO3-KIADB-00036/23-24/BP · dated 26 Oct 2023
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 21 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
North Park RERA complaints
2 complaints as on Source (rera.karnataka.gov.in) (opens in a new tab)
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| 00786/2026 | 6 Jul 2026 | Illegal Cancellation of Booking, Non Refund of E Stamp Charges, Unauthorized Deductions from Refund Amount, and Deficiency in Service in respect of Unit B-1901 at MJR North Park | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01445/2025 | 3 Dec 2025 | REFUND OF AMOUNT AND COMPENSATION under SECTION-18(3) | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Max Global Developers
- Promoter type
- Partnership Firm
- Projects on this site
- 3
- RERA complaints against promoter
- 2
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (21 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Max Global Developers’s RERA recordMax Global Developers delivery record
- 3Projects in Bengaluru on RERA4 approved registrations under Max Global Developers in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 731Homes registeredAs stated in each registrations.
- 2RERA complaints2 open, 0 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 2.7Complaints per 1,000 homes2 complaints ÷ 731 homes in its 4 registrations on Karnataka RERA in Bengaluru.
What the complaints are about
2 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Oct 2023
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 100% built, 306 of 354 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 6 Jul 2026Complaint 00786/2026 filed with RERA: “Illegal Cancellation of Booking, Non Refund of E Stamp Charges, Unauthorized Deductions from Refund Amount, and Deficiency in Service in respect of Unit B-1901 at MJR North Park” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 28 May 2026Quarterly update filed for Q4 2025-26: 95% built, 286 of 354 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jan 2026Quarterly update filed for Q3 2025-26: 90% built, 279 of 354 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 3 Dec 2025Complaint 01445/2025 filed with RERA: “REFUND OF AMOUNT AND COMPENSATION under SECTION-18(3)” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 5 Feb 2024Registered with Karnataka RERA (PRM/KA/RERA/1251/472/PR/050224/006611); completion date 31 Dec 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Feb 2024Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 26 Oct 2023Building plan approved by KIADB - Karnataka Industrial Areas Development Board (No. DO3-KIADB-00036/23-24/BP) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
North Park FAQs
What is the RERA registration number for North Park?
The RERA registration number is PRM/KA/RERA/1251/472/PR/050224/006611, registered on 5 February 2024.
How many homes are in North Park?
North Park has 354 homes: 100 homes of 1 BHK, 185 homes of 2 BHK, 36 homes of 2.5 BHK, and 33 homes of 3 BHK.
What is the carpet area range for 1 BHK homes in North Park?
1 BHK homes have carpet area between 260 and 645 sq ft.
What is the carpet area range for 2 BHK homes in North Park?
2 BHK homes have carpet area between 260 and 914 sq ft.
What is the carpet area for 2.5 BHK and 3 BHK homes in North Park?
2.5 BHK homes have carpet area of 845 sq ft, and 3 BHK homes have carpet area of 1,002 sq ft.
When is North Park expected to be completed?
North Park is registered with RERA for completion on 31 December 2028.
What is the construction progress of North Park as of June 2026?
As of the latest quarterly update for Q1 2026-27 ending 30 June 2026, construction is 100 percent complete.
How many homes are booked in North Park?
As of Q1 2026-27 ending 30 June 2026, 306 homes are booked out of 354 homes.
How many RERA complaints are there on North Park?
There are 2 RERA complaints on North Park.
What is the location and PIN code of North Park?
North Park is located in Yelahanka taluk, Bengaluru Urban district, with PIN code 562149.
Written by AI from the RERA record above on 21 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about North Park
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Max Global Developers? Review the builder.
Reviews of Max Global Developers by verified buyers
No verified reviews of Max Global Developers yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Dhruvija GopuraDhruvija Gopura | 0.1 km | 250 | Mar 2032 | 5% | 0 | Not collected |
| Soul@Godrej AnandaGodrej Properties Limited | 0.2 km | 2,210 | Aug 2028 | 63% | 1 | Not collected |
| Assetz Sora & Saki Phase 3Vedant Homes | 0.2 km | 304 | Apr 2029 | 37% | 0 | Not collected |
| Assetz Sora & SakiNetra Software Technologies Private Limited | 0.3 km | 992 | Jul 2029 | — | 0 | Not collected |
| Godrej AnandaGodrej Properties Limited | 0.4 km | 1,612 | Jan 2027extended | 100% | 2 | from ₹1.3 Crabout ₹18,500/sq ft carpet |
| LivingTree by Kalyani DevelopersKalyani Tech Park Private Limited | 0.5 km | 2,736 | Sep 2029 | 45% | 4 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 21 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/472/PR/050224/006611.
- RERA record last checked: 21 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 15 Jul 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Bagalur
BagalurUnder constructionRERA registeredBuyers’ group openDhruvija Gopura
by Dhruvija Gopura
Price: Price on requestGet brochure & price →
- Studio, 1 BHK, 2 BHK, 3 BHK
- 181 – 1,262 sq ft
- Mar 2032
250 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Dhruvija Gopura
BagalurUnder constructionRERA registeredBuyers’ group openSoul@Godrej Ananda
by Godrej Properties
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 2.5 BHK, 3 BHK
- 191 – 896 sq ft
- Aug 2028
2,210 homes · 1 RERA complaint
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Soul@Godrej Ananda
BagalurUnder constructionRERA registeredBuyers’ group openAssetz Sora & Saki Phase 3
by Vedant Homes
Price: Price on requestGet brochure & price →
- Studio, 3 BHK, 4 BHK
- 202 – 1,476 sq ft
- Apr 2029
304 homes
Be one of the first 10 buyers in this groupFounding members — it’s free