Ramky Lumina
1, 2 & 3 BHK apartments by Royaume Estates Private Limited · Hosur Road, Bengaluru
Hosur Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
by Royaume Estates Private Limited
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Ramky Lumina at a glance
- Possession (RERA)Dec 2028 ExtendedWas Sep 2023 · Karnataka RERA
- Construction51% built · on pace for Feb 2036 85 mo after RERA dateRERA filing to 30 Sep 2026; estimate from average pace
- Homes booked313 of 1,458 (21%)RERA update · as on 30 Sep 2026
- RERA complaints (project)1 complaintKarnataka RERA · as on 20 Oct 2026
- Approvals filed1 of 9 on RERAKarnataka RERA uploads · 20 Oct 2026
- Nearest metroBeratena Agrahara · 0.91 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 152 min at peak37.42 km straight line · estimate
- Nearest lakeUnnamed lake · 485 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Ramky Lumina is a residential project by Royaume Estates Private Limited in Bengaluru with 1,458 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2028.
Not in the RERA record we collected yet: locality. This page fills in as the record is collected.
Facts collected on 20 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Ramky Lumina buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Royaume Estates Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Ramky Lumina buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 1 BHK, 2 BHK, 3 BHK
- Carpet area
- 391 – 1,030 sq ft
- Towers
- 6
- Floors
- 14
- Total homes
- 1,458
- Land
- 7.25 acres
- Possession (extended)
- Dec 2028
- Built (RERA update)
- 51%
Ramky Lumina RERA number and registration details
- RERA number
- TOR/PRM/KA/RERA/1251/310/PR/250304/000047
- Registered on
- 4 Mar 2025
- Promised completion
- 30 Sep 2023
- Extended to
- 31 Dec 2028
- RERA status
- Under construction
- Homes booked
- 313 of 1,458 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| TOWER A | 14 | 1 | 138 |
| TOWER B | 14 | 1 | 113 |
| TOWER C | 14 | 1 | 118 |
| TOWER D | 14 | 2 | 120 |
| TOWER E | 14 | 2 | 120 |
| TOWER F | 14 | 2 | 120 |
A dash (—) means the filing did not state that value.
Summary in plain English
Ramky Lumina is a residential project by Royaume Estates Private Limited in Bengaluru South with 1,458 homes across 6 towers of up to 14 floors. The project is registered with RERA and scheduled to be completed by 31 December 2028.
Written by AI from the RERA record above on 20 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 79.9% of land
- Water and power
- Not found in public records yet: water and power
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- HDFC, Richmond Road
- Project cost declared to RERA
- ₹406 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
Ramky Lumina location and address
- Address
- Property bearing Survey No. 26/1, 26/2 , Beretana Agrahara, Begur Hobli,
- Village (RERA)
- Not found in public records yet: village
- Locality
- Hosur RoadAlso known as Hosur Main Road, NH 48
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.86631, 77.66592
Distances to landmarks
Not found in public records yet: landmarksAbout Hosur Road
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 1.85 km | approx. 8 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 6.59 km | approx. 27 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 15.58 km | approx. 63 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 16.24 km | approx. 66 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 20.83 km | approx. 84 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 37.42 km | approx. 152 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 30Schools and colleges26 schools, 4 colleges, 0 kindergartens
- 17Hospitals and clinics15 hospitals, 2 clinics
Nearest schools and colleges
- PESU Electronic City Campus · 0.51 km
- PESIT Bengaluru South · 0.54 km
- Sahana Vidya Mandira · 0.67 km
Nearest hospitals and clinics
- PESU HOSPITAL · 0.39 km
- Oxford Hospital · 0.88 km
- Swamy Hospital · 1.26 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Beratena Agrahara (ಬೆರಟೇನ ಅಗ್ರಹಾರ)Open now — nearest operating metro station0.91 km
- Huskuru (ಹುಸ್ಕೂರ್)Nearest railway station4.88 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 485 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 485 m
- Beratena Agrahara Lake on OpenStreetMap (opens in a new tab) 556 m
- Rayasandra Lake on OpenStreetMap (opens in a new tab) (ರಾಯಸಂದ್ರ ಕೆರೆ)820 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Ramky Lumina home types and carpet areas
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 1 BHK | 391 – 669 sq ft | 83 |
| 2 BHK | 687 – 827 sq ft | 158 |
| 3 BHK | 890 – 1,030 sq ft | 488 |
| Apartment | 820 sq ft | 729 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Ramky Lumina possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.
By tower (Q2 2026-27)
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 1 BHK | 83 | 34 | 49 |
| 2 BHK | 158 | 106 | 52 |
| 3 BHK | 488 | 173 | 315 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 28 Dec 2016Project start date given to RERA
- 30 Sep 2023Completion date given at registration
- 4 Mar 2025Registered with Karnataka RERA
- 31 Dec 2028Further Extension: completion date moved to this date
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Feb 2036 — about 85 months after the completion date on RERA (31 Dec 2028).
At the pace between the 4 quarterly filings we have (40% → 51% in 9 months), it would be around Jan 2030 — about 13 months after the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 14 Oct 2026 | 51% | 313 of 729 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 48% | 289 of 729 |
| Q4 2025-26to 31 Mar 2026 | 14 Apr 2026 | 44% | 271 of 729 |
| Q3 2025-26to 31 Dec 2025 | 13 Feb 2026 | 40% | 298 of 729 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 51% ÷ 117 months (28 Dec 2016 to 30 Sep 2026) = 0.4% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 49 ÷ 0.4 = 112.5 months → Feb 2036. This is an estimate, not a date from the builder or RERA.
Pace between filings = (51% − 40%) ÷ 9 months = 1.2% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | BBMP - Bruhat Bengaluru Mahanagara Palike | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Commencement certificate · Permission to start buildingNot on RERA yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBNot on RERA yet
- Electricity · BESCOMNot on RERA yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 20 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Ramky Lumina RERA complaints
1 complaint as on Source (rera.karnataka.gov.in) (opens in a new tab)
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| 00066/2026 | 30 Jan 2026 | Complaint under Section 18 for Return of Amount and Compensation due to Unfair Trade Practices and failure to offer Marketable Title | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Royaume Estates Private Limited
- Promoter type
- Company
- Projects on this site
- 1
- RERA complaints against promoter
- 12
- Company number (CIN)
- U45400KA2014PTC074588
From Karnataka RERA, as collected so far (20 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Royaume Estates Private Limited’s RERA recordRoyaume Estates Private Limited delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Royaume Estates Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 1,458Homes registeredAs stated in each registrations.
- 12RERA complaints2 open, 10 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 8.2Complaints per 1,000 homes12 complaints ÷ 1,458 homes in its 1 registration on Karnataka RERA in Bengaluru.
What the complaints are about
12 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Dec 2016
- 31 Dec 2028Completion date extended to 31 Dec 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Oct 2026Quarterly update filed for Q2 2026-27: 51% built, 313 of 729 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 48% built, 289 of 729 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Apr 2026Quarterly update filed for Q4 2025-26: 44% built, 271 of 729 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Feb 2026Quarterly update filed for Q3 2025-26: 40% built, 298 of 729 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 Jan 2026Complaint 00066/2026 filed with RERA: “Complaint under Section 18 for Return of Amount and Compensation due to Unfair Trade Practices and failure to offer Marketable Title” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 4 Mar 2025Registered with Karnataka RERA (TOR/PRM/KA/RERA/1251/310/PR/250304/000047); completion date 30 Sep 2023 Source (rera.karnataka.gov.in) (opens in a new tab)
- 28 Dec 2016Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Ramky Lumina FAQs
What is the completion date for Ramky Lumina?
The current completion date on RERA is 31 December 2028. The project has received one extension.
When was Ramky Lumina registered with RERA?
Ramky Lumina was registered with RERA on 4 March 2025.
How many homes are in Ramky Lumina and what types are available?
The project has 1,458 homes: 729 apartments at 820 sq ft carpet area, 488 three-bedroom homes (890 to 1,030 sq ft), 158 two-bedroom homes (687 to 827 sq ft), and 83 one-bedroom homes (391 to 669 sq ft).
What is the current construction progress of Ramky Lumina?
As of the quarter ended 30 September 2026, the project is 51% complete with 313 homes booked out of 729 homes in the booking table.
Where is Ramky Lumina located?
Ramky Lumina is located in Bengaluru South taluk, Bengaluru Urban district, PIN code 560001.
How many RERA complaints are against Ramky Lumina?
There is 1 RERA complaint on this project registration.
What is the escrow bank for Ramky Lumina?
The escrow bank for the project is HDFC.
How many towers does Ramky Lumina have?
Ramky Lumina has 6 towers with a maximum of 14 floors.
How many RERA complaints are against the builder Royaume Estates Private Limited?
There are 12 RERA complaints against Royaume Estates Private Limited across all projects.
How many projects does Royaume Estates Private Limited have in the Bengaluru RERA records?
Royaume Estates Private Limited has 1 project in the Bengaluru RERA records.
Written by AI from the RERA record above on 20 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Ramky Lumina
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Royaume Estates Private Limited? Review the builder.
Reviews of Royaume Estates Private Limited by verified buyers
No verified reviews of Royaume Estates Private Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Iresh AdvaitaM/s. IRESH INFRA | 1.8 km | 40 | Dec 2027 | 100% | 0 | Not collected |
| Oracle SunriseVijaya Bhaskara Constructions | 1.8 km | 80 | Mar 2026extended | 100% | 0 | Not collected |
| GR SitaraGR Constructions | 2 km | 250 | Dec 2026 | 100% | 1 | Not collected |
| Legend ValenciaLegend Property | 2.2 km | 174 | Dec 2026 | 67% | 0 | Not collected |
| Adarsh Welkin ParkAkarshak Realty Private Limited | 2.3 km | 2,210 | Mar 2030 | — | 2 | Not collected |
| Adarsh Welkin Park VillasAdarsh Developers | 2.3 km | 115 | Oct 2027 | 71% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 20 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: TOR/PRM/KA/RERA/1251/310/PR/250304/000047.
- RERA record last checked: 20 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 20 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Hosur Road
Parappana Agrahara, Hosur RoadUnder constructionRERA registeredBuyers’ group openIresh Advaita
by M/s. IRESH INFRA
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 612 – 951 sq ft
- Dec 2027
40 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Iresh Advaita
Singasandra, Hosur RoadUnder constructionRERA registeredBuyers’ group openLegend Valencia
by Legend Property
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 834 – 1,354 sq ft
- Dec 2026
174 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Legend Valencia
Kudlu, Hosur RoadUnder constructionRERA registeredBuyers’ group openAssetz Mizumi Reserve
by Apg Community Development
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK, 4 BHK
- 967 – 1,681 sq ft
- Mar 2031
2 phases on RERA · 704 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Assetz Mizumi Reserve