Prestige Park Grove
4 BHK apartments by Prestige Projects Private Limited · Old Madras Road, Bengaluru
Old Madras Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
by Prestige Projects Private Limited
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Prestige Park Grove at a glance
- Possession (RERA)Dec 2027Karnataka RERA
- Construction65% built · on pace for May 2028 4 mo after RERA dateRERA filing to 30 Sep 2026; estimate from average pace
- Homes booked3,070 of 3,715 (83%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 22 Oct 2026
- Approvals filed7 of 9 on RERAKarnataka RERA uploads · 22 Oct 2026
- Nearest metroWhitefield (Kadugodi) · 2.61 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 85 min at peak20.99 km straight line · estimate
- Nearest lakeUnnamed lake · 79 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Prestige Park Grove is a residential project by Prestige Projects Private Limited in Bengaluru with 3,715 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2027.
Not in the RERA record we collected yet: locality. This page fills in as the record is collected.
Facts collected on 22 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Prestige Park Grove buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Prestige Projects Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Prestige Park Grove buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 1 BHK, 2 BHK, 3 BHK, 3.5 BHK, +2 more
- Carpet area
- 412 – 3,153 sq ft
- Towers
- 20
- Floors
- 41
- Total homes
- 3,715
- Land
- 71.56 acres
- Possession (RERA)
- Dec 2027
- Built (RERA update)
- 65%
Prestige Park Grove RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/446/PR/100823/006141
- Registered on
- 10 Aug 2023
- Promised completion
- 31 Dec 2027
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 3,070 of 3,715 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
20 rows: towers. Scroll inside the table to see them all.
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| Tower - 1 | 23 | 2 | 94 |
| Tower - 2 | 26 | 2 | 106 |
| Tower - 3 | 29 | 2 | 118 |
| Tower - 4 | 32 | 2 | 131 |
| Tower - 5 | 35 | 2 | 143 |
| Tower - 6 | 38 | 2 | 155 |
| Tower - 7 | 35 | 2 | 142 |
| Tower - 8 | 32 | 2 | 131 |
| Tower - 9 | 29 | 3 | 238 |
| Tower - 10 | 32 | 3 | 192 |
| Tower - 11 | 35 | 3 | 210 |
| Tower - 12 | 35 | 3 | 284 |
| Tower - 13 | 32 | 3 | 260 |
| Tower - 14 | 29 | 3 | 238 |
| Tower - 15 | 35 | 3 | 209 |
| Tower - 16 | 38 | 3 | 227 |
| Tower - 17 | 41 | 3 | 245 |
| Tower - 18 | 26 | 2 | 155 |
| Tower - 19 | 29 | 2 | 349 |
| Building 9 to 96 | 1 | 0 | 88 |
A dash (—) means the filing did not state that value.
Summary in plain English
Prestige Park Grove is a residential project by Prestige Projects Private Limited in Bengaluru East with 3,715 homes across 20 towers of up to 41 floors. The project includes villas, 1-bedroom to 4-bedroom homes with carpet areas ranging from 412 sq ft to 2,914 sq ft. The completion date on RERA is 31 December 2027.
Written by AI from the RERA record above on 22 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 84.3% of land
- Water and power
- Water source filed with RERA: BoreWell,Local Authority
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- KOTAK MAHINDRA BANK, lavelle Road Bengaluru
- Building plan (RERA)
- BDA - Bangalore Development Authority · No. BDA/TPM/DLP/05/2022-23/332/2023-24 · dated 11 May 2023
- Project cost declared to RERA
- ₹5969 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Community Hall
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Prestige Park Grove location and address
- Address
- SY NOS 13/2, 30/1 (p), 30/2, 32, 33/1, 33/2, 33/3, 34/1, 36(P), 38/2, 39/2, 40/1, 40/2, 40/3, 41/1, 41/2, 41/2, 41/3, 42, 43/1, 43/2, 43/3, 44/1A, , 44/1B, 44/2, 44/3, 45/1, 45/2, 46/1A, 46/1B, 46/1C, 46/1D, 46/2, 47/1, 47/2, 47/3, 47/4, 48/1, 48/2, 48/3, 49,50/1 TO 5, 51, 52/1 TO 4 , 53/1, 53/1B, 53/2, 54, 59/1,70/2&3, 70/4, 70/5, 71/1, 71/2, , Bengaluru East , Bengaluru Urban, Karnataka - 560067
- Village (RERA)
- Not found in public records yet: village
- Locality
- Old Madras RoadAlso known as OMR, Old Madras Road
- PIN code
- 560067
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.01917, 77.75741
Distances to landmarks
Not found in public records yet: landmarksAbout Old Madras Road
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 4.1 km | approx. 17 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 13.45 km | approx. 54 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 15.24 km | approx. 62 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 20.86 km | approx. 84 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 20.99 km | approx. 85 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 21.34 km | approx. 86 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 8Schools and colleges8 schools, 0 colleges, 0 kindergartens
- 4Hospitals and clinics3 hospitals, 1 clinics
Nearest schools and colleges
- Chrysalis High School · 1.05 km
- Valistus International School · 1.41 km
- Chryalis High · 1.73 km
Nearest hospitals and clinics
- Miracle Hospital · 1.13 km
- Nationwide Kadugodi Clinic · 1.22 km
- Kannamangala Primary Health Center · 1.33 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Whitefield (Kadugodi) (ವೈಟ್ಫೀಲ್ಡ್ (ಕಾಡುಗೋಡಿ))Open now — nearest operating metro station2.61 km
- Whitefield (ವೈಟ್ಫೀಲ್ಡ್)Nearest railway station2.57 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 79 m from the project’s RERA map point.
The site may be next to the lake. The RERA point is one approximate spot and the site boundary is not published as a shape — check the approved plan for the lake buffer.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 79 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 689 m
- Bidare Agrahara Lake on OpenStreetMap (opens in a new tab) 1,710 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Prestige Park Grove floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure100 pages

BrochureFull PDF on RERA 






Floor plans2 files

Typical FloorFiled 7 Aug 2023 · Full PDF on RERA 
01 OF 19 Building - 01, Tower 1, 2 & 3, First Floor PlanFiled 10 Aug 2023 · Full PDF on RERA
Approved layout plan2 files

Approved Layout PlanFull PDF on RERA 
Existing Layout PlanFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 1 bed | 412 – 739 sq ft | 373 |
| 1 bed 1 t | 490 sq ft | 8 |
| 2 bed | 673 – 1,111 sq ft | 432 |
| 2bed | 673 – 960 sq ft | 196 |
| 3 bed | 1,143 sq ft | 1,865 |
| 3 bed 2 t | 928 – 1,612 sq ft | 286 |
| 3 bed 2t | 922 – 1,147 sq ft | 186 |
| 3 bed 3 t s | 1,173 – 1,203 sq ft | 128 |
| 3 bed 3t | 1,289 – 1,348 sq ft | 466 |
| 3 bed 3t (s) | 1,158 – 1,180 sq ft | 328 |
| 3.5 bed | 1,529 sq ft | 85 |
| 3bed 2t | 510 – 947 sq ft | 227 |
| 3bed 3t | 1,290 – 1,904 sq ft | 192 |
| 3bed 3t s | 1,180 sq ft | 54 |
| 4 bed | 1,580 – 1,744 sq ft | 872 |
| 4 bed 3t | 1,529 sq ft | 85 |
| 4 bed l | 2,233 – 2,277 sq ft | 262 |
| 4 BHK | 2,553 – 3,153 sq ft | 88 |
| Villas | 2,914 sq ft | 88 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Prestige Park Grove possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.
By tower (Q2 2026-27)
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2 BED | 236 | 79 | 157 |
| 3 BED 2T | 186 | 159 | 27 |
| 4 BED 3T | 85 | 85 | 0 |
| 3 BED 3T | 466 | 394 | 72 |
| 3BED 3T | 192 | 191 | 1 |
| 4 BED | 610 | 600 | 10 |
| 3 BED 2 T | 286 | 286 | 0 |
| 4 BED L | 262 | 262 | 0 |
| 1 BED | 363 | 337 | 26 |
| 2BED | 196 | 41 | 155 |
| 3BED 3T S | 54 | 54 | 0 |
| 3 BED 3 T S | 128 | 128 | 0 |
| 1 BED 1 T | 8 | 1 | 7 |
| 3BED 2T | 227 | 87 | 140 |
| 3 BED 3T (S) | 328 | 283 | 45 |
| 4 BHK | 88 | 83 | 5 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 10 Aug 2023Registered with Karnataka RERA
- 1 Oct 2023Project start date given to RERA
- 31 Dec 2027Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around May 2028 — about 4 months after the completion date on RERA (31 Dec 2027).
At the pace between the 4 quarterly filings we have (47% → 65% in 9 months), it would be around Mar 2028 — about 2 months after the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 14 Oct 2026 | 65% | 3,070 of 3,715 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 58% | 3,068 of 3,715 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 54% | 3,068 of 3,715 |
| Q3 2025-26to 31 Dec 2025 | 14 Jan 2026 | 47% | 3,067 of 3,715 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 65% ÷ 36 months (1 Oct 2023 to 30 Sep 2026) = 1.8% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 35 ÷ 1.8 = 19.4 months → May 2028. This is an estimate, not a date from the builder or RERA.
Pace between filings = (65% − 47%) ÷ 9 months = 2% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
12 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan | BDA - Bangalore Development Authority · No. BDA/TPM/DLP/05/2022-23/332/2023-24 · dated 2023-05-11 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (44 orders) | Deputy Commissioner, Bangalore · No. ALN(EBK)SR/15/2015-16 and 43 more · dated 2023-01-20 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BDA - Bangalore Development Authority · No. BDA/TPM/DLP/05/2022-23/332/2023-24 · dated 11 May 2023
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMNot on RERA yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 22 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Prestige Park Grove RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Prestige Projects Private Limited
- Promoter type
- Company
- Projects on this site
- 7
- RERA complaints against promoter
- 17
- Company number (CIN)
- U45201KA2008PTC046784
From Karnataka RERA, as collected so far (22 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Prestige Projects Private Limited’s RERA recordPrestige Projects Private Limited delivery record
- 7Projects in Bengaluru on RERA9 approved registrations under Prestige Projects Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 13,158Homes registeredAs stated in each registrations.
- 17RERA complaints12 open, 5 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 1.3Complaints per 1,000 homes17 complaints ÷ 13,158 homes in its 9 registrations on Karnataka RERA in Bengaluru.
- 4Completion filed on RERARegistrations where the promoter applied to RERA for completion; 4 with an occupancy certificate on RERA.
- 0 of 4Filed by the date given at registrationMedian gap 6.2 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
What the complaints are about
17 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| Meridian Park Phase III @ The Prestige CityOC on RERA | 28 Feb 2026extended to 27 Aug 2026 | 10 Sep 2026 | 6 months after |
| Meridian Park Phase II @ The Prestige CityOC on RERA | 14 Jan 2026extended to 13 Jul 2026 | 31 Jul 2026 | 7 months after |
| Meridian Park Phase I @ The Prestige CityOC on RERA | 14 Jul 2025extended to 14 Jan 2026 | 14 Jan 2026 | 6 months after |
| Eden Park @ The Prestige CityOC on RERA | 31 May 2025extended to 30 Nov 2025 | 28 Nov 2025 | 6 months after |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since May 2023
- 14 Oct 2026Quarterly update filed for Q2 2026-27: 65% built, 3,070 of 3,715 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 58% built, 3,068 of 3,715 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 54% built, 3,068 of 3,715 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jan 2026Quarterly update filed for Q3 2025-26: 47% built, 3,067 of 3,715 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Oct 2023Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Aug 2023Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/100823/006141); completion date 31 Dec 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 May 2023Building plan approved by BDA - Bangalore Development Authority (No. BDA/TPM/DLP/05/2022-23/332/2023-24) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Prestige Park Grove FAQs
What is the completion date for Prestige Park Grove?
The completion date on RERA is 31 December 2027.
How many homes are in Prestige Park Grove?
The project has 3,715 homes across 20 towers.
What home types are available in Prestige Park Grove?
The project has villas (88), 1-bedroom, 2-bedroom, 3-bedroom, 3.5-bedroom, and 4-bedroom homes in various configurations.
What is the carpet area range in Prestige Park Grove?
Carpet areas range from 412 sq ft for 1-bedroom homes to 2,914 sq ft for villas.
What is the RERA registration number for Prestige Park Grove?
The RERA registration number is PRM/KA/RERA/1251/446/PR/100823/006141.
How many homes are booked in Prestige Park Grove?
As of Q2 2026-27 (ended 30 September 2026), 3,070 homes are booked out of 3,715.
What is the construction progress of Prestige Park Grove?
As of Q2 2026-27 (ended 30 September 2026), the project is 65% complete.
Are there any RERA complaints on Prestige Park Grove?
No RERA complaints have been filed on this project.
What is the builder's RERA history?
Prestige Projects Private Limited has 17 RERA complaints across all its projects and 10 projects on record in Bengaluru.
What is the location and PIN code of Prestige Park Grove?
The project is in Bengaluru East taluk, Bengaluru Urban district, with PIN code 560067.
Written by AI from the RERA record above on 22 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Prestige Park Grove
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Prestige Projects Private Limited? Review the builder.
Reviews of Prestige Projects Private Limited by verified buyers
No verified reviews of Prestige Projects Private Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Pavani MirabiliaSai Sravanthi Infra Projects Pvt Ltd | 0.6 km | 1,624 | Mar 2031extended | — | 3 | Not collected |
| ELV High GardenELV Projects Private Limited | 0.6 km | 219 | Oct 2027extended | 30% | 7 | Not collected |
| Assetz MarqAssetz Whitefield Homes Private Limited | 1 km | 2,148 | Jul 2027extended | — | 7 | Not collected |
| SV Green ViewSri Venkateshwara Constructions | 1 km | 174 | Dec 2028 | 28% | 1 | Not collected |
| Green Edge CaseroGreen Edge Projects | 1.1 km | 117 | Dec 2026 | — | 0 | Not collected |
| Ashraya MeadowsAshraya Constructions | 1.1 km | 36 | Dec 2029 | 85% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 22 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/100823/006141.
- RERA record last checked: 22 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 22 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Old Madras Road
Kannamangala, Old Madras RoadArtist’s impressionUnder constructionRERA registeredBuyers’ group openAssetz Marq
by Assetz Whitefield Homes
Price: Price on requestGet brochure & price →
- Studio, 1 BHK, 2 BHK, 3 BHK, +1 more
- 213 – 1,612 sq ft
- Jul 2027 (extended)
4 phases on RERA · 2,148 homes · 7 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Assetz Marq
Doddabanahalli, Old Madras RoadUnder constructionRERA registeredBuyers’ group openSarang By Sumadhura
by Sumadhura Infracon
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK, 4 BHK
- 770 – 1,640 sq ft
- Jun 2027
2 phases on RERA · 410 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Sarang By Sumadhura
Kannamangala, Old Madras RoadUnder constructionRERA registeredBuyers’ group openRuchira Park East
by Ruchira
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK, 3.5 BHK
- 878 – 1,511 sq ft
- Jan 2027
284 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Ruchira Park East