Sobha Dream Gardens

1 & 2 BHK apartments by SOBHA · Belahalli, near Hennur Road, Bengaluru

Belahalli, near Hennur Road, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • residential

by SOBHA

Listed price: ₹95 L

as on · Source (sobha.com) (opens in a new tab)

Get today’s price list

Latest price for Sobha Dream Gardens

Builders change prices often and rarely publish them. Tell us how to reach you and we’ll send you the current price list.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

Sobha Dream Gardens is a residential project by Sobha Limited in Belahalli, Bengaluru with 2,690 homes, registered with Karnataka RERA. The completion date on RERA is 29 Nov 2024. It is registered in 5 phases.

Facts collected on 22 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

Sobha Dream Gardens buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks SOBHA for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the Sobha Dream Gardens buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 22 Oct 2026
Home types
1 BHK, 2 BHK
Carpet area
412 – 627 sq ft
Towers
10
Floors
23
Total homes
2,690
Land
17.53 acres
Possession (extended)
Nov 2024
Built (RERA update)
Not found in public records yet: construction progress

Sobha Dream Gardens RERA number and registration details

RERA number
PRM/KA/RERA/1251/309/PR/181122/002165
Registered on
22 Nov 2018
Promised completion
31 Dec 2028
Extended to
29 Nov 2024
RERA status
New launch
Homes booked
Not found in public records yet: homes booked
Price
₹95 L as on
Project type
Residential

5 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.

From the builder’s own website; see the price list below for size basis.

Phases and RERA numbers

PhaseRERA numberPromised completionHomesStatusSource
Phase 1 – Wing 8 and 9PRM/KA/RERA/1251/309/PR/181122/00216529 Feb 2024Extended to 29 Nov 2024728CompletedSource (rera.karnataka.gov.in) (opens in a new tab)
Phase 2 – Wing 5, 6 and 7PRM/KA/RERA/1251/309/PR/190102/00226929 Feb 2024Extended to 29 Nov 20241,092CompletedSource (rera.karnataka.gov.in) (opens in a new tab)
Phase 5 - Wing 10PRM/KA/RERA/1251/309/PR/311222/00559131 Dec 2028142New launchSource (rera.karnataka.gov.in) (opens in a new tab)
Phase 4 - Wing 1 and 2PRM/KA/RERA/1251/309/PR/311222/00559231 Dec 2028364New launchSource (rera.karnataka.gov.in) (opens in a new tab)
Phase 3 - Wing 3 and 4PRM/KA/RERA/1251/309/PR/311222/00559331 Dec 2027364New launchSource (rera.karnataka.gov.in) (opens in a new tab)

Towers and blocks (RERA filing)

TowerPhaseFloorsBasementsHomes
Wing 8Phase 1 – Wing 8 and 9231182
Wing 9Phase 1 – Wing 8 and 9231182
Wing 5Phase 2 – Wing 5, 6 and 7231182
Wing 6Phase 2 – Wing 5, 6 and 7231182
wing 7Phase 2 – Wing 5, 6 and 7231182
Wing 10Phase 5 - Wing 10171142
Wing 1Phase 4 - Wing 1 and 2231182
Wing 2Phase 4 - Wing 1 and 2231182
Wing 3Phase 3 - Wing 3 and 4231182
Wing 4Phase 3 - Wing 3 and 4231182

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sobha Dream Gardens price list

From the builder’s website, as on 15 Oct 2026
Home typeSizePrice₹ per sq ftSource
2 BHK1,004 – 1,058 sq ftunknownFrom ₹95 Lonwards—Source (sobha.com) (opens in a new tab)
2 BHK1,004 – 1,058 sq ftunknownFrom ₹95 Lonwards—Source (sobha.com) (opens in a new tab)
2 BHK1,004 – 1,058 sq ftunknownFrom ₹95 Lonwards—Source (sobha.com) (opens in a new tab)

As published by the builder on the date shown — not an offer, and not checked with the builder. Check whether the size is carpet or super built-up area before comparing.

Sources:Source (sobha.com) (opens in a new tab)

Price per sq ft vs projects within 5 km

As on 5 Oct 2026

The builder’s published prices work out to about ₹15,200 per sq ft of carpet area.

Home typeBuilder priceCarpet area (RERA)₹ per sq ft carpet
2 BHKfrom ₹95 Lseen 5 Oct 2026626 – 627 sq ft₹15,200

Worked out as the builder’s “from” price ÷ the largest and smallest carpet area RERA lists for that home type — we don’t know which unit the starting price is for. Builders usually say taxes and other charges are extra. Builder price list (sobha.com) (opens in a new tab) RERA carpet areas (rera.karnataka.gov.in) (opens in a new tab)

Sources:Source (sobha.com) (opens in a new tab)Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

Price history

As on 5 Oct 2026

One snapshot so far: the builder’s “onwards” prices seen on 5 Oct 2026. Each new check of the builder’s website adds a dated point here, so rises and offers show up with their dates.

0₹25 L₹50 L₹75 L₹1 Cr₹1.3 CrOct 26NovDecJan 27FebMarAprMayJunJulAugSepLater checks will appear here2 BHK ₹95 L
Seen onWherePrices
5 Oct 2026Builder’s website Source (sobha.com) (opens in a new tab)2 BHK from ₹95 L

Sources:Source (sobha.com) (opens in a new tab)

Summary in plain English

Sobha Limited is developing a residential project in Belahalli, Bengaluru North with 2,690 homes across 5 phases. Phases 1 and 2 are scheduled for completion on 29 November 2024, while Phases 3, 4 and 5 have completion dates between 31 December 2027 and 31 December 2028. The project has 11 RERA complaints on record.

Written by AI from the RERA record above on 22 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
Not found in public records yet: open space
Water and power
Water source filed with RERA: BWSSB
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA) · Phase 1 – Wing 8 and 9
Standard Chartered Bank, Koramangala, 5th Block
Escrow bank (RERA) · Phase 2 – Wing 5, 6 and 7
Standard Chartered Bank, Koramangala, 5th Block
Escrow bank (RERA) · Phase 5 - Wing 10
RATNAKAR BANK, PRESTIGE TOWERS, ( 0156 ) GROUND FLOOR, G-13, G-14, G-15 AND G-17, PRESTIGE TOWERS, 99, 100 RESIDENCY ROAD, BANGALORE
Escrow bank (RERA) · Phase 4 - Wing 1 and 2
RATNAKAR BANK, PRESTIGE TOWERS, ( 0156 ) GROUND FLOOR, G-13, G-14, G-15 AND G-17, PRESTIGE TOWERS, 99, 100 RESIDENCY ROAD, BANGALORE
Escrow bank (RERA) · Phase 3 - Wing 3 and 4
Axis Bank, Axis Bank M,G Road

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

  • Electricity
  • Outdoor Sports facility
  • Swimming Pool
  • Parks
  • Power Backup
  • Club House
  • Water and Sanitation

Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sobha Dream Gardens location and address

Address
Survey No. 50, 51 & 54, Belahalli Village, Yelahanka Hobli
Village (RERA)
Belahalli
Locality
Near Hennur RoadAlso known as Hennur Main Road, Hennur-Bagalur Road, Hennur
PIN code
560103
City
Bengaluru
State
Karnataka
Coordinates
13.09714, 77.64207

Distances to landmarks

Not found in public records yet: landmarks

About Belahalli

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)5.96 kmapprox. 24 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)13.35 kmapprox. 54 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)15.38 kmapprox. 62 min
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)15.99 kmapprox. 65 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)19.75 kmapprox. 80 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)27.63 kmapprox. 112 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 19Schools and colleges12 schools, 7 colleges, 0 kindergartens
  • 9Hospitals and clinics7 hospitals, 2 clinics

Nearest schools and colleges

  • Golden Chariot Public School · 0.79 km
  • Shams Public School · 1.06 km
  • KNS Institute of Technology · 1.13 km

Nearest hospitals and clinics

  • Government Primary Health Centre · 0.62 km
  • Varsha Hospital · 1.46 km
  • Sri Ragavendra Poly Clinic · 1.54 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Bagalur Cross (ಬಾಗಲೂರು ಕ್ರಾಸ್)Blue Line metro, under construction4.28 km
  • Yelahanka (ಯಲಹಂಕ)Blue Line metro, under construction4.56 km
  • Jakkur Cross (ಜಕ್ಕೂರು ಅಡ್ಡ)Blue Line metro, under construction6.1 km
  • Krishnarajapura (ಕೃಷ್ಣರಾಜಪುರ (ಕೆ.ಆರ್.ಪುರ))Open now — nearest operating metro station11.48 km
  • Yelahanka Junction (ಯಲಹಂಕ ಜಂಕ್ಷನ್)Nearest railway station5.5 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Kannuru Lake, 631 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Sobha Dream Gardens floor plans, brochure and elevations

Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.

Brochure3 files

Approved building plan6 files

Approved layout plan6 files

Home typeCarpet areaHomes
1 BHK412 – 461 sq ft184
2 BHK626 – 627 sq ft1,596
Flats589 – 625 sq ft910

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sobha Dream Gardens possession date and construction status

  • Phase 5 - Wing 1097%

    as on · 138 of 142 homes booked

  • Phase 4 - Wing 1 and 2100%

    as on · 364 of 364 homes booked

  • Phase 3 - Wing 3 and 4100%

    as on · 364 of 364 homes booked

Timeline

  1. 3 Oct 2018Phase 1 – Wing 8 and 9: Project start date given to RERA
  2. 3 Oct 2018Phase 2 – Wing 5, 6 and 7: Project start date given to RERA
  3. 22 Nov 2018Phase 1 – Wing 8 and 9: Registered with Karnataka RERA
  4. 2 Jan 2019Phase 2 – Wing 5, 6 and 7: Registered with Karnataka RERA
  5. 31 Dec 2022Phase 5 - Wing 10: Registered with Karnataka RERA
  6. 31 Dec 2022Phase 4 - Wing 1 and 2: Registered with Karnataka RERA
  7. 31 Dec 2022Phase 3 - Wing 3 and 4: Registered with Karnataka RERA
  8. 1 Jan 2023Phase 3 - Wing 3 and 4: Project start date given to RERA
  9. 1 Oct 2023Phase 5 - Wing 10: Project start date given to RERA
  10. 1 Oct 2023Phase 4 - Wing 1 and 2: Project start date given to RERA
  11. 29 Feb 2024Phase 1 – Wing 8 and 9: Completion date given at registration
  12. 29 Feb 2024Phase 2 – Wing 5, 6 and 7: Completion date given at registration
  13. 29 Nov 2024Phase 1 – Wing 8 and 9: Covid Extension: completion date moved to this date
  14. 29 Nov 2024Phase 2 – Wing 5, 6 and 7: Covid Extension: completion date moved to this date
  15. 17 Jan 2025Phase 1 – Wing 8 and 9: Promoter applied to RERA for completion
  16. 17 Jan 2025Phase 2 – Wing 5, 6 and 7: Promoter applied to RERA for completion
  17. 31 Dec 2027Phase 3 - Wing 3 and 4: Completion date given at registration
  18. 31 Dec 2028Phase 5 - Wing 10: Completion date given at registration
  19. 31 Dec 2028Phase 4 - Wing 1 and 2: Completion date given at registration

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Construction pace from RERA quarterly filings (Phase 5 - Wing 10)

As on 12 Oct 2026

At the average pace so far, construction would reach 100% around Nov 2026 — about 26 months before the completion date on RERA (31 Dec 2028).

At the pace between the 4 quarterly filings we have (61% → 97% in 9 months), it would be around Oct 2026 — about 26 months before the RERA date.

This project has 5 RERA registrations; the chart uses Phase 5 - Wing 10, the one with the most quarterly filings.

0%25%50%75%100%202420252026202720282029RERA date61%73%77%97%
  • Filed on RERA
  • Average pace since start
  • Pace between filings (and 0% assumed at the start date)
  • RERA completion date

Quarterly filings

QuarterFiled onBuiltHomes booked
Q2 2026-27to 30 Sep 202612 Oct 202697%138 of 142
Q1 2026-27to 30 Jun 202610 Jul 202677%139 of 142
Q4 2025-26to 31 Mar 20269 Apr 202673%140 of 142
Q3 2025-26to 31 Dec 202513 Jan 202661%137 of 142
How we calculate

Average pace = % built ÷ months since the start date in the RERA record. Here: 97% ÷ 36 months (1 Oct 2023 to 30 Sep 2026) = 2.7% a month.

Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 3 ÷ 2.7 = 1.1 months → Nov 2026. This is an estimate, not a date from the builder or RERA.

Pace between filings = (97% − 61%) ÷ 9 months = 4% a month.

A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

Approvals and documents checklist

53 rows: approvals. Scroll inside the table to see them all.

ApprovalAuthoritySource
Building plan (Phase 1 – Wing 8 and 9)BBMP - Bruhat Bengaluru Mahanagara PalikeSource (rera.karnataka.gov.in) (opens in a new tab)
Building plan (Phase 2 – Wing 5, 6 and 7)BBMP - Bruhat Bengaluru Mahanagara PalikeSource (rera.karnataka.gov.in) (opens in a new tab)
Building plan (Phase 5 - Wing 10)BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JD North/LP/0009/2018-19 · dated 2018-10-01Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (Phase 5 - Wing 10)Deputy Commissioner, Bangalore District. · No. ALN(NAY)SR:43/2014-15 · dated 2017-04-07Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificate (Phase 5 - Wing 10)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Electricity Permission Letter (Phase 5 - Wing 10)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Water Permission Letter (Phase 5 - Wing 10)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Layout Plan (Phase 5 - Wing 10)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building/Plotting Plan (Phase 5 - Wing 10)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Section Of Building/Infrastructure Plan of Plotting (Phase 5 - Wing 10)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Conversion Certificate under section 95 of the KLR Act 1964 (Phase 5 - Wing 10)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricity (Phase 5 - Wing 10)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Water (Phase 5 - Wing 10)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approval/NOC under section 109 of KLR Act 1961 (Phase 5 - Wing 10)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Fire Force Department (Phase 5 - Wing 10)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Airport Authority of India (Phase 5 - Wing 10)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCB (Phase 5 - Wing 10)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
SEIAA (Phase 5 - Wing 10)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
NOC in case of building proposals abutting to neighbouring properties (Phase 5 - Wing 10)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Building plan (Phase 4 - Wing 1 and 2)BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JD North/0009/2018-19 · dated 2018-10-01Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (Phase 4 - Wing 1 and 2)Deputy Commissioner, Bangalore District. · No. ALN(NAY)SR:43/2014-15 · dated 2017-04-07Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificate (Phase 4 - Wing 1 and 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Electricity Permission Letter (Phase 4 - Wing 1 and 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Water Permission Letter (Phase 4 - Wing 1 and 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Layout Plan (Phase 4 - Wing 1 and 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building/Plotting Plan (Phase 4 - Wing 1 and 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Section Of Building/Infrastructure Plan of Plotting (Phase 4 - Wing 1 and 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Conversion Certificate under section 95 of the KLR Act 1964 (Phase 4 - Wing 1 and 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricity (Phase 4 - Wing 1 and 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Water (Phase 4 - Wing 1 and 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approval/NOC under section 109 of KLR Act 1961 (Phase 4 - Wing 1 and 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Fire Force Department (Phase 4 - Wing 1 and 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Airport Authority of India (Phase 4 - Wing 1 and 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCB (Phase 4 - Wing 1 and 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
SEIAA (Phase 4 - Wing 1 and 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
NOC in case of building proposals abutting to neighbouring properties (Phase 4 - Wing 1 and 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Building plan (Phase 3 - Wing 3 and 4)BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JD North/0009/2018-19 · dated 2018-10-01Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (Phase 3 - Wing 3 and 4)Deputy Commissioner, Bangalore District. · No. ALN(NAY)SR:43/2014-15 · dated 2017-04-07Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificate (Phase 3 - Wing 3 and 4)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Electricity Permission Letter (Phase 3 - Wing 3 and 4)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Water Permission Letter (Phase 3 - Wing 3 and 4)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Layout Plan (Phase 3 - Wing 3 and 4)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building/Plotting Plan (Phase 3 - Wing 3 and 4)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Section Of Building/Infrastructure Plan of Plotting (Phase 3 - Wing 3 and 4)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Conversion Certificate under section 95 of the KLR Act 1964 (Phase 3 - Wing 3 and 4)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricity (Phase 3 - Wing 3 and 4)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Water (Phase 3 - Wing 3 and 4)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approval/NOC under section 109 of KLR Act 1961 (Phase 3 - Wing 3 and 4)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Fire Force Department (Phase 3 - Wing 3 and 4)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Airport Authority of India (Phase 3 - Wing 3 and 4)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCB (Phase 3 - Wing 3 and 4)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
SEIAA (Phase 3 - Wing 3 and 4)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
NOC in case of building proposals abutting to neighbouring properties (Phase 3 - Wing 3 and 4)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA (Phase 5 - Wing 10)

As on 22 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JD North/LP/0009/2018-19 · dated 1 Oct 2018
  • Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 22 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sobha Dream Gardens RERA complaints and orders

11 complaints as on Source (rera.karnataka.gov.in) (opens in a new tab)

11 rows: rera complaints. Scroll inside the table to see them all.

Complaint refFiledSubjectStatusSource
01553/202531 Dec 2025Complaint under Section 31 of the Real Estate (Regulation and Development) Act, 2016Disposed aoSource (rera.karnataka.gov.in) (opens in a new tab)
00470/202513 Mar 2025Sobha is Asking 100% payment before getting the OC or RegistryDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00238/20253 Feb 2025100% principal amount claim prior to OC and without completing the amentiesDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00401/202419 Apr 2024Refund of flat booking cancellation amount Rs. 5 Lakhs and compensationDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00327/202427 Mar 2024bOOKING CANCELLEDDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
CMP/221128/001040728 Nov 2022Breach of promise made at the time of saleDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
CMP/221104/00101774 Nov 2022SOBHA LTD SENT MAIL THAT THEY WILL REFUND Rs 2.00 LACS ONLY OUT OF MY TOTAL AMOUNT OF Rs 4.00 LACS PAIDDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
CMP/220920/001002920 Sep 2022REFUND OF MY BOOKING AMOUNT OF Rs 4.00 LACSDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
CMP/210216/000764616 Feb 2021Refusal to refund the amountDisposed aoSource (rera.karnataka.gov.in) (opens in a new tab)
CMP/200615/000602915 Jun 2020Cancellation and refund of booking amount.Disposed aoSource (rera.karnataka.gov.in) (opens in a new tab)
CMP/200202/00053522 Feb 2020Refund as Sobha increase Price due to reduction of GSTDisposed aoSource (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About SOBHA

Founded
1995
Headquarters
Bengaluru
Bengaluru projects
15
Delivered on time
6 of 17
RERA complaints
224
Court cases listed
4

SOBHA Limited is a listed Bengaluru-headquartered developer incorporated in 1995 (CIN L45201KA1995PLC018475), with major Bengaluru projects under way including SOBHA Neopolis, Townpark and OneWorld. Of 17 Bengaluru RERA registrations with an occupancy certificate date on RERA, 6 got the OC before the original promised date; the rest came after it, mostly within COVID-era or Section 6 extensions. Karnataka RERA lists 224 complaints against the company across its projects, and court records found include owner-association disputes and a 2026 consumer order awarding a Valley View buyer compensation for delay in the sale deed.

SOBHA’s full record

SOBHA delivery record

As on 22 Oct 2026
  • 27Projects in Bengaluru on RERA60 approved registrations under Sobha Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
  • 20,806Homes registeredAs stated in each registrations.
  • 234RERA complaints32 open, 202 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
  • 11.2Complaints per 1,000 homes234 complaints ÷ 20,806 homes in its 60 registrations on Karnataka RERA in Bengaluru.
  • 12Completion filed on RERARegistrations where the promoter applied to RERA for completion; 12 with an occupancy certificate on RERA.
  • 3 of 12Filed by the date given at registrationMedian gap 9 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
  • 4Court cases listedFound in public court records; see the list on the builder’s page.

What the complaints are about

  • Refund of booking or other money116
  • Delay in possession or delay interest37
  • Construction quality, size or inspection26
  • Owners' association, amenities or documents11
  • Registration, sale deed or agreement6
  • Litigation or title disclosure1
  • Other37

234 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)

Completion filed on RERA

12 rows: completion applications. Scroll inside the table to see them all.

ProjectDate at registrationCompletion filedGap
Sobha Royal Pavilion Phase 8 - Wing 15OC on RERA30 Sep 2025extended to 30 Jun 20261 Jul 20269 months after
Sobha Royal Pavilion Phase 7 - Wing 12, 13 and 14OC on RERA30 Sep 2025extended to 30 Jun 20261 Jul 20269 months after
Sobha Royal Pavilion Phase 6 - Wing 10 and 11OC on RERA30 Sep 2025extended to 30 Jun 20261 Jul 20269 months after
Sobha Royal Pavilion Phase 5 - Wing 8 and 9OC on RERA30 Sep 2025extended to 30 Jun 20261 Jul 20269 months after
Sobha Sentosa Phase 1 Wing 7OC on RERA30 Jun 20261 Jul 2026By the date
Sobha Windsor Phase 2 Wing 3, 4 and 5OC on RERA30 Apr 202614 Apr 2026By the date
Sobha Royal Pavilion Phase 1 - Wing 6 and 7OC on RERA30 Sep 2023extended to 30 Jun 202417 Feb 202629 months after
Sobha Royal Pavilion Phase 2 - Wing 4 and 5OC on RERA30 Sep 2023extended to 30 Jun 202417 Feb 202629 months after
Sobha Lake Gardens Phase 2OC on RERA31 Mar 2024extended to 30 Dec 202518 Nov 202520 months after
Sobha Windsor Phase 1 Wing 1 and 2OC on RERA30 Nov 202514 Nov 2025By the date
Sobha Dream Gardens Phase 1 – Wing 8 and 9OC on RERA29 Feb 2024extended to 29 Nov 202417 Jan 202511 months after
Sobha Dream Gardens Phase 2 – Wing 5, 6 and 7OC on RERA29 Feb 2024extended to 29 Nov 202417 Jan 202511 months after

Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.

Handovers we checked by hand

17 rows: handovers. Scroll inside the table to see them all.

ProjectPromised (at registration)OCResultSource
SOBHA Insignia31 Mar 20265 Jan 2026On timeSource (rera.karnataka.gov.in) (opens in a new tab)
SOBHA Windsor Phase 230 Apr 202612 Nov 2025On timeSource (rera.karnataka.gov.in) (opens in a new tab)
SOBHA Windsor Phase 130 Nov 202522 Jan 2025On timeSource (rera.karnataka.gov.in) (opens in a new tab)
SOBHA Sentosa Phase 130 Jun 20263 Dec 2024On timeSource (rera.karnataka.gov.in) (opens in a new tab)
SOBHA Royal Pavilion Phase 730 Sep 20256 Feb 20264 months lateSource (rera.karnataka.gov.in) (opens in a new tab)
SOBHA Royal Pavilion Phase 530 Sep 202522 Nov 2024On timeSource (rera.karnataka.gov.in) (opens in a new tab)
SOBHA Royal Pavilion Phases 1 & 230 Sep 202313 Mar 20245 months lateSource (rera.karnataka.gov.in) (opens in a new tab)
SOBHA Dream Acres – Oasis Phase 2731 Dec 202512 Nov 2025On timeSource (rera.karnataka.gov.in) (opens in a new tab)
SOBHA Dream Acres – Tropical Greens Phase 2130 Jun 202518 Feb 20268 months lateSource (rera.karnataka.gov.in) (opens in a new tab)
SOBHA Lake Gardens Phase 231 Mar 202414 Nov 202519 months lateSource (rera.karnataka.gov.in) (opens in a new tab)
SOBHA Rajvilas30 Jun 20248 Jul 20241 months lateSource (rera.karnataka.gov.in) (opens in a new tab)
SOBHA Dream Gardens Phase 129 Feb 202428 Oct 20248 months lateSource (rera.karnataka.gov.in) (opens in a new tab)
SOBHA Dream Gardens Phase 229 Feb 202413 Mar 20241 months lateSource (rera.karnataka.gov.in) (opens in a new tab)
SOBHA Forest Edge30 Sep 20228 Sep 202311 months lateSource (rera.karnataka.gov.in) (opens in a new tab)
SOBHA HRC Pristine Phases 1–41 Jul 202226 May 202311 months lateSource (rera.karnataka.gov.in) (opens in a new tab)
SOBHA Palm Court1 May 202124 Mar 202211 months lateSource (rera.karnataka.gov.in) (opens in a new tab)
SOBHA Morzaria Grandeur 21 May 202111 May 202212 months lateSource (rera.karnataka.gov.in) (opens in a new tab)

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)Source (supremecourtcases.com) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)How we calculate this

What’s changed since Oct 2018

As on 22 Oct 2026
  1. 12 Oct 2026Phase 5 - Wing 10: Quarterly update filed for Q2 2026-27: 97% built, 138 of 142 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 12 Oct 2026Phase 4 - Wing 1 and 2: Quarterly update filed for Q2 2026-27: 100% built, 364 of 364 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 12 Oct 2026Phase 3 - Wing 3 and 4: Quarterly update filed for Q2 2026-27: 100% built, 364 of 364 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 5 Oct 2026Builder’s price list seen: 2 BHK from ₹95 L Source (sobha.com) (opens in a new tab)
  5. 10 Jul 2026Phase 5 - Wing 10: Quarterly update filed for Q1 2026-27: 77% built, 139 of 142 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  6. 10 Jul 2026Phase 4 - Wing 1 and 2: Quarterly update filed for Q1 2026-27: 100% built, 364 of 364 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  7. 10 Jul 2026Phase 3 - Wing 3 and 4: Quarterly update filed for Q1 2026-27: 100% built, 364 of 364 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  8. 9 Apr 2026Phase 5 - Wing 10: Quarterly update filed for Q4 2025-26: 73% built, 140 of 142 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  9. 9 Apr 2026Phase 4 - Wing 1 and 2: Quarterly update filed for Q4 2025-26: 95% built, 364 of 364 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  10. 9 Apr 2026Phase 3 - Wing 3 and 4: Quarterly update filed for Q4 2025-26: 100% built, 364 of 364 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  11. 13 Jan 2026Phase 5 - Wing 10: Quarterly update filed for Q3 2025-26: 61% built, 137 of 142 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  12. 13 Jan 2026Phase 4 - Wing 1 and 2: Quarterly update filed for Q3 2025-26: 90% built, 364 of 364 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  13. 12 Jan 2026Phase 3 - Wing 3 and 4: Quarterly update filed for Q3 2025-26: 100% built, 364 of 364 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  14. 31 Dec 2025Complaint 01553/2025 filed with RERA: “Complaint under Section 31 of the Real Estate (Regulation and Development) Act, 2016” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  15. 13 Mar 2025Complaint 00470/2025 filed with RERA: “Sobha is Asking 100% payment before getting the OC or Registry” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  16. 3 Feb 2025Complaint 00238/2025 filed with RERA: “100% principal amount claim prior to OC and without completing the amenties” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  17. 17 Jan 2025Phase 1 – Wing 8 and 9: Promoter applied to RERA for completion (occupancy certificate on RERA) Source (rera.karnataka.gov.in) (opens in a new tab)
  18. 17 Jan 2025Phase 2 – Wing 5, 6 and 7: Promoter applied to RERA for completion (occupancy certificate on RERA) Source (rera.karnataka.gov.in) (opens in a new tab)
  19. 29 Nov 2024Phase 1 – Wing 8 and 9: Completion date extended to 29 Nov 2024 Source (rera.karnataka.gov.in) (opens in a new tab)
  20. 29 Nov 2024Phase 2 – Wing 5, 6 and 7: Completion date extended to 29 Nov 2024 Source (rera.karnataka.gov.in) (opens in a new tab)
  21. 19 Apr 2024Complaint 00401/2024 filed with RERA: “Refund of flat booking cancellation amount Rs. 5 Lakhs and compensation” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  22. 27 Mar 2024Complaint 00327/2024 filed with RERA: “bOOKING CANCELLED” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  23. 1 Oct 2023Phase 5 - Wing 10: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  24. 1 Oct 2023Phase 4 - Wing 1 and 2: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  25. 1 Jan 2023Phase 3 - Wing 3 and 4: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  26. 31 Dec 2022Phase 5 - Wing 10: Registered with Karnataka RERA (PRM/KA/RERA/1251/309/PR/311222/005591); completion date 31 Dec 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
  27. 31 Dec 2022Phase 4 - Wing 1 and 2: Registered with Karnataka RERA (PRM/KA/RERA/1251/309/PR/311222/005592); completion date 31 Dec 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
  28. 31 Dec 2022Phase 3 - Wing 3 and 4: Registered with Karnataka RERA (PRM/KA/RERA/1251/309/PR/311222/005593); completion date 31 Dec 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
  29. 28 Nov 2022Complaint CMP/221128/0010407 filed with RERA: “Breach of promise made at the time of sale” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  30. 4 Nov 2022Complaint CMP/221104/0010177 filed with RERA: “SOBHA LTD SENT MAIL THAT THEY WILL REFUND Rs 2.00 LACS ONLY OUT OF MY TOTAL AMOUNT OF Rs 4.00 LACS PAID” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. Showing the latest 30 of 41 dated events. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

Starts at the lowest listed price; change it to the home you want.

Example only — use your bank’s quote.

Monthly EMI
₹65,955
Down payment
₹19,00,000
Loan amount
₹76,00,000
Total interest
₹82,29,096

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

As on 5 Oct 2026

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s published “onwards” price for the home type, where it publishes one (it usually says government charges, other charges and taxes are extra). You can change it.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

Sources:Source (sobha.com) (opens in a new tab)How we calculate this

Sobha Dream Gardens FAQs

What is the Sobha Limited project in Belahalli?

Sobha Limited is developing a residential project in Belahalli, Bengaluru North with PIN code 560103. The project has 2,690 homes across 5 registered phases with Karnataka RERA.

How many homes are in each phase?

Phase 1 has 728 homes, Phase 2 has 1,092 homes, Phase 3 has 364 homes, Phase 4 has 364 homes, and Phase 5 has 142 homes.

What types of homes are available?

The project offers 1 BHK, 2 BHK and flat options with carpet areas ranging from 412 sq ft to 627 sq ft depending on the home type and phase.

When will each phase be completed?

Phase 1 and Phase 2 completion date is 29 November 2024. Phase 3 completion date is 31 December 2027. Phase 4 and Phase 5 completion date is 31 December 2028.

What is the construction progress of Sobha Limited's project?

As of Q2 2026-27, Phase 3 is 100% complete with 364 homes booked, Phase 4 is 100% complete with 364 homes booked, and Phase 5 is 97% complete with 138 homes booked.

What are the RERA registration numbers?

Phase 1 is registered as PRM/KA/RERA/1251/309/PR/181122/002165, Phase 2 as PRM/KA/RERA/1251/309/PR/190102/002269, Phase 3 as PRM/KA/RERA/1251/309/PR/311222/005593, Phase 4 as PRM/KA/RERA/1251/309/PR/311222/005592, and Phase 5 as PRM/KA/RERA/1251/309/PR/311222/005591.

How many RERA complaints are on this project?

There are 11 RERA complaints on the project: 3 on Phase 1, 4 on Phase 2, 3 on Phase 3, 1 on Phase 4, and 0 on Phase 5.

How many RERA complaints has Sobha Limited had across all projects?

Sobha Limited has 234 RERA complaints across all projects in the Karnataka RERA records.

How many projects does Sobha Limited have registered in Bengaluru?

Sobha Limited has 47 projects registered in the Bengaluru RERA records.

Which banks are handling escrow?

Standard Chartered Bank handles escrow for Phase 1 and Phase 2. Ratnakar Bank handles escrow for Phase 4 and Phase 5. Axis Bank handles escrow for Phase 3.

Written by AI from the RERA record above on 22 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Sobha Dream Gardens

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from SOBHA? Review the builder.

Reviews of SOBHA by verified buyers

No verified reviews of SOBHA yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
Lakeside 24Kolte Patil Developers Ltd0.6 km131Oct 202834%0Not collected
Ranka AnkuraRanka Properties Private Limited0.7 km410Dec 202930%0Not collected
Nikoo Homes 8, Bhartiya Garden EnclaveBhartiya Urban Pvt Ltd0.7 km1,047Dec 2031—2Not collected
Prestige Camden GardensPrestige Estates Projects Ltd0.7 km117Dec 202747%0Not collected
Concorde NeoConcorde Housing Corporation Pvt Ltd0.9 km424Oct 202932%0Not collected
Brigade BricklaneBrigade Enterprises Ltd1 km749Mar 2023extended—0Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 22 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/309/PR/181122/002165, PRM/KA/RERA/1251/309/PR/190102/002269, PRM/KA/RERA/1251/309/PR/311222/005591, PRM/KA/RERA/1251/309/PR/311222/005592, PRM/KA/RERA/1251/309/PR/311222/005593.

  • RERA record last checked: 22 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 22 Oct 2026
  • Builder price list seen: 5 Oct 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error